| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M01426775 ↗ | 28 EAST 129 STREET MANHATTAN | Alteration | Permit Issued | 07/07/2026 | 08/14/2026 | Repair and restore facades and parapets as noted in the attached plans. No changes in egress or occupancy under this application. |
| M01399209 ↗ | 24 EAST 129 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/07/2026 | — | — |
| M01426893 ↗ | 42 EAST 129 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/07/2026 | — | — |
| X01292903 ↗ | 1700 CROTONA PARK EAST BRONX | Alteration | Permit Issued | 12/01/2025 | 06/04/2026 | EMERGENCY REPAIR BRICK OF FIRE DAMAGE NORTH WALL AS PER PALANS CONSISTANT WITH DOB INSPECTOR'S INSTRUCTION AND COMPLY WITH ECB VIOLATIONS; … |
| M00393456 ↗ | 765 8 AVENUE MANHATTAN | Alteration | Permit Issued | 09/14/2020 | 05/28/2026 | Plumbing work for cellar and first floor for proposed eating & drinking establishment with comm cooking. In conjunction with renovations fil… |
| M00392638 ↗ | 765 8 AVENUE MANHATTAN | Alteration | Permit Issued | 09/14/2020 | 05/08/2026 | HVAC heating and cooling, along with two new 16' kitchen hoods and one new 8' kitchen hood for proposed restaurant. NO CHANGE TO USE, EGRESS… |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M01426775 ↗ | 28 EAST 129 STREET MANHATTAN | Alteration | Permit Issued | 07/07/2026 | 08/14/2026 | Repair and restore facades and parapets as noted in the attached plans. No changes in egress or occupancy under this application. |
| M01399209 ↗ | 24 EAST 129 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/07/2026 | — | — |
| M01426893 ↗ | 42 EAST 129 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/07/2026 | — | — |
| X01292903 ↗ | 1700 CROTONA PARK EAST BRONX | Alteration | Permit Issued | 12/01/2025 | 06/04/2026 | EMERGENCY REPAIR BRICK OF FIRE DAMAGE NORTH WALL AS PER PALANS CONSISTANT WITH DOB INSPECTOR'S INSTRUCTION AND COMPLY WITH ECB VIOLATIONS; … |
| M00393456 ↗ | 765 8 AVENUE MANHATTAN | Alteration | Permit Issued | 09/14/2020 | 05/28/2026 | Plumbing work for cellar and first floor for proposed eating & drinking establishment with comm cooking. In conjunction with renovations fil… |
| M00392638 ↗ | 765 8 AVENUE MANHATTAN | Alteration | Permit Issued | 09/14/2020 | 05/08/2026 | HVAC heating and cooling, along with two new 16' kitchen hoods and one new 8' kitchen hood for proposed restaurant. NO CHANGE TO USE, EGRESS… |
| M01257153 ↗ | 422 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 09/23/2025 | 04/23/2026 | INTERIOR RENOVATION OF APT 7BC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| X01293298 ↗ | 1700 CROTONA PARK EAST BRONX | Alteration | Permit Issued | 02/19/2026 | 04/13/2026 | REPAIRS TO ENTIRE N LINE OF APTS ON FLOORS 1 THRU 6 , AND APT 6M , WORK TO INCLUDE NEW FLOOR CEILING AND WALL FINISHES AS PER PLAN TO REMEDY… |
| M01362334 ↗ | 2611 FREDRICK DOUGLASS BL MANHATTAN | Alteration | Permit Issued | 03/19/2026 | 04/09/2026 | PROPOSED PLUMBING WORK TO INCLUDE NEW PLUMBING WORK, INSTALL NEW WASTE & WATER P[IPING., NEW FIXTURES AND STUB OUT FOR HAIR WASHING STATIONS… |
| M00858714 ↗ | 353 WEST 118 STREET MANHATTAN | Alteration | Permit Issued | 10/02/2023 | 04/02/2026 | Repair and restore facades and fire escapes as noted in the attached plans. No changes in egress or occupancy under this application. |
| M00858720 ↗ | 357 WEST 118 STREET MANHATTAN | Alteration | Permit Issued | 10/02/2023 | 04/02/2026 | Repair and restore facades and fire escapes as noted in the attached plans. No changes in egress or occupancy under this application. |
| M00858729 ↗ | 365 WEST 118 STREET MANHATTAN | Alteration | Permit Issued | 10/02/2023 | 04/02/2026 | Repair and restore facades and fire escapes as noted in the attached plans. No changes in egress or occupancy under this application. |
| M01344217 ↗ | 400 MANHATTAN AVENUE MANHATTAN | Alteration | Permit Issued | 02/02/2026 | 03/20/2026 | Renovation of Apt. 1H including bathrooms, kitchen, doors to meet ADA Compliance as per plans. No change in use, egress or occupancy under t… |
| M01009645 ↗ | 525 EAST 12 STREET MANHATTAN | Alteration CO | Permit Issued | 03/17/2024 | 01/14/2026 | HVAC WORK AS PER PLANS FILED HEREWITH. |
| B00977521 ↗ | 1627 50 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 12/27/2023 | 12/17/2025 | INSTALLING 8'-0 HIGH CONSTRUCTION FENCE AROUND THE PROPERTY |
| X00525104 ↗ | 1719 BOSTON ROAD BRONX | Alteration | Permit Issued | 05/19/2021 | 12/08/2025 | remove and replace vertical soil and waste pipes, retain fixtures in same locations, provide new water shut-off valves for bathrooms |
| M00858727 ↗ | 365 WEST 118 STREET MANHATTAN | Alteration | Signed-off | 08/08/2023 | 12/05/2025 | Replace existing soil & waste stacks at floors 1-7 and cellar underground storm & waste piping, including the house trap & fresh air inlet. … |
| X01317018 ↗ | 1700 CROTONA PARK EAST BRONX | Alteration | Filed — no permit on record | 12/01/2025 | — | — |
| M00907929 ↗ | 333 EAST 116 STREET MANHATTAN | Alteration | Signed-off | 07/26/2023 | 11/20/2025 | Facade repair work to repair issues noted on plans. No interior work. No change to use, occupancy, or egress. |
| B01206267 ↗ | 135 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 04/16/2025 | 10/23/2025 | Installation of new mechanical cooling for elevator machine rooms |
| Q01295735 ↗ | 30-04 86 STREET QUEENS | Alteration | Filed — no permit on record | 10/21/2025 | — | — |
| Q01306121 ↗ | 30-04 86 STREET QUEENS | Alteration | Filed — no permit on record | 10/21/2025 | — | — |
| M01265682 ↗ | 305 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 09/03/2025 | 10/01/2025 | Application filed to renovate 12DE with modification of Non bearing partitions with new finishes as per the plans filed herewith- no change … |
| M01196738 ↗ | 1250 3 AVENUE MANHATTAN | Alteration | Permit Issued | 08/12/2025 | 09/29/2025 | Application filed to renovate apartment 3A that includes modification of non bearing partitions with new finishes, no change to use, egress,… |
| B01225978 ↗ | 135 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 07/01/2025 | 08/21/2025 | HEREWITH FILING PLUMBING MODIFICATIONS IN CONJUNCTION WITH CONVERSION TO RESIDENTIAL UNIT PER PLANS. |
| B01188356 ↗ | 135 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 04/03/2025 | 08/19/2025 | HEREWITH FILING PLUMBING MODIFICATIONS FOR C-LINE COMPLETION ON THE 2ND THRU 15TH FLRS PER PLANS. |
| X00482905 ↗ | 1719 BOSTON ROAD BRONX | Alteration | Permit Issued | 05/18/2021 | 06/04/2025 | Proposed work at apartments on 1st thru 6th floors to include; patch and repair bathroom floors, new wall finishes at kitchens and bathrooms… |
| X00487464 ↗ | 1695 BOSTON ROAD BRONX | Alteration | Permit Issued | 05/18/2021 | 06/03/2025 | Proposed work at apartments on 1st thru 6th floors to include; patch and repair bathroom floors, new wall finishes at kitchens and bathrooms… |
| M01142206 ↗ | 371 WEST STREET MANHATTAN | Alteration | Permit Issued | 02/03/2025 | 05/05/2025 | Structural work type in conjunction with i1 alteration to upgrade structural members as per the plans filed herewith |
| M00858712 ↗ | 353 WEST 118 STREET MANHATTAN | Alteration | Signed-off | 08/22/2023 | 01/08/2025 | Replace existing soil and waste stacks at floors 1-7 and cellar underground storm and waste piping, including the house trap and fresh air i… |
| M00858711 ↗ | 353 WEST 118 STREET MANHATTAN | Alteration | Permit Issued | 10/03/2023 | 11/01/2024 | Proposed work at apts on floors 1-7 to include patch & repairs to bathroom floors, new wall finishes at kitchens & bathrooms, installation o… |
| M00858725 ↗ | 365 WEST 118 STREET MANHATTAN | Alteration | Permit Issued | 10/02/2023 | 10/21/2024 | Filing this PAA to reflect kitchen and bathroom fixtures revisions at first floor only as per as-built plans consistant with DOB Inspector's… |
| M00858715 ↗ | 357 WEST 118 STREET MANHATTAN | Alteration | Permit Issued | 10/02/2023 | 10/15/2024 | Proposed work at apts on floors 1-7 to include patch & repairs to bathroom floors, new wall finishes at kitchens & bathrooms, installation o… |
| B01056266 ↗ | 1627 50 STREET BROOKLYN | Alteration | Filed — no permit on record | 05/24/2024 | — | — |
| X01027538 ↗ | 1690 LONGFELLOW AVENUE BRONX | Alteration | Signed-off | 04/01/2024 | 05/08/2024 | APPLICATION IS FILED TO RESTORE GQS SERVICE TO EXISTING TENANT'S LAUNDRY AT FIRST FLOOR. NEW GAS PIPING FROM CELLAR GAS METER UP TO LAUNDRY … |
| B00951975 ↗ | 1627 50 STREET BROOKLYN | Alteration | Signed-off | 10/23/2023 | 05/07/2024 | Shoring plan to address violations noted in filing. |
| M00968018 ↗ | 2 PRINCE STREET MANHATTAN | Alteration | Signed-off | 12/05/2023 | 01/24/2024 | Repair of two existing vaults, no change to occupancy, use or egress. |
| M00606511 ↗ | 400 MANHATTAN AVENUE MANHATTAN | Alteration | Signed-off | 11/03/2021 | 01/12/2024 | FACADE RESTORATION THROUGHOUT THE PROPERTY ON FLOORS 1-7 AND ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00610141 ↗ | 408 MANHATTAN AVENUE MANHATTAN | Alteration | Signed-off | 01/11/2022 | 01/12/2024 | FACADE RESTORATION IN CONNECTION WITH THE CYCLE 9 FISP REPORT. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00957978 ↗ | 172 EAST 75 STREET MANHATTAN | Alteration | Signed-off | 11/27/2023 | 01/02/2024 | Sprinkler work for existing commercial space, relocation of one sprinkler head for existing sprinkler system. No change to occupancy, use, o… |
| M00858717 ↗ | 357 WEST 118 STREET MANHATTAN | Alteration | Signed-off | 08/08/2023 | 11/20/2023 | Replace existing soil and waste stacks at floors 1-7 and cellar underground storm and waste piping, including the house trap and fresh air i… |
| B00861512 ↗ | 135 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 05/26/2023 | 11/03/2023 | Filing herewith application for plumbing fixtures, piping, and riser replacement on 1-15 floors, and cellar. No change in use, egress or occ… |
| X00900594 ↗ | 1738 CROTONA PARK EAST BRONX | Alteration | Signed-off | 09/21/2023 | 10/27/2023 | FACADE REPAIRS AT NORTH AND EAST ELEVATIONS INCLUDING PARPET REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS AP… |
| B00811114 ↗ | 163 NASSAU AVENUE BROOKLYN | Alteration | Permit Issued | 02/21/2023 | 08/07/2023 | PAA-1st fl -c/r1 sink- 1 new ice maker; new location for dishwasher ; Plumbing- new1st fl 4 new floor sinks, 1 new hand sink, 1 new dishwash… |
| B00851079 ↗ | 135 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 05/12/2023 | 08/02/2023 | HEREWITH FILING FOR PLUMBING CHASES FOR C-LINE APARTMENTS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| B00816948 ↗ | 135 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 03/14/2023 | 07/13/2023 | New ventilation and HVAC for gym space |
| B00759271 ↗ | 554 WILLOUGHBY AVENUE BROOKLYN | Alteration CO | Permit Issued | 06/22/2022 | 06/26/2023 | Proposed horizontal enlargement and alteration of an existing three (3) story, two (2) family residential building - Converting to three (3)… |
| B00761529 ↗ | 556 WILLOUGHBY AVENUE BROOKLYN | Alteration CO | Permit Issued | 06/22/2022 | 06/26/2023 | Proposed horizontal enlargement and alteration of an existing three (3) story, two (2) family residential building - Converting to three (3)… |
| B00814934 ↗ | 135 EASTERN PARKWAY BROOKLYN | Alteration CO | Permit Issued | 02/14/2023 | 06/02/2023 | Filing to change of use from accessory storage to accessory fitness room in the cellar level and 1st flr conversion of a doctor's office to … |
| M00491527 ↗ | 400 MANHATTAN AVENUE MANHATTAN | Alteration | Permit Issued | 03/31/2021 | 05/30/2023 | REMOVE EXISTING FLOOR TO EXPOSE EXISTING BEAMS. INSTALL NECESSARY LEVELING AND REINSTALL PLYWOOD SUBFLOOR AND FINISH FLOORING. REMOVE AND RE… |
| B00740656 ↗ | 7406 5 AVENUE BROOKLYN | Alteration | Signed-off | 07/14/2022 | 04/05/2023 | The Legalization of a 5 ton roof top condensing unit and supporting steel dunnage on the Roof of an existing one story extension at the rear… |
| M00530771 ↗ | 710 BROADWAY MANHATTAN | Alteration | Signed-off | 06/17/2021 | 12/14/2022 | STRUCTURAL REPAIRS TO STEEL FIRE STAIR AT THE REAR OF THE BUILDING. NEW GUARDRAIL ON THE ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER T… |
| B00786586 ↗ | 120 FRANKLIN AVENUE BROOKLYN | Alteration | Permit Issued | 08/09/2022 | 11/17/2022 | REPLACE BRICK VENEER ON EXISTING CMU FACADE ON 3 SIDED SEMI DETACHED 2 FAMILY. |
| M00631114 ↗ | 522 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 12/01/2021 | 11/09/2022 | INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. |
| M00596256 ↗ | 50 MORNINGSIDE AVENUE MANHATTAN | Alteration | Signed-off | 10/07/2021 | 11/07/2022 | Proposed work at apartments on 1st thru 7th floors to include; patch and repair bathroom floors, new wall finishes at kitchens and bathrooms… |
| X00511505 ↗ | 1738 CROTONA PARK EAST BRONX | Alteration | Signed-off | 05/22/2021 | 10/05/2022 | PROPOSED FLOOR REPAIRS AT APARTMENT 5H AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00759935 ↗ | 134 DUANE STREET MANHATTAN | Alteration | Signed-off | 07/14/2022 | 07/28/2022 | Replacement of existing skylight on the roof in the back of the building. No change of use or egress. |
| B00541341 ↗ | 135 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 06/25/2021 | 07/27/2022 | GENERAL CONSTRUCTION WORK ASSOCIATED WITH REPLACING PLUMBING LINES IN THE B LINE UNITS |
| B00403096 ↗ | 114 6TH AVENUE BROOKLYN | Alteration | Signed-off | 02/05/2021 | 07/08/2022 | Installation of Mechanical Systems, Equipment and Ductwork for renovation of existing building. Filed in conjunction with Alt Type1, BIS #32… |
| B00434462 ↗ | 204 ARLINGTON AVENUE BROOKLYN | Alteration | Permit Issued | 03/26/2021 | 12/09/2021 | Modification to existing plumbing system |
| M00611133 ↗ | 50 MORNINGSIDE AVENUE MANHATTAN | Alteration | Permit Issued | 11/05/2021 | 11/17/2021 | filing to show correct plumbing riser diagram |
| Q00582965 ↗ | 50-15 VERNON BOULEVARD QUEENS | Alteration | Signed-off | 09/03/2021 | 11/10/2021 | Filing to supersede application 420798765 in order to withdraw old application. Interior renovations with no change in use, egress or occupa… |
| Q00584857 ↗ | 50-15 VERNON BOULEVARD QUEENS | Alteration | Signed-off | 09/03/2021 | 11/10/2021 | Filing to supersede application 420798765, modifications to existing sprinkler and plumbing systems. |
| X00558733 ↗ | 931 EAST 178 STREET BRONX | Alteration | Signed-off | 07/16/2021 | 10/07/2021 | EXTERIOR WORK ONLY, FRONT YARD UNDERPINNING, NEW STEPS, AND NEW MASONRY PAVERS ON FRONT YARD WALKWAY. |
| X00525106 ↗ | 1695 BOSTON ROAD BRONX | Alteration | Signed-off | 05/19/2021 | 09/01/2021 | Remove and replace vertical soil and waste pipes, retain fixtures in same locations, provide new water shut-off valves for bathrooms |
| M00528627 ↗ | 50 MORNINGSIDE AVENUE MANHATTAN | Alteration | Signed-off | 07/28/2021 | 08/09/2021 | MISC. MASONRY REPAIRS AND RESTORATION. SCRAPE AND PAINT FIRE ESCAPES |
| X00516931 ↗ | 761 DAWSON STREET BRONX | Alteration | Filed — no permit on record | 05/19/2021 | — | — |
| M00393478 ↗ | 765 8 AVENUE MANHATTAN | Alteration | Permit Issued | 10/05/2020 | 01/13/2021 | Sprinkler system upgrade for cellar and first floor for proposed restaurant. Work limited to scope shown on plans. NO CHANGE TO USE, EGRESS … |
| M00273189 ↗ | 45 EAST 85 STREET MANHATTAN | Alteration | Permit Issued | 03/05/2020 | 03/17/2020 | RENOVATION OF APT 8D FOR INSTALLATION OF NEW AC UNIT AND AIR COOLED CONDENSING UNIT. NO CHANGE OF USE, OCCUPANCY AND EGRESS. |
| S00229537 ↗ | 1150 SOUTH AVENUE STATEN ISLAND | Alteration | Permit Issued | 12/09/2019 | 12/11/2019 | Furnish and install all structural and decorative steel for canopy As Per attached Drawings G-001, S-101, S-102. |
| S00220808 ↗ | 1150 SOUTH AVENUE STATEN ISLAND | Alteration | Permit Issued | 09/13/2019 | 09/16/2019 | Installation of new HVAC unit system. |
| M00190901 ↗ | 146 EAST 46 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/12/2019 | — | — |
| Name | Jobs together | Most recent |
|---|---|---|
| OPTIMIZED ENGINEERING ASSOCIATES | 28 | 07/07/2026 |
| A.S.III DESIGN STUDIO | 23 | 03/24/2026 |
| JOCK DEBOER, AIA | 5 | 01/12/2026 |
| NETTA ARCHITECTS, LLC | 5 | 05/14/2026 |
| POLISE CONSULTING ENGINEERS DPC | 5 | 03/06/2026 |
| CHOSEN MEP, CORP. | 2 | 11/06/2024 |
| NIKOLAI KATZ ARCHITECT | 2 | 11/06/2024 |
| SOTIR ASSOCIATES | 2 | 06/23/2026 |
| AGP ARCHITECT, PC | 1 | 09/03/2021 |
| ALMA ENGINEERING, PC | 1 | 01/12/2026 |
| ANTHONY T. TAKOS, ARCHITECT | 1 | 07/14/2022 |
| EYAL LEVITT ARCHITECT PC | 1 | 07/16/2024 |
| FLORINELA MURESAN | 1 | 03/26/2026 |
| HANY RIZKALLA ARCHITECT PLLC | 1 | 10/26/2022 |
| KURV ARCHITECTURE DPC | 1 | 03/26/2026 |
| M.B. ARCHITECTURAL DESIGN | 1 | 03/26/2021 |
| MEY ASSOCIATES | 1 | 07/16/2024 |
| VASILIOS ARTEMIOU PE | 1 | 09/03/2021 |
| Name | Jobs together | Most recent |
|---|---|---|
| METRO CITY CONSTRUCTION | 10 | 03/09/2026 |
| OVERTONE CONSULTING & CON | 7 | 05/14/2026 |
| VENUS CONSTRUCTION NY INC | 6 | 10/02/2023 |
| VILLAGE P & H NY INC | 4 | 03/24/2026 |
| CITY CONSTRUCTION 1 INC | 3 | 07/07/2026 |
| HENRY MYERS P & H, INC | 3 | 03/06/2026 |
| AL PLUMBING & CONT. INC | 2 | 11/06/2024 |
| CASE PLUMBING LLC | 2 | 06/23/2026 |
| CEREBRAL BUILDERS AND DEV | 2 | 09/20/2021 |
| DPH PLUMBING & HTG CORP | 2 | 07/01/2024 |
| GRIP CONSTRUCTION CORP 2 | 2 | 12/09/2019 |
| JB & B CONSTRUCTION CORP | 2 | 09/20/2021 |
| KAY WATERPROOFING CORP | 2 | 07/26/2023 |
| MABE GROUP INC | 2 | 11/06/2024 |
| WATSON'S PLBG, HTG, & BDG | 2 | 03/19/2026 |
| YC DEVELOPERS INC | 2 | 07/16/2024 |
| A REAL GOOD PLUMBER INC | 1 | 09/03/2021 |
| CH CO INC | 1 | 12/05/2023 |
| CITY BUILDING CONSULTANTS | 1 | 10/26/2022 |
| CRAFTED INTERIORS DESIGN | 1 | 08/28/2023 |
| EAST ENDERS NYC INC | 1 | 12/24/2021 |
| ENOBRAC PLUMBING, INC | 1 | 02/24/2024 |
| FERKO PLUMBING & HEATING | 1 | 09/26/2023 |
| GAUDIOSO CONTRACTING INC | 1 | 01/12/2026 |
| JP CONSTRUCTION & HVAC LL | 1 | 03/26/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| URBAN HOME OWNERSHIP CORP | 24 | 07/07/2026 |
| TURNER TOWERS TENANT CROP. | 7 | 05/14/2026 |
| AKAM ASSOCIATES, INC. | 2 | 01/12/2026 |
| MYRTLE MANAGEMENT | 2 | 11/06/2024 |
| NMC PROPERTY MANAGEMENT | 2 | 09/03/2021 |
| 710 OWNERS CORPORATION | 1 | 06/17/2021 |
| CITADEL PROPERTY MANAGEMENT CORP | 1 | 03/19/2026 |
| EAST HARLEM GROUP, LLC | 1 | 07/26/2023 |
| GRIP CONSTRUCTION CORP | 1 | 09/13/2019 |
| J&C LAMB MANAGEMENT CORP. | 1 | 07/14/2022 |
| PALOMA COFFEE | 1 | 09/26/2023 |
| USC | 1 | 12/24/2021 |
| Name | Jobs together | Most recent |
|---|---|---|
| MARVIN SMITH PREFESSIONAL SERVICES | 13 | 03/24/2026 |
| PROFESSIONAL SOLUTIONS | 6 | 03/19/2026 |
| METROPOLIS GROUP INC | 4 | 05/14/2026 |
| A+ EXPEDITING INC. | 3 | 01/12/2026 |
| VICTOR SCHWARTZ ARCHITECT | 3 | 01/11/2022 |
| ADVANCED BUILDERS SERVICES | 2 | 11/06/2024 |
| GREEN LIGHT EXPEDITING LLC | 2 | 09/03/2021 |
| ASAP ASSOCIATES CORP | 1 | 10/26/2022 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 09/23/2025 |
| ERETZ BUILDERS ASSISTANCE. | 1 | 07/16/2024 |
| GC EXPEDITING | 1 | 08/28/2023 |
| JAM CONSULTANTS, INC. | 1 | 05/14/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/26/2026 |
| VICTOR CLAVELL | 1 | 07/16/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/16/2026 | Energy Code Compliance Inspections | 765 8 AVENUE | — | progress |
| 07/16/2026 | Fire-Resistant Penetrations and Joints | 765 8 AVENUE | Guy Lagomarsino | special |
| 07/07/2026 | Final | 28 EAST 129 STREET | Guy Lagomarsino | progress |
| 07/07/2026 | Tenant Protection Plan Compliance | 28 EAST 129 STREET | Guy Lagomarsino | special |
| 07/07/2026 | Structural Stability – Alterations of existing buildings | 28 EAST 129 STREET | Guy Lagomarsino | special |
| 07/07/2026 | Masonry | 28 EAST 129 STREET | Guy Lagomarsino | special |
| 07/07/2026 | Structural Stability – Alterations of existing buildings | 24 EAST 129 STREET | Guy Lagomarsino | special |
| 07/07/2026 | Masonry | 24 EAST 129 STREET | Guy Lagomarsino | special |
| 07/07/2026 | Masonry | 42 EAST 129 STREET | Guy Lagomarsino | special |
| 07/07/2026 | Tenant Protection Plan Compliance | 42 EAST 129 STREET | — | special |
| 07/07/2026 | Tenant Protection Plan Compliance | 24 EAST 129 STREET | — | special |
| 07/06/2026 | Structural Stability – Alterations of existing buildings | 42 EAST 129 STREET | Guy Lagomarsino | special |
| 07/06/2026 | Final | 42 EAST 129 STREET | Guy Lagomarsino | progress |
| 06/12/2026 | Fire-Resistant Penetrations and Joints | 765 8 AVENUE | Guy Lagomarsino | special |
| 06/12/2026 | Energy Code Compliance Inspections | 765 8 AVENUE | — | progress |
| 06/12/2026 | HVAC and service water heating equipment | 765 8 AVENUE | Guy Lagomarsino | energy_progress |
| 06/12/2026 | HVAC insulation and sealing | 765 8 AVENUE | Guy Lagomarsino | energy_progress |
| 06/12/2026 | HVAC and service water heating system controls | 765 8 AVENUE | Guy Lagomarsino | energy_progress |
| 06/12/2026 | HVAC and service water heating equipment | 765 8 AVENUE | Guy Lagomarsino | energy_progress |
| 06/12/2026 | Maintenance information | 765 8 AVENUE | Guy Lagomarsino | energy_progress |
| 06/12/2026 | Final | 765 8 AVENUE | Guy Lagomarsino | progress |
| 06/12/2026 | Mechanical Systems | 765 8 AVENUE | Guy Lagomarsino | special |
| 05/07/2026 | Final | 24 EAST 129 STREET | Guy Lagomarsino | progress |
| 04/15/2026 | Final | 525 EAST 12 STREET | Guy Lagomarsino | progress |
| 04/15/2026 | Tenant Protection Plan Compliance | 525 EAST 12 STREET | — | special |
| 04/15/2026 | Concrete - Cast-In-Place | 525 EAST 12 STREET | Guy Lagomarsino | special |
| 04/15/2026 | Structural Stability – Alterations of existing buildings | 525 EAST 12 STREET | Guy Lagomarsino | special |
| 04/15/2026 | Post-installed Anchors | 525 EAST 12 STREET | Guy Lagomarsino | special |
| 04/15/2026 | Structural Steel - Details | 525 EAST 12 STREET | Guy Lagomarsino | special |
| 04/15/2026 | Structural Steel - High Strength Bolting | 525 EAST 12 STREET | Guy Lagomarsino | special |
| 04/15/2026 | Structural Steel - Welding | 525 EAST 12 STREET | Guy Lagomarsino | special |
| 04/15/2026 | Structural Cold-Formed Steel | 525 EAST 12 STREET | Guy Lagomarsino | special |
| 04/15/2026 | Masonry | 525 EAST 12 STREET | Guy Lagomarsino | special |
| 03/25/2026 | Energy Code Compliance Inspections | 365 WEST 118 STREET | Guy Lagomarsino | progress |
| 03/25/2026 | Tenant Protection Plan Compliance | 365 WEST 118 STREET | Guy Lagomarsino | special |
| 03/25/2026 | Fire-Resistant Penetrations and Joints | 365 WEST 118 STREET | Guy Lagomarsino | special |
| 03/24/2026 | Tenant Protection Plan Compliance | 135 EASTERN PARKWAY | Guy Lagomarsino | special |
| 03/24/2026 | Tenant Protection Plan Compliance | 135 EASTERN PARKWAY | Guy Lagomarsino | special |
| 03/24/2026 | Post-installed Anchors | 135 EASTERN PARKWAY | Guy Lagomarsino | special |
| 03/24/2026 | Post-installed Anchors | 135 EASTERN PARKWAY | Guy Lagomarsino | special |
| 03/23/2026 | Fire-Resistant Penetrations and Joints | 365 WEST 118 STREET | Guy Lagomarsino | special |
| 03/23/2026 | Tenant Protection Plan Compliance | 365 WEST 118 STREET | Guy Lagomarsino | special |
| 03/23/2026 | Energy Code Compliance Inspections | 365 WEST 118 STREET | Guy Lagomarsino | progress |
| 03/18/2026 | Tenant Protection Plan Compliance | 2611 FREDRICK DOUGLASS BL | Guy Lagomarsino | special |
| 03/17/2026 | Tenant Protection Plan Compliance | 135 EASTERN PARKWAY | — | special |
| 03/17/2026 | Concrete - Cast-In-Place | 135 EASTERN PARKWAY | Guy Lagomarsino | special |
| 03/09/2026 | Tenant Protection Plan Compliance | 400 MANHATTAN AVENUE | Guy Lagomarsino | special |
| 02/19/2026 | Final | 1700 CROTONA PARK EAST | Guy Lagomarsino | progress |
| 02/19/2026 | Fire-Resistant Penetrations and Joints | 1700 CROTONA PARK EAST | Guy Lagomarsino | special |
| 02/19/2026 | Tenant Protection Plan Compliance | 1700 CROTONA PARK EAST | Guy Lagomarsino | special |