| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01307822 ↗ | 56 CROSBY STREET MANHATTAN | Alteration | Permit Issued | 11/14/2025 | 03/05/2026 | Design Downtown Engineers Owner Synoptic Management Corp Contractor RAF GENERAL CONTRACTING C | INTERIOR ALTERATIONS INCLUDE NEW PARTITIONS, DOORS, FLOORING, LIGHT FIXTURES, PLUMBING FIXTURES AND FINISHES. NO CHANGE IN USE, EGRESS OR O… |
| Q00877503 ↗ | 34-01 38 AVENUE QUEENS | Alteration | Signed-off | 06/21/2023 | 03/26/2025 | Design RAS PE CONSULTING ENGINEERS Contractor WILTON CONSTRUCTION MNGRS | Filling existing loading dock with soil and pouring a structural concrete slab at ground floor level. Removing non bearing partition walls a… |
| B00551787 ↗ | 263 MADISON STREET BROOKLYN | Alteration CO | Filed — no permit on record | 10/05/2021 | — | Design DOYUN KIM; RA | — |
| Person | Filings | Most recent |
|---|---|---|
| Glenn Josey | 4 | 11/03/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| DOYUN KIM; RA | 1 | 05/07/2024 |
| Downtown Engineers | 1 | 04/01/2026 |
| RAS PE CONSULTING ENGINEERS | 1 | 06/21/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| AQUEDUCT MECHANICAL CORP | 1 | 04/01/2026 |
| RAF GENERAL CONTRACTING C | 1 | 04/01/2026 |
| WILTON CONSTRUCTION MNGRS | 1 | 06/21/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Synoptic Management Corp | 1 | 04/01/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 1 | 04/01/2026 |
| NYC BUILDING SOLUTIONS | 1 | 05/07/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01307822 ↗ | 56 CROSBY STREET MANHATTAN | Alteration | Permit Issued | 11/14/2025 | 03/05/2026 | Design Downtown Engineers Owner Synoptic Management Corp Contractor RAF GENERAL CONTRACTING C | INTERIOR ALTERATIONS INCLUDE NEW PARTITIONS, DOORS, FLOORING, LIGHT FIXTURES, PLUMBING FIXTURES AND FINISHES. NO CHANGE IN USE, EGRESS OR O… |
| Q00877503 ↗ | 34-01 38 AVENUE QUEENS | Alteration | Signed-off | 06/21/2023 | 03/26/2025 | Design RAS PE CONSULTING ENGINEERS Contractor WILTON CONSTRUCTION MNGRS | Filling existing loading dock with soil and pouring a structural concrete slab at ground floor level. Removing non bearing partition walls a… |
| B00551787 ↗ | 263 MADISON STREET BROOKLYN | Alteration CO | Filed — no permit on record | 10/05/2021 | — | Design DOYUN KIM; RA | — |
| Building | Filings | Most Recent |
|---|---|---|
| 56 CROSBY STREET ↗ | 1 | 11/03/2025 |
| 34-01 38 AVENUE ↗ | 2 | 05/18/2023 |
| 263 MADISON STREET ↗ | 1 | 07/02/2021 |