← Back
Two family converted from one family
26 BERKELEY PLACE
BROOKLYN · BIN 3019775
💬 Discuss this project
1880Year Built
3Stories
B3Building Class
R6BZoning
3,600 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: 26 BERKELEY PLACE LLC · 1,876 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof6p · 4 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 1
Cellar5p · 3 filings · 20 docs
Basement1p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2021$3.3M—Private party → 26 BERKELEY PLACE LLC$922/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLOWER LAB NY, LLCGeneral Contractor1407/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
EMPIRE CITY CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OPERA STUDIO ARCHITECTURE5970406/10/2025
JOSEPH K. BLUM CO. LLP1741205/30/2023
Building Lifecycle
All (70)Filed (6)Permit Issued (9)Signed Off (5)Inspection (4)Objection (32)Special Inspection (14)
06/23/2025
Signed off — Alteration
Installation of mechanical equipment and associated ducts and piping as per plans. There is no change in occupancy, use, or egress.
B00837606-I1
06/18/2025
Signed off — Alteration
INTERIOR RENOVATION OF 2 UNIT RESIDENTIAL BUILDING. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B00836889-I1
06/17/2025
Special inspection requirement — Mechanical Systems
Thomas Barry
06/17/2025
Special inspection requirement — Final
Thomas Barry
06/10/2025
Filed — Alteration
Installation of mechanical equipment and associated ducts and piping as per plans. There is no change in occupancy, use, or egress.
B00837606-P1
05/29/2025
Special inspection requirement — Final
Thomas Barry
05/29/2025
Special inspection requirement — Mechanical Systems
Thomas Barry
05/20/2025
Signed off — Alteration
Installation of plumbing fixtures as per plans filed. There is no change in occupancy, use, or egress.
B00837617-I1
05/14/2025
Signed off — Alteration
New skylight opening, steel dunnage support, framing, steel deck,stairway opening, window opening. There is no change in occupancy, use, or egress.
B00837624-I1
07/23/2024
Permit issued — Plumbing
B00837617-I1-PL
06/26/2024
Permit issued — Structural
B00837624-I1-ST
06/26/2024
Permit issued — General Construction
B00836889-I1-GC
06/26/2024
Permit issued — Mechanical Systems
B00837606-I1-MS
04/15/2024
Permit issued — General Construction
B00836889-I1-GC
04/15/2024
Permit issued — Structural
B00837624-I1-ST
04/15/2024
Permit issued — Mechanical Systems
B00837606-I1-MS
02/13/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/13/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/12/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00879098-I1
08/22/2023
Permit issued — Plumbing
B00837617-I1-PL
06/19/2023
Objection resolved — Addressed
06/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
06/13/2023
Objection resolved — Addressed
06/13/2023
Objection resolved — Addressed
06/13/2023
Objection resolved — Addressed
06/13/2023
Objection resolved — Addressed
06/13/2023
Objection resolved — Addressed
06/05/2023
Objection raised — Fire_Protection
06/05/2023
Objection raised — Inspections
06/05/2023
Objection raised — Fire_Protection
06/05/2023
Objection raised — Fire_Protection
06/05/2023
Objection raised — Fire_Protection
06/05/2023
Objection raised — Inspections
06/02/2023
Objection raised — Other
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Other
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Structural
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Fire_Protection
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Fire_Protection
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Structural
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Scope
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Admin
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Fire_Protection
06/02/2023
Objection resolved — Addressed
06/02/2023
Objection raised — Fire_Protection
06/02/2023
Objection resolved — Addressed
05/31/2023
Filed — Alteration
Installation of plumbing fixtures as per plans filed. There is no change in occupancy, use, or egress.
B00837617-I1
05/30/2023
Filed — Alteration
Installation of mechanical equipment and associated ducts and piping as per plans. There is no change in occupancy, use, or egress.
B00837606-I1
05/30/2023
Filed — Alteration
New skylight opening, steel dunnage support, framing, steel deck,stairway opening, window opening. There is no change in occupancy, use, or egress.
B00837624-I1
05/26/2023
Filed — Alteration
INTERIOR RENOVATION OF 2 UNIT RESIDENTIAL BUILDING. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B00836889-I1
05/23/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00879098-I1
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC07/23/2024
DOB NOWStructuralSigned-offFLOWER LAB NY, LLC06/26/2024
DOB NOWGeneral ConstructionSigned-offFLOWER LAB NY, LLC06/26/2024
DOB NOWMechanical SystemsSigned-offFLOWER LAB NY, LLC06/26/2024
DOB NOWGeneral ConstructionSigned-offFLOWER LAB NY, LLC04/15/2024
DOB NOWStructuralSigned-offFLOWER LAB NY, LLC04/15/2024
DOB NOWMechanical SystemsSigned-offFLOWER LAB NY, LLC04/15/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/22/2023
DOB NOWSupported ScaffoldSigned-offEMPIRE CITY CONSTRUCTION05/23/2023
2 projects · most recent 03/27/2025
General Wiring
FiledStatusContractorScope
03/27/2025CompleteTHE METRO GROUP ELECTRICGeneral Wiring
10/11/2023CompleteTHE METRO GROUP ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/13/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/13/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
06/17/2025Mechanical SystemsThomas Barryspecial
06/17/2025FinalThomas Barryprogress
05/29/2025FinalThomas Barryprogress
05/29/2025Mechanical SystemsThomas Barryspecial
06/16/2023Fire-Resistant Penetrations and JointsThomas Barryspecial
03/24/2023Alternative Materials - OTCR Buildings Bulletin NumberWILLIAM DEGRAAFFspecial
03/24/2023Structural Stability – Alterations of existing buildingsWILLIAM DEGRAAFFspecial
03/24/2023Structural Steel - DetailsWILLIAM DEGRAAFFspecial
03/24/2023Structural Steel - High Strength BoltingWILLIAM DEGRAAFFspecial
03/24/2023Structural Steel - WeldingWILLIAM DEGRAAFFspecial
03/24/2023Post-installed AnchorsWILLIAM DEGRAAFFspecial
03/24/2023MasonryWILLIAM DEGRAAFFspecial
03/24/2023Concrete - Cast-In-PlaceWILLIAM DEGRAAFFspecial
03/02/2023FinalWILLIAM DEGRAAFFprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00879098-I1Request digital key ↗
08/27/2026B00837624-I1Request digital key ↗
08/27/2026B00837606-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/13/2026B00837606-I1Open ↗
08/13/2026B00837606-P1Open ↗
08/13/2026B00837617-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00879098-I1Open ↗
08/27/2026B00836889-I1Open ↗
08/27/2026B00837606-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00837606-P1Open ↗
08/25/2026B00837624-I1Open ↗
08/23/2026B00837606-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B00837606-P1Open ↗
08/25/2026B00837624-I1Open ↗
08/23/2026B00837606-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00837606-P1Open ↗
08/27/2026B00837606-I1Open ↗
08/15/2026B00836889-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWProof of Historic Building4
08/13/2026B00837617-I1Open ↗
08/13/2026B00837606-I1Open ↗
08/13/2026B00837606-P1Open ↗
Showing 3 of 4 on file for this type