← Back
Condo, residential unit in walk-up building
The Bradhurst Condominium
2611 FREDRICK DOUGLASS BL · BIN 1085457
💬 Discuss this project
1896Year Built
5Stories
R2Building Class
R7-2Zoning
—Gross Floor Area
53Units
87 Open Violations 81 unresolved · 6 paperwork only ▸
Condo, residential unit in walk-up building · 2.81 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITADEL PROPERTY MANAGEMENT809/13/2026
OWNER OF 2611103/22/2026
BRADHURST CONDOMINIUM1503/22/2026
TO THE OWNER OF103/22/2026
OWNER OF 2611 FREDERIC DO303/22/2026
OWNER OF 2611 FREDERICK D203/22/2026
OWNER OF 2611 8TH AVE103/22/2026
GREATER NEW YORK HOUSING203/22/2026
LABOOTHE INC LABOOTHE INC103/22/2026
RESTURANT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC107/27/2026
COLOURBOX STUDIOS204/27/2026
A.S.III DESIGN STUDIO103/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIPLE CROWN ELECL CONTNGElectrical103/22/2026
CEPRINE CONSTRUCTION INCGeneral Contractor107/28/2026
WATSON'S PLUMBING HEATINGGeneral Contractor104/09/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OPTIMIZED ENGINEERING ASS2449103/19/2026
Building Lifecycle
All (72)Filed (4)Permit Issued (3)Violation (60)Special Inspection (5)
07/27/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01427104-I1
07/27/2026
Permit issued — Sidewalk Shed
M01427104-I1-SH
05/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2026
Special inspection requirement — Final
Marcus Colonna
04/27/2026
Filed — Alteration
Alteration of an existing commercial ground floor space with addition of partitions and finishes.
M01235933-P1
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/09/2026
Permit issued — Plumbing
M01362334-I1-PL
04/02/2026
Special inspection requirement — Final
Marcus Colonna
03/19/2026
Filed — Alteration
PROPOSED PLUMBING WORK TO INCLUDE NEW PLUMBING WORK, INSTALL NEW WASTE & WATER P[IPING., NEW FIXTURES AND STUB OUT FOR HAIR WASHING STATIONS, CUT CAP AND REMOVE EXISTING BASE BOARD AND SUPPORT RISERS INSTALL NEW BATHROOMS AND KITCHENETTE AS PER PLANS
M01362334-I1
03/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Guy Lagomarsino
09/12/2025
Permit issued — General Construction
M01235933-I1-GC
06/30/2025
Filed — Alteration
Alteration of an existing commercial ground floor space with addition of partitions and finishes.
M01235933-I1
06/12/2025
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, open)
C
04/03/2024
Violation issued (HPD, open)
A
01/21/2024
Violation issued (HPD, open)
C
01/21/2024
Violation issued (HPD, open)
C
01/21/2024
Violation issued (HPD, closed)
C
12/02/2023
Violation issued (HPD, open)
C
10/29/2023
Violation issued (HPD, closed)
A
10/29/2023
Violation issued (HPD, open)
C
10/29/2023
Violation issued (HPD, open)
B
04/29/2023
Violation issued (HPD, closed)
C
03/29/2023
Violation issued (HPD, closed)
A
01/04/2023
Violation issued (HPD, open)
B
01/04/2023
Violation issued (HPD, open)
A
01/04/2023
Violation issued (HPD, open)
A
01/04/2023
Violation issued (HPD, open)
C
01/04/2023
Violation issued (HPD, open)
C
01/04/2023
Violation issued (HPD, open)
A
09/29/2022
Violation issued (HPD, open)
C
09/29/2022
Violation issued (HPD, open)
C
09/29/2022
Violation issued (HPD, closed)
A
09/29/2022
Violation issued (HPD, open)
B
09/29/2022
Violation issued (HPD, open)
C
09/29/2022
Violation issued (ECB, closed)
Elevators
09/29/2022
Violation issued (HPD, open)
B
09/29/2022
Violation issued (HPD, open)
B
09/29/2022
Violation issued (HPD, open)
A
09/22/2022
Violation issued (HPD, open)
B
09/22/2022
Violation issued (HPD, closed)
A
09/22/2022
Violation issued (HPD, closed)
A
09/22/2022
Violation issued (HPD, closed)
A
09/22/2022
Violation issued (HPD, open)
B
09/22/2022
Violation issued (HPD, open)
B
09/22/2022
Violation issued (HPD, open)
B
07/15/2022
Violation issued (HPD, open)
B
07/15/2022
Violation issued (HPD, open)
B
11/19/2021
Violation issued (HPD, closed)
C
11/19/2021
Violation issued (HPD, closed)
C
11/03/2021
Violation issued (HPD, open)
A
11/03/2021
Violation issued (HPD, open)
A
11/03/2021
Violation issued (HPD, open)
A
11/03/2021
Violation issued (HPD, open)
A
10/29/2021
Violation issued (ECB, open)
Boilers
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/14/2019
Violation issued (HPD, open)
C
05/14/2019
Violation issued (HPD, open)
B
04/04/2019
Violation issued (HPD, open)
A
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCEPRINE CONSTRUCTION INC07/27/2026
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG04/09/2026
DOB NOWGeneral ConstructionPermit IssuedWATSON'S PLUMBING HEATING09/12/2025
BISOTISSUEDMC FAR CONTRACTORS INC09/28/2012
BISEQISSUEDSPRING SCAFFOLDING LLC04/30/2012
BISFPISSUEDFIRE COMMAND CO, INC07/08/2009
BISOTISSUEDGOLDSMITH CONST CORP05/19/2009
BISEQISSUEDEVEREST SCAFFOLDING INC11/25/2008
BISOTISSUEDABELCRAFT OF NEW_YORK09/13/2007
BISPLISSUEDWAGNER WEINTRAUB PLBG & HTG12/29/1997
BISOTISSUEDKYLE TAYLOR INTERIORS12/18/1997
BIS—ISSUEDBRADHURST DEVELOP ASSOC11/25/1996
BISSPISSUEDMASTERS MECHANICAL PLUMBING & HE07/24/1996
BISMHISSUEDABR CONSTRUCTION ,INC.07/19/1996
BISEQRE-ISSUEDMODERN CONSTRUCTION METHODS CO05/29/1996
BISPLISSUEDR&A HEATING & CONTRG CO.I03/06/1996
BISOTISSUEDABR CONSTRUCTION ,INC.02/20/1996
BIS—ISSUEDMODERN CONSTRUCTION METHODS02/07/1996
BISPLISSUEDMASTERS MECHANICAL PLMB & HTG IN06/12/1995
BIS—ISSUEDMODERN CONSTRUCTION METHODS04/19/1995
BISEQISSUEDMODERN CONSTRUCTION METHODS CO04/07/1995
1 project · most recent 03/19/2026
Water/Sanitary
FiledStatusContractorScope
03/19/2026Permit IssuedWATSON'S PLBG, HTG, & BDGWater/Sanitary
5 projects · most recent 07/10/2026
General Wiring
FiledStatusContractorScope
07/10/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
05/27/2026Permit IssuedKOPP ELECTRIC CORPGeneral Wiring
01/08/2026Permit IssuedTRIPLE CROWN ELECL CONTNG2 meters, 1 new_meters
09/13/2021Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
07/16/2020Permit IssuedJAM ELECTRICAL CORP—
1 project · most recent 07/27/2026
Sidewalk Shed
FiledStatusContractorScope
07/27/2026Permit IssuedCEPRINE CONSTRUCTION INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/05/2026Tenant Protection Plan Compliance—special
05/05/2026FinalMarcus Colonnaprogress
04/20/2026Tenant Protection Plan Compliance—special
04/02/2026FinalMarcus Colonnaprogress
03/18/2026Tenant Protection Plan ComplianceGuy Lagomarsinospecial
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/06/2026M01362334-I1Request digital key ↗
08/17/2026M01235933-P1Request digital key ↗
08/17/2026M01235933-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION9
10/13/2014122151599Open ↗
09/25/2012121386222Open ↗
05/01/2012121060537Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
10/01/2012121386222Open ↗
05/01/2012121060537Open ↗
07/08/2009120072250Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLPC Approval/Permit3
08/17/2026M01235933-P1Open ↗
08/13/2026M01235933-I1Open ↗
08/13/2026M01362334-I1Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/02/2010110415408Open ↗
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
10/13/2014122151599Open ↗
10/10/2014122151599Open ↗
09/25/2012121386222Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/13/2014122151599Open ↗
09/25/2012121386222Open ↗
05/01/2012121060537Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/06/2026M01362334-I1Open ↗
08/17/2026M01235933-P1Open ↗
08/16/2026M01427104-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/25/2012121386222Open ↗
05/01/2012121060537Open ↗
11/24/2008110415408Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026M01235933-P1Open ↗
08/28/2026M01235933-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/13/2014122151599Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M01362334-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING4
07/14/2009110482558Open ↗
07/07/2009110482558Open ↗
06/22/2009120072250Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
10/13/2014122151599Open ↗
03/18/2009110482558Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/13/2014122151599Open ↗
09/25/2012121386222Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/22/2009120072250Open ↗
03/18/2009110482558Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/24/2008110415408Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/13/2014122151599Open ↗
09/25/2012121386222Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS5
09/25/2012121386222Open ↗
05/01/2012121060537Open ↗
06/22/2009120072250Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
02/02/2010110415408Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/16/2026M01427104-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/13/2014122151599Open ↗
09/25/2012121386222Open ↗
06/22/2009120072250Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET5
10/13/2014122151599Open ↗
09/25/2012121386222Open ↗
05/01/2012121060537Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸BISSupporting Document: Fee Exempt1
02/02/2010110415408Open ↗