← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Bridgeview 2
26-45 9TH STREET · Name © OpenStreetMap contributors · BIN 4020620
💬 Discuss this project
1972Year Built
8Stories
D1Building Class
R4Zoning
131,250 sfGross Floor Area
108Units
LL97 CoveredRent Stabilized45 Active Violations ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: Bridgeview II · 45,388 sf lot · 2.89 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofT-Mobile Sprint equipment modification2p · 2 filings · 6 docs
Site & exteriorRemoval of underground tank4p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bridge View II Co1703/22/2026
Clear Wireless203/21/2026
Realty Equity Holdings103/21/2026
Allied Properties103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMC Engineering104/03/2025
Com-EX Engineering of NY206/29/2021
Ashraf111/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Favio Maria Barrionuevo203/21/2026
Green Studio203/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold707/08/2026
Associated Electric Cont of NElectrical403/21/2026
J.A. Lee Electricspecialty_contractor107/08/2026
Sac WirelessGeneral Contractor107/08/2026
J. Caiazzo Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildtech Engineering6369104/03/2025
Elevated Engineering3692206/29/2021
Building Lifecycle
All (97)Filed (4)Permit Issued (6)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (1)Objection (10)Special Inspection (1)
08/17/2026
Violation issued (HPD, open)
A
07/13/2026
Violation issued (HPD, open)
C
05/07/2026
Violation issued (HPD, open)
B
05/06/2026
Violation issued (HPD, open)
A
05/01/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, closed)
C
05/01/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, open)
A
04/17/2026
Violation issued (HPD, closed)
C
04/15/2026
Violation issued (HPD, open)
B
04/15/2026
Violation issued (HPD, open)
A
04/15/2026
Violation issued (HPD, closed)
C
04/01/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, open)
B
01/25/2026
Violation issued (HPD, open)
C
01/25/2026
Violation issued (HPD, open)
C
01/25/2026
Violation issued (HPD, open)
C
11/19/2025
Violation issued (HPD, closed)
C
08/15/2025
Signed off — Alteration
Removal of 10,000 gal oil tank no longer in use as per plans submitted
Q01201213-I1
08/14/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/03/2025
Violation issued (HPD, open)
B
07/03/2025
Violation issued (HPD, open)
B
07/03/2025
Violation issued (HPD, open)
C
06/03/2025
Permit issued — Boiler Equipment
Q01201213-I1-BE
05/19/2025
Violation issued (HPD, open)
A
05/19/2025
Violation issued (HPD, closed)
A
05/19/2025
Violation issued (HPD, open)
A
05/19/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, open)
A
05/19/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, open)
A
05/19/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, closed)
C
05/19/2025
Violation issued (HPD, open)
A
05/19/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, open)
C
05/19/2025
Violation issued (HPD, open)
B
04/03/2025
Filed — Alteration
Removal of 10,000 gal oil tank no longer in use as per plans submitted
Q01201213-I1
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
12/28/2024
Violation issued (HPD, closed)
C
12/28/2024
Violation issued (HPD, closed)
C
12/18/2024
Violation issued (HPD, closed)
C
12/11/2024
Violation issued (HPD, open)
A
12/11/2024
Violation issued (HPD, open)
A
12/11/2024
Violation issued (HPD, open)
B
12/11/2024
Violation issued (HPD, open)
B
12/11/2024
Violation issued (HPD, open)
B
12/11/2024
Violation issued (HPD, open)
A
12/11/2024
Violation issued (HPD, open)
B
12/11/2024
Violation issued (HPD, open)
A
10/29/2024
Violation issued (HPD, closed)
C
07/01/2024
Violation issued (HPD, closed)
C
07/01/2024
Violation issued (HPD, closed)
B
07/01/2024
Violation issued (HPD, closed)
C
06/08/2024
Violation issued (HPD, closed)
C
06/08/2024
Violation issued (HPD, open)
B
06/08/2024
Violation issued (HPD, open)
C
03/18/2024
Violation issued (HPD, closed)
C
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJ. Caiazzo Plumbing & Heating06/03/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/25/2022
DOB NOWAntennaSigned-offMic General Contracting01/10/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/16/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY11/18/2020
DOB NOWAntennaPermit IssuedSac Wireless06/17/2019
BISMHISSUEDComcell Construction07/24/2025
BISPLISSUEDP.A.C. Heating03/14/2025
BISPLISSUEDP.A.C. Heating10/13/2023
BISMHISSUEDComcell Construction09/12/2023
BISOTISSUEDModern Services Solutions01/19/2022
BISOTISSUEDModern Services Solutions09/08/2021
BISOTISSUEDAxium Construction06/26/2020
BISMHISSUEDCharles M Dwyer03/20/2018
BISPLISSUEDTop Dog Plumbing & Heating06/13/2017
BISMHISSUEDCharles M Dwyer04/21/2017
BISPLISSUEDTop Dog Plumbing & Heating02/11/2015
BISMHISSUEDCharles M Dwyer01/21/2015
BISOTISSUEDS.N.D. Electrical Contracting09/30/2014
BISOTISSUEDAxium Construction12/23/2010
BISOTISSUEDAxium Construction07/27/2010
BISOTISSUEDArete Development07/13/2010
BISBLISSUEDMetropolitan HT & Power Co06/17/2010
BISOTISSUEDAlunique Construction09/26/2007
BIS—ISSUEDN/A03/12/1991
1 project · most recent 11/05/2020
FiledStatusContractorScope
11/05/2020Permit IssuedIlluminous Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/14/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/26/2025Tenant Protection Plan ComplianceLuis Pichardospecial
▾Documents — 118 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/28/2026Q00044280-I1Request digital key ↗
08/20/2026Q01201213-I1Request digital key ↗
08/15/2026Q00541685-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00424348-I1Request digital key ↗
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION17
05/13/2025421021566Open ↗
03/28/2025421021566Open ↗
03/06/2025421021566Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
01/31/2024421021566Open ↗
03/06/2021440667431Open ↗
10/09/2019421916403Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
10/09/2019421916403Open ↗
08/20/2018421021575Open ↗
11/29/2014421021566Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00424348-I1Open ↗
08/27/2026Q00541685-I1Open ↗
08/13/2026Q00044280-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/09/2019421916403Open ↗
07/12/2010420212718Open ↗
06/18/2010420202836Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/06/2021440667431Open ↗
10/09/2019421916403Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/12/2010420212718Open ↗
06/18/2010420202836Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/06/2021440667431Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/06/2021440667431Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q01201213-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE4
07/17/2015421021566Open ↗
02/16/2011420202836Open ↗
01/28/2011420202836Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
06/18/2010420202836Open ↗
06/18/2010420202836Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/11/2014421021566Open ↗
▸BISSCHEDULE B - PLUMBING1
06/18/2010420202836Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes1
10/09/2019421916403Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
09/08/2021440667431Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00424348-I1Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/06/2021440667431Open ↗
10/09/2019421916403Open ↗
09/11/2014421021566Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
07/12/2010420212718Open ↗
06/18/2010420202836Open ↗
06/18/2010420197263Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026Q00541685-I1Open ↗
08/13/2026Q00044280-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/09/2019421916403Open ↗
08/20/2018421021575Open ↗
11/29/2014421021566Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/14/2020421916403Open ↗
08/20/2018421021575Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/14/2020421916403Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/06/2021440667431Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/19/2022440667431Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/08/2021440667431Open ↗
03/06/2021440667431Open ↗
03/06/2021440667431Open ↗
Showing 3 of 4 on file for this type
▸BISMASONRY1
10/19/2022440667431Open ↗
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION1
01/28/2011420202836Open ↗
▸Approvals, Objections & Sign-offs13
▸BISADMINISTRATIVE OBJECTIONS5
09/11/2014421021566Open ↗
09/11/2014421021575Open ↗
07/12/2010420212718Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/20/2022440667431Open ↗
12/14/2020421916403Open ↗
08/20/2018421021575Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
03/28/2025421021566Open ↗
03/06/2025421021566Open ↗
▸BISFINAL1
10/19/2022440667431Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/03/2014420197263Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
03/06/2021440667431Open ↗
12/14/2020421916403Open ↗
10/09/2019421916403Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/19/2022440667431Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
10/09/2019421916403Open ↗
09/11/2014421021575Open ↗
09/11/2014421021566Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
05/13/2025421021566Open ↗
03/28/2025421021566Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/06/2021440667431Open ↗
▸Other Documents1
▸BISDHCR DOCUMENT1
08/06/2021421021566Open ↗