← Back
Elevator apt, fireproof without stores
Pink (NYCHA)
2628 LINDEN BOULEVARD · BIN 3324205
💬 Discuss this project
1963Year Built
8Stories
D3Building Class
R4Zoning
315,200 sfGross Floor Area
380Units
LL97 Covered6 Open Violations 2 unresolved · 4 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 212,850 sf lot · 1.48 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Cellar6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2207/08/2026
SECURITY MANAGEMENT203/21/2026
NAVTECH CONSTRUCTION303/21/2026
NYC HOUSING AUTHORITY103/21/2026
NYCHA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YU & ASSOCIATES307/08/2025
GENESYS ENGINEERING312/09/2022
WILLDAN108/11/2022
AHUJA PARTNERSHIP ARCHITECTS108/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKS INTERNATIONAL INCGeneral Contractor1507/08/2026
DUDLEY JAMALElectrical203/21/2026
JAMAL DUDLEYElectrical203/21/2026
EASTERN PLBG & MECH CONTRPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983607/08/2025
Building Lifecycle
All (99)Filed (8)Permit Issued (9)Signed Off (4)Facade (FISP) (12)Violation (13)Inspection (3)Objection (20)Special Inspection (30)
11/19/2025
Signed off — Alteration
mechanical system modification steam for installation hot water system for NYCHA pink building #8 as per plans filed herewith. no change to use, egress or occupancy
B00732013-I1
11/18/2025
Signed off — Alteration
Plumbing application to install hot water system for NYCHA pink building #8 as per plans filed herewith. no change to use, egress or occupancy
B00733023-I1
09/16/2025
Signed off — Alteration
REMOVAL OF EXISTING FEATURES, AS NECESSARY, FOR THE INSTALLATIONOF NEW UNDERGROUND MECHANICAL GLYCOL PIPING ASSOCIATED WITH THE CONSTRUCTION OF A NEW HEAT PUMP BUILDING.
B00869128-I1
08/14/2025
Signed off — Alteration
GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B00733248-I1
07/26/2025
Violation issued (FDNY_NOV, closed)
07/18/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
07/18/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ALEXIS SCHLESSINGERMAN
07/18/2025
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
07/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/18/2025
Special inspection requirement — Subgrade Inspections
ALEXIS SCHLESSINGERMAN
07/08/2025
Filed — Alteration
REMOVAL OF EXISTING FEATURES, AS NECESSARY, FOR THE INSTALLATIONOF NEW UNDERGROUND MECHANICAL GLYCOL PIPING ASSOCIATED WITH THE CONSTRUCTION OF A NEW HEAT PUMP BUILDING.
B00869128-P1
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/25/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ALEXIS SCHLESSINGERMAN
06/25/2025
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
06/25/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
06/25/2025
Special inspection requirement — Subgrade Inspections
ALEXIS SCHLESSINGERMAN
02/26/2025
Violation issued (FDNY_NOV, closed)
09/11/2024
Permit issued — Mechanical Systems
B00732013-I1-MS
09/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
08/01/2024
Permit issued — General Construction
B00869128-I1-GC-CX
02/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/26/2023
Permit issued — General Construction
B00733248-I1-GC
11/15/2023
Permit issued — Plumbing
B00733023-I1-PL
09/19/2023
Permit issued — Mechanical Systems
B00732013-I1-MS
08/21/2023
Objection resolved — Addressed
08/21/2023
Objection resolved — Addressed
08/09/2023
Permit issued — Earth Work
B00869128-I1-GC-CX
07/11/2023
Objection resolved — Addressed
07/11/2023
Objection resolved — Addressed
07/11/2023
Objection resolved — Addressed
07/11/2023
Objection resolved — Addressed
07/11/2023
Objection resolved — Addressed
07/11/2023
Objection resolved — Addressed
07/11/2023
Objection resolved — Addressed
06/15/2023
Objection raised — Structural
06/15/2023
Objection raised — Other
06/15/2023
Objection raised — Structural
06/15/2023
Objection raised — Admin
06/15/2023
Objection raised — Structural
06/15/2023
Objection raised — Structural
06/15/2023
Objection raised — Structural
06/15/2023
Objection raised — Structural
06/15/2023
Objection raised — Structural
06/12/2023
Filed — Alteration
FILING FOR SUPPORT OF EXCAVATION
B00873618-I1
05/16/2023
Filed — Alteration
REMOVAL OF EXISTING FEATURES, AS NECESSARY, FOR THE INSTALLATIONOF NEW UNDERGROUND MECHANICAL GLYCOL PIPING ASSOCIATED WITH THE CONSTRUCTION OF A NEW HEAT PUMP BUILDING.
B00869128-I1
05/15/2023
Special inspection requirement — Deep Foundation Elements
ALEXIS SCHLESSINGERMAN
05/15/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ALEXIS SCHLESSINGERMAN
05/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/15/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ALEXIS SCHLESSINGERMAN
05/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/15/2023
Special inspection requirement — Subgrade Inspections
ALEXIS SCHLESSINGERMAN
05/15/2023
Special inspection requirement — Underpinning
ALEXIS SCHLESSINGERMAN
12/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/19/2022
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
12/19/2022
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
12/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/15/2022
Permit issued — General Construction
B00733248-I1-GC
12/13/2022
Permit issued — Plumbing
B00733023-I1-PL
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAKS INTERNATIONAL INC09/11/2024
DOB NOWGeneral ConstructionSigned-offAKS INTERNATIONAL INC08/01/2024
DOB NOWGeneral ConstructionSigned-offAKS INTERNATIONAL INC12/26/2023
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR11/15/2023
DOB NOWMechanical SystemsSigned-offAKS INTERNATIONAL INC09/19/2023
DOB NOWEarth WorkSigned-offAKS INTERNATIONAL INC08/09/2023
DOB NOWGeneral ConstructionSigned-offAKS INTERNATIONAL INC12/15/2022
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR12/13/2022
DOB NOWMechanical SystemsSigned-offAKS INTERNATIONAL INC09/24/2022
BISOTISSUEDACCORD POWER INC08/30/2023
BISOTISSUEDACCORD POWER INC07/28/2023
BISEQISSUEDAPS CONTRACTORS INC09/16/2016
BISEQISSUEDAPS CONTRACTORS INC09/13/2016
BISEQISSUEDAPS CONTRACTORS INC09/13/2016
BISOTISSUEDAPS CONTRACTORS INC03/25/2016
BISOTISSUEDAPS CONTRACTORS INC12/14/2015
BISEQISSUEDAPS CONTRACTORS INC10/01/2015
BISEQISSUEDAPS CONTRACTORS INC10/01/2015
BISEQISSUEDAPS CONTRACTORS INC10/01/2015
BISEQISSUEDNAVTECH CONST CORP02/12/2007
BISPLISSUEDGRISEL PLUMBING & HEATING CORP.09/01/1999
BISOTISSUEDGRISEL PLUMBING & HEATING CORP.09/01/1999
BISPLISSUEDD&SPLG&HTGCORP/ZAFFUTOCONSTCOINC06/01/1995
BISOTISSUEDD&S PLG&HTGCORP/ZAFFUTO CONSTCOI06/01/1995
5 projects · most recent 01/05/2024
General Wiring
FiledStatusContractorScope
01/05/2024CompleteARK SYSTEMS ELEC. CORPGeneral Wiring
07/17/2023CompletePOWER SURGE ELECTRIC, INC2 meters, 1 new_meters
09/12/2022Permit IssuedARK SYSTEMS ELEC. CORP—
10/27/2021CompleteCSI SEC & ELECTRIC INC—
05/19/2020CompleteI.S.M. ELECTRIC, INC.General Wiring
1 project · most recent 06/12/2023
FiledStatusContractorScope
06/12/2023——2 scope_items
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/03/2024Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
02/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/18/2025FinalALEXIS SCHLESSINGERMANprogress
07/18/2025Subsurface Conditions – Fill Placement & In-Place DensityALEXIS SCHLESSINGERMANspecial
07/18/2025Mechanical SystemsALEXIS SCHLESSINGERMANspecial
07/18/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/18/2025Subgrade InspectionsALEXIS SCHLESSINGERMANspecial
06/26/2025Tenant Protection Plan Compliance—special
06/25/2025Subsurface Conditions – Fill Placement & In-Place DensityALEXIS SCHLESSINGERMANspecial
06/25/2025Mechanical SystemsALEXIS SCHLESSINGERMANspecial
06/25/2025FinalALEXIS SCHLESSINGERMANprogress
06/25/2025Subgrade InspectionsALEXIS SCHLESSINGERMANspecial
05/15/2023Deep Foundation ElementsALEXIS SCHLESSINGERMANspecial
05/15/2023Subsurface Conditions – Fill Placement & In-Place DensityALEXIS SCHLESSINGERMANspecial
05/15/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/15/2023Excavations - Sheeting, Shoring, and BracingALEXIS SCHLESSINGERMANspecial
05/15/2023Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
05/15/2023Subgrade InspectionsALEXIS SCHLESSINGERMANspecial
05/15/2023UnderpinningALEXIS SCHLESSINGERMANspecial
12/19/2022HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/19/2022Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
12/19/2022Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
12/19/2022HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/19/2022HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
10/31/2022Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
10/31/2022HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
10/31/2022HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 39.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/28/2026B00733023-I1Request digital key ↗
08/28/2026B00733023-P1Request digital key ↗
08/28/2026B00732013-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION9
07/28/2023340886205Open ↗
09/16/2016340292114Open ↗
09/14/2016340292105Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
06/13/2023340886205Open ↗
05/23/2023340886205Open ↗
12/14/2015340131011Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
05/01/2017340131011Open ↗
05/01/2017340131011Open ↗
05/01/2017340131011Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/29/2026B00733023-P1Open ↗
08/29/2026B00733023-P1Open ↗
08/27/2026B00869128-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026B00733023-I1Open ↗
08/28/2026B00732013-I1Open ↗
08/28/2026B00732013-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
05/23/2023340886205Open ↗
09/30/2015340292123Open ↗
09/30/2015340292105Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026B00869128-I1Open ↗
08/27/2026B00869128-I1Open ↗
08/26/2026B00869128-P1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/30/2015340292123Open ↗
09/30/2015340292105Open ↗
09/30/2015340292114Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/30/2015340292123Open ↗
09/30/2015340292105Open ↗
09/30/2015340292114Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN 2008 CODE1
04/16/2014340131011Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
07/28/2023340886205Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B00733023-I1Open ↗
08/28/2026B00732013-P1Open ↗
08/28/2026B00732013-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/23/2023340886205Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/16/2014340131011Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/23/2023340886205Open ↗
04/16/2014340131011Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/23/2023340886205Open ↗
04/16/2014340131011Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00732013-I1Open ↗
08/13/2026B00733023-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00732013-I1Open ↗
08/13/2026B00733023-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/01/2016340131011Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/30/2015340292114Open ↗
▸BISNYCECC ANALYSIS1
04/16/2014340131011Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/23/2023340886205Open ↗
05/15/2015340131011Open ↗
04/16/2014340131011Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/28/2026B00733023-I1Open ↗
08/27/2026B00869128-I1Open ↗
08/13/2026B00873618-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/19/2017340292114Open ↗
01/19/2017340292114Open ↗
11/16/2016340292123Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/27/2026B00869128-I1Open ↗
08/13/2026B00873618-I1Open ↗
08/13/2026B00869128-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/14/2015340131011Open ↗
09/30/2015340292123Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00869128-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/23/2023340886205Open ↗
05/01/2017340131011Open ↗
04/16/2014340131011Open ↗
▸Filing & Intake Forms9
▸BISEFILING JOB APPLICATION COVER SHEET5
05/23/2023340886205Open ↗
09/30/2015340292123Open ↗
09/30/2015340292105Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
07/27/2023340886205Open ↗
07/10/2023340886205Open ↗
05/23/2023340886205Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
01/19/2017340292114Open ↗
11/16/2016340292123Open ↗
11/14/2016340292105Open ↗
Showing 3 of 4 on file for this type