← Back
Three families
263 MADISON STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3051421
💬 Discuss this project
1881Year Built
3Stories
C0Building Class
R6BZoning
3,360 sfGross Floor Area
3Units
Rent Stabilized24 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
Architecture
Floor 32p · 2 filings · 20 docs
Floor 2
Floor 1
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC BUILDING SOLUTIONS CO503/22/2026
MADISON WARD REALTY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/08/2024$3.1M—263 MADISON IMA LLC → Private party$938/sf building
04/26/2021$1.3M—263 MADISON STREET, LLC → 263 MADISON IMA LLC$396/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOYUN KIM; RA705/07/2024
CONAPAC SERVICES, DBA103/01/2022
CHUN ENGINEERING CONSULTANT PLLC102/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS703/21/2026
GLENN JOSEY ARCHITECTURE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor807/08/2026
VILLAGE P & H NY INCPlumbing707/08/2026
DOYUN KIMElectrical103/21/2026
VILLAGE P H NYGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415705/07/2024
Building Lifecycle
All (97)Filed (9)Permit Issued (6)Signed Off (4)Violation (36)Inspection (4)Objection (8)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
02/18/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2024
Violation issued (HPD, open)
I
09/24/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2024
Objection resolved — Addressed
05/14/2024
Objection raised — Scope
05/07/2024
Filed — Alteration CO
HEREWITH TO PROPOSE NEW GYP BOARD, UPDATE WINDOWS, NEW REAR DECK, UPDATE FINISHES AS PER PLANS. EXISTING 4 STORY DWELLING PROPOSED 2 FAMILY. NO CHANGE IN BULK
B00551787-P3
05/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
05/01/2024
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
05/01/2024
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
05/01/2024
Special inspection requirement — Mechanical Systems
DOYUN KIM
05/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
05/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
05/01/2024
Special inspection requirement — Structural Steel - Details
DOYUN KIM
05/01/2024
Special inspection requirement — Structural Steel - High Strength Bolting
DOYUN KIM
05/01/2024
Special inspection requirement — Structural Steel - Welding
DOYUN KIM
05/01/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/01/2024
Special inspection requirement — Structural Cold-Formed Steel
DOYUN KIM
05/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
05/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
05/01/2024
Special inspection requirement — Final
DOYUN KIM
05/01/2024
Special inspection requirement — Insulation placement and R values
DOYUN KIM
05/01/2024
Special inspection requirement — Fenestration air leakage
DOYUN KIM
05/01/2024
Special inspection requirement — Shutoff dampers
DOYUN KIM
05/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
05/01/2024
Special inspection requirement — Interior lighting power
DOYUN KIM
05/01/2024
Special inspection requirement — Lighting controls
DOYUN KIM
05/01/2024
Special inspection requirement — Fenestration areas
DOYUN KIM
04/10/2024
Violation issued (HPD, open)
A
03/25/2024
Objection resolved — Addressed
03/22/2024
Objection raised — Zoning
03/20/2024
Objection raised — Zoning
03/20/2024
Objection resolved — Addressed
03/20/2024
Objection raised — Zoning
03/20/2024
Objection resolved — Addressed
03/19/2024
Filed — Alteration CO
HEREWITH TO PROPOSE NEW GYP BOARD, UPDATE WINDOWS, NEW REAR DECK, UPDATE FINISHES AS PER PLANS. EXISTING 4 STORY DWELLING PROPOSED 2 FAMILY. NO CHANGE IN BULK
B00551787-P2
02/22/2024
Signed off — Alteration
INSALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
B00684270-I1
12/11/2023
Special inspection requirement — Structural Steel - High Strength Bolting
DOYUN KIM
12/11/2023
Special inspection requirement — Structural Steel - Details
DOYUN KIM
12/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
12/11/2023
Special inspection requirement — Structural Cold-Formed Steel
DOYUN KIM
12/11/2023
Special inspection requirement — Mechanical Systems
DOYUN KIM
12/11/2023
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
12/11/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
12/11/2023
Special inspection requirement — Structural Steel - Welding
DOYUN KIM
12/11/2023
Special inspection requirement — Final
DOYUN KIM
11/20/2023
Violation issued (HPD, open)
I
11/16/2023
Signed off — Alteration
B00535606-I1
11/16/2023
Signed off — Alteration
B00554679-I1
11/15/2023
Signed off — Alteration
B00516988-I1
05/04/2023
Permit issued — Plumbing
B00554679-I1-PL
05/04/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/23/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, open)
I
08/16/2022
Filed — Alteration CO
HEREWITH TO PROPOSE NEW GYP BOARD, UPDATE WINDOWS, NEW REAR DECK, UPDATE FINISHES AS PER PLANS. EXISTING 4 STORY DWELLING PROPOSED 2 FAMILY. NO CHANGE IN BULK
B00551787-P1
07/21/2022
Violation issued (ECB, closed)
Construction
07/21/2022
Violation issued (ECB, closed)
Construction
07/21/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC05/04/2023
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO04/12/2022
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC03/02/2022
DOB NOWSupported ScaffoldSigned-offNYC BUILDING SOLUTIONS CO03/01/2022
DOB NOWStructuralSigned-offNYC BUILDING SOLUTIONS CO07/21/2021
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO05/10/2021
1 project · most recent 05/07/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2024——Air Conditioning Systems, Heating Systems
Cooling
Gmc VSX140241 60,000 BTU · Condensing Unit ×14
Mitsubishi Electric MXZ-3C24NA2 23,600 BTU · Condensing Unit ×14
Heating
Mitsubishi Electric MSZ-GL15NA-U1 18,000 BTU · Pump ×21
Goodman ARUF29B14 2 tons · Fan Coil Indoor ×14
1 project · most recent 03/24/2022
General Wiring
FiledStatusContractorScope
03/24/2022CompleteRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 05/07/2024
Steel Wood
FiledStatusContractorScope
05/07/2024——Steel, Wood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/04/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
05/01/2024Fenestration areasDOYUN KIMenergy_progress
05/01/2024HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
05/01/2024Lighting in dwelling unitsDOYUN KIMenergy_progress
05/01/2024Concrete - Cast-In-PlaceDOYUN KIMspecial
05/01/2024Mechanical SystemsDOYUN KIMspecial
05/01/2024Structural Cold-Formed SteelDOYUN KIMspecial
05/01/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
05/01/2024Structural Steel - DetailsDOYUN KIMspecial
05/01/2024Structural Steel - High Strength BoltingDOYUN KIMspecial
05/01/2024Structural Steel - WeldingDOYUN KIMspecial
05/01/2024Energy Code Compliance InspectionsDOYUN KIMprogress
05/01/2024FinalDOYUN KIMprogress
05/01/2024Fire-Resistance Rated ConstructionDOYUN KIMprogress
05/01/2024Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
05/01/2024HVAC-R and service water heating equipmentDOYUN KIMenergy_progress
05/01/2024Insulation placement and R valuesDOYUN KIMenergy_progress
05/01/2024Fenestration air leakageDOYUN KIMenergy_progress
05/01/2024Shutoff dampersDOYUN KIMenergy_progress
05/01/2024HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
05/01/2024Interior lighting powerDOYUN KIMenergy_progress
05/01/2024Lighting controlsDOYUN KIMenergy_progress
12/11/2023Interior lighting powerDOYUN KIMenergy_progress
12/11/2023Concrete - Cast-In-PlaceDOYUN KIMspecial
12/11/2023Mechanical SystemsDOYUN KIMspecial
12/11/2023Structural Cold-Formed SteelDOYUN KIMspecial
Latest 25 of 66.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00516988-I1Request digital key ↗
09/01/2026B00535606-I1Request digital key ↗
09/01/2026B00551787-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
09/01/2026B00551787-I1Open ↗
08/13/2026B00551787-P1Open ↗
08/13/2026B00551787-P3Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
09/01/2026B00551787-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00516988-I1Open ↗
09/01/2026B00535606-I1Open ↗
09/01/2026B00551787-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B00551787-P3Open ↗
08/28/2026B00551787-P3Open ↗
08/27/2026B00551787-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B00551787-P3Open ↗
08/27/2026B00551787-P1Open ↗
08/26/2026B00551787-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
09/01/2026B00551787-P1Open ↗
09/01/2026B00551787-P2Open ↗
09/01/2026B00551787-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
09/01/2026B00551787-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
09/01/2026B00551787-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
09/01/2026B00551787-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00535606-I1Open ↗
09/01/2026B00551787-I1Open ↗
09/01/2026B00551787-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00551787-I1Open ↗
08/13/2026B00554679-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
09/01/2026B00551787-I1Open ↗