2018Year Built
6Stories
O5Building Class
C6-4MZoning
35,111 sfGross Floor Area
0Units
LL97 Covered12 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: 263 W 34TH STREET LENDER, LLC · 7,858 sf lot · 4.47 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionLandscapeGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 10 docs
Floor 67p · 2 filings · 9 docs
Floor 519p · 6 filings · 20 docs
Floor 4Under Construction21p · 6 filings · 20 docs
Floor 3
Floor 2
Floor 1
Cellar11p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARATHON ASSET MANAGEMENT1807/08/2026
OWNERS REP607/08/2026
CHURCHILL E 62ND907/08/2026
263 W 34TH STREET LENDER, LLC103/22/2026
257-263 W 34TH STREET1903/22/2026
NY DEVELOPERS & MANAGEMEN403/22/2026
BLUE ROCA CONSTRUCTION IN203/22/2026
BLUE ROCK CONTRACTING103/22/2026
PURPLE FASHIONS INC BUSIN103/22/2026
OAC JEWELRY CO103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/19/2023$16.8M—— → —$480/sf building
12/17/2015$31.7M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IMA ENGINEERING803/21/2026
JANCO BUILDING CONSULTANTS803/21/2026
JAM CONSULTANTS, INC.1003/21/2026
A1 EXPEDITING SERVICE CORP.703/21/2026
ARCHETYPE CONSULTANTS803/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RENAISSANCE 1 CORPGeneral Contractor707/08/2026
NY DEVELOPERS & MANAGEMENTGeneral Contractor707/08/2026
SWINERTON BUILDERSGeneral Contractor603/21/2026
J.CALNAN & ASSOCIATES,INCGeneral Contractor607/08/2026
SKYE NYC INCGeneral Contractor603/21/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor307/08/2026
HI-LIGHTS ELECTRIC LLCElectrical203/22/2026
ACCORD CONTR AND MGMT CORGeneral Contractor207/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
R.J.C. MECHANICAL CORPPlumbing107/08/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
FULL CAPACITY FIRE CORPFire Protection106/28/2026
MJH ENERGY CONSULTING INCFire Protection107/08/2026
PSI PARTNERS, LLCFire Protection107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
BLUEWATER PLBG& HTG INCPlumbing107/08/2026
LUVER PLBG & HTG INCPlumbing107/08/2026
ENNELL GRP ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422203/27/2025
MEP INSPECTIONS, INC1102201/21/2025
CATALPA SPECIAL INSPECTIO2004208/20/2024
GEA CONSULTING ENGINEERS945207/20/2021
AA BUILDING & INSPECTION1519103/19/2021
BIG APPLE GROUP NY A RMA9168503/16/2021
Building Lifecycle
All (180)Filed (27)Permit Issued (32)Signed Off (12)Violation (60)Inspection (19)Special Inspection (30)
03/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/29/2026
Inspection — Fail-Final PL Permit Withdrawal
Fail
View inspection ↗
10/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/18/2025
Permit issued — Sprinklers
M00256486-I1-EW-SP
08/08/2025
Permit issued — Plumbing
M00256452-I1-PL
08/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/23/2025
Permit issued — Sprinklers
M01194132-I1-EW-SP
05/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2025
Permit issued — Plumbing
M01194110-I1-PL
04/18/2025
Permit issued — General Construction
M01172434-I1-GC
04/17/2025
Permit issued — Mechanical Systems
M01194959-I1-MS
03/27/2025
Filed — Alteration
M01194959-I1
03/19/2025
Filed — Alteration
PROPOSE TO INSTALL NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH.
M01194110-I1
03/18/2025
Filed — Alteration
M01194132-I1
03/06/2025
Filed — Alteration
PROPOSED BUILDOUT OF THE 4TH FLOOR AND LOBBY AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
M01172434-I1
02/03/2025
Signed off — Alteration
HP- Modifications to existing sprinkler system in conjunction with office renovations.
M01093329-I1
01/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Tony Cartagine
01/27/2025
Special inspection requirement — Final
Tony Cartagine
01/27/2025
Special inspection requirement — Interior lighting power
LAWRENCE GREEN
01/27/2025
Special inspection requirement — Lighting controls
LAWRENCE GREEN
01/22/2025
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
01/21/2025
Filed — Alteration
HP- Modifications to existing sprinkler system in conjunction with office renovations.
M01093329-P1
01/21/2025
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
01/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/17/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/02/2024
Signed off — Alteration
HP-- Mechanical modifications inclusive of new HVAC installations as per plans filed herewith.
M01093314-I1
12/02/2024
Signed off — Alteration
M01090510-I1
11/27/2024
Signed off — Alteration
HP-- Mechanical modifications inclusive of new HVAC installations as per plans filed herewith.
M01093314-S1
11/13/2024
Permit issued — Sprinklers
M01093329-I1-EW-SP
08/23/2024
Permit issued — General Construction
M01093314-I1-GC
08/23/2024
Permit issued — Mechanical Systems
M01093314-S1-MS
08/20/2024
Filed — Alteration
HP-- Mechanical modifications inclusive of new HVAC installations as per plans filed herewith.
M01093314-I1
08/20/2024
Filed — Alteration
HP-- Mechanical modifications inclusive of new HVAC installations as per plans filed herewith.
M01093314-S1
08/19/2024
Filed — Alteration
HP- Modifications to existing sprinkler system in conjunction with office renovations.
M01093329-I1
08/19/2024
Permit issued — General Construction
M01090510-I1-GC
08/19/2024
Special inspection requirement — Interior lighting power
ERIC BERLENT
08/19/2024
Special inspection requirement — Lighting controls
ERIC BERLENT
08/14/2024
Filed — Alteration
M01090510-I1
08/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIC BERLENT
08/08/2024
Special inspection requirement — Mechanical Systems
ERIC BERLENT
08/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
08/08/2024
Special inspection requirement — Final
ERIC BERLENT
08/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
08/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
08/08/2024
Special inspection requirement — Heating Systems
ERIC BERLENT
08/08/2024
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
08/08/2024
Special inspection requirement — Final
ERIC BERLENT
08/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIC BERLENT
08/08/2024
Special inspection requirement — Maintenance information
ERIC BERLENT
08/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIC BERLENT
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/08/2022
Signed off — Alteration
Architectural changes on the 5th and 6th floors as indicated on drawings.
M00537436-I1
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedDEPENDABLE MECHANICAL COR08/18/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP08/08/2025
DOB NOWSprinklersPermit IssuedFULL CAPACITY FIRE CORP06/23/2025
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP05/09/2025
DOB NOWGeneral ConstructionPermit IssuedACCORD CONTR MGMT COR04/18/2025
DOB NOWMechanical SystemsPermit IssuedACCORD CONTR MGMT COR04/17/2025
DOB NOWSprinklersSigned-offMJH ENERGY CONSULTING INC11/13/2024
DOB NOWGeneral ConstructionSigned-offSWINERTON BUILDERS08/23/2024
DOB NOWMechanical SystemsSigned-offSWINERTON BUILDERS08/23/2024
DOB NOWGeneral ConstructionSigned-offSWINERTON BUILDERS08/19/2024
DOB NOWMechanical SystemsSigned-offLORICH CONSTR MGMT LLC10/06/2021
DOB NOWGeneral ConstructionSigned-offLORICH CONSTR MGMT LLC10/05/2021
DOB NOWPlumbingSigned-offBLUEWATER PLBG& HTG INC08/18/2021
DOB NOWGeneral ConstructionSigned-offLORICH CONSTR MGMT LLC08/03/2021
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC07/22/2021
DOB NOWMechanical SystemsSigned-offLORICH CONSTR MGMT LLC07/21/2021
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/27/2021
DOB NOWGeneral ConstructionPermit IssuedRENAISSANCE 1 CORP05/11/2021
DOB NOWGeneral ConstructionPermit IssuedRENAISSANCE 1 CORP04/26/2021
DOB NOWPlumbingSigned-offLUVER PLBG & HTG INC03/22/2021
DOB NOWGeneral ConstructionPermit IssuedRENAISSANCE 1 CORP02/11/2021
DOB NOWMechanical SystemsSigned-offSKYE NYC INC01/31/2021
DOB NOWSprinklersSigned-offA M B MECHANICAL INC01/31/2020
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/24/2020
DOB NOWMechanical SystemsSigned-offSKYE NYC INC01/16/2020
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/16/2019
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN12/10/2019
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/17/2019
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC11/07/2018
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/23/2018
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN07/05/2018
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN11/10/2017
BISPLISSUEDBEST MECHANICAL SVCS INC12/04/2019
BISOTISSUEDSKYE NYC INC12/03/2019
BISEQISSUEDNY DEVELOPERS & MANAGEMENT06/18/2019
BISEQISSUEDNY DEVELOPERS & MANAGEMENT06/11/2019
BISOTISSUEDNY DEVELOPERS & MANAGEMENT06/07/2019
BISPLISSUEDBEST MECHANICAL SVCS INC12/10/2018
BISOTISSUEDNY DEVELOPERS & MANAGEMENT11/13/2018
BISOTISSUEDNY DEVELOPERS & MANAGEMENT09/20/2018
+ 34 more permits on file
2 projects · most recent 08/10/2021
Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/10/2021——Air Conditioning Systems
Cooling
Mitsubishi Electric PUMY-P60NKMU2 66,000 BTU · Vrf Outdoor ×2
PUZ-A36NHA6 37,000 BTU · Heat Pump Outdoor ×2
PUZ-A42NHA7 45,000 BTU · Heat Pump Outdoor ×2
03/16/2021Signed-offSKYE NYC INCAir Conditioning Systems, Heating Systems, Refrigeration Systems, Ventilation Systems
Cooling
Johnson Controls (Y.H)IDH048B22S 48,000 BTU · Vrf Outdoor ×2
(Y.H)ID048B22S 48,000 BTU · Vrf Outdoor ×1
(Y.H)IDH030B22S 30,000 BTU · Vrf Outdoor ×1
(Y,H)IDH048B22S 48,000 BTU · Vrf Outdoor ×3
(Y,H)IDH030B22S 30,000 BTU · Vrf Outdoor ×1
Heating
Neptronic DF CI00H 500 CFM · Electric Heater ×1
DF C100H 500 CFM · Electric Heater ×1
Ventilation
Greenheck CSP-A700-VG 500 CFM · Exhaust Fan ×2
Westinghouse SN100 100 CFM · Exhaust Fan ×2
Refrigeration
Johnson Controls HVAHR144B32S 14 tons · Vrf Outdoor ×1
2 projects · most recent 03/19/2021
FiledStatusContractorScope
03/19/2021———
01/14/2020Permit IssuedA&H EXPRESS PLBG&HTG CORP20 heads
3 projects · most recent 03/19/2025
Water/Sanitary
FiledStatusContractorScope
03/19/2025Signed-offR.J.C. MECHANICAL CORPWater/Sanitary
03/08/2021Signed-offLUVER PLBG & HTG INCWater/Sanitary
01/14/2020Signed-offDEPENDABLE MECH CORPWater/Sanitary
11 projects · most recent 09/19/2023
General Wiring
FiledStatusContractorScope
09/19/2023CompleteENNELL GRP ELECTRIC CORPGeneral Wiring
08/05/2021CompleteDUNRITE ELECTRICAL CORP11 meters, 1 new_meters
02/15/2021Permit IssuedCMY ELECTRICAL CORPGeneral Wiring
01/20/2021CompleteV. VASS ELECTRIC CORP—
07/24/2020CompleteACTION LIGHT & POWER, INC—
07/02/2020CompleteHI-LIGHTS ELECTRIC LLCGeneral Wiring
12/14/2019CompleteLIGHTFORCE ELECL CONTNG IGeneral Wiring
06/25/2019CancelledHI-LIGHTS ELECTRIC LLCGeneral Wiring
03/26/2019CompleteFRIED ELECTRIC CO.—
12/23/2018CompleteHI-LIGHTS ELECTRIC LLC—
06/19/2018CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
03/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2026Fail-Final PL Permit WithdrawalFailView ↗
10/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/24/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/23/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/29/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/15/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
01/29/2025Fire-Resistance Rated ConstructionTony Cartagineprogress
01/27/2025FinalTony Cartagineprogress
01/27/2025Interior lighting powerLAWRENCE GREENenergy_progress
01/27/2025Lighting controlsLAWRENCE GREENenergy_progress
01/22/2025Sprinkler SystemsNicolas Crosettospecial
01/21/2025Sprinkler SystemsNicolas Crosettospecial
08/19/2024Interior lighting powerERIC BERLENTenergy_progress
08/19/2024Lighting controlsERIC BERLENTenergy_progress
08/09/2024HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
08/08/2024Mechanical SystemsERIC BERLENTspecial
08/08/2024Fire-Resistance Rated ConstructionERIC BERLENTprogress
08/08/2024FinalERIC BERLENTprogress
08/08/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
08/08/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
08/08/2024Heating SystemsERIC BERLENTspecial
08/08/2024Post-installed AnchorsERIC BERLENTspecial
08/08/2024FinalERIC BERLENTprogress
08/08/2024HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
08/08/2024Maintenance informationERIC BERLENTenergy_progress
08/08/2024HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
06/09/2021FinalJOHN SADLONprogress
06/09/2021Sprinkler SystemsDavid Glickmanspecial
02/05/2021Sprinkler SystemsYounes Abouyaalaspecial
01/26/2021FinalMICHAEL REIDYprogress
01/08/2020HVAC and service water heating system controls Soorjbally Harilallenergy_progress
Latest 25 of 42.
▾Documents — 513 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch15
09/06/2026M00000975-I1Request digital key ↗
09/06/2026M00053823-I1Request digital key ↗
09/03/2026M00537449-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00256486-P1Request digital key ↗
09/04/2026M00466247-I1Request digital key ↗
08/15/2026M00256486-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00256519-I1Request digital key ↗
09/05/2026M00256519-S1Request digital key ↗
09/03/2026M00467952-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00256452-S1Request digital key ↗
09/05/2026M00256452-I1Request digital key ↗
09/04/2026M00464334-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00149888-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00460786-I1Request digital key ↗
▸Applications & Permits100
▸BISPLAN / WORK APPROVAL APPLICATION71
07/06/2023122682294Open ↗
06/26/2023122682294Open ↗
05/14/2021122682294Open ↗
Showing 3 of 71 on file for this type
▸BISWORK PERMIT APPLICATION27
12/04/2019123739062Open ↗
08/14/2019122682294Open ↗
07/18/2019122682294Open ↗
Showing 3 of 27 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/31/2019122682294Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications136
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION51
12/11/2019140816749Open ↗
12/11/2019140816749Open ↗
12/03/2019123739062Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/06/2026M00053823-I1Open ↗
09/05/2026M00256486-P1Open ↗
09/05/2026M00256486-S1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/20/2026M01093314-S1Open ↗
09/20/2026M01093314-S1Open ↗
09/01/2026M00053823-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
11/08/2019123739062Open ↗
06/06/2019140846039Open ↗
Showing 2 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
06/06/2019140846039Open ↗
Showing 1 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
06/06/2019140846039Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/20/2026M01093314-S1Open ↗
09/01/2026M01093329-I1Open ↗
08/31/2026M01093329-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/08/2019123739062Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
03/24/2020122682294Open ↗
02/19/2020122682294Open ↗
08/14/2019122682294Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS6
11/12/2019122682294Open ↗
11/12/2019122682294Open ↗
11/12/2019122682294Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING2
09/04/2020122682294Open ↗
07/18/2020122682294Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/12/2019122682294Open ↗
11/12/2019122682294Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/15/2024122682294Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWATER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRIC CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
02/02/2024122682294Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
02/08/2024122682294Open ↗
▸Safety & Tenant Protection7
▸BISANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
03/04/2024122682294Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
12/03/2019123739062Open ↗
11/08/2019123739062Open ↗
09/06/2019122682294Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/29/2020123739062Open ↗
10/29/2020123739062Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/29/2020123739062Open ↗
09/06/2019122682294Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
09/20/2019122682294Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00537442-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/29/2020123739062Open ↗
10/29/2020123739062Open ↗
06/06/2019140846039Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
06/28/2019122682294Open ↗
06/28/2019122682294Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
11/08/2019140602104Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
11/12/2020122682294Open ↗
10/29/2020123739062Open ↗
08/24/2020122682294Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWTransit Authority Approval15
09/06/2026M00053823-I1Open ↗
09/04/2026M00464334-I1Open ↗
08/13/2026M00256519-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL10
06/06/2019140846039Open ↗
Showing 1 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
10/09/2019122682294Open ↗
08/20/2019122682294Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
05/14/2021122682294Open ↗
Showing 1 of 6 on file for this type
▸BISHOUSE CONNECTION SIGNOFF1
12/09/2020122682294Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT13
10/29/2020123739062Open ↗
10/29/2020123739062Open ↗
01/27/2020123383631Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms81
▸BISBOROUGH INTAKE FORM44
03/24/2020122682294Open ↗
03/13/2020122682294Open ↗
02/19/2020122682294Open ↗
Showing 3 of 44 on file for this type
▸BISADDITIONAL INFORMATION17
09/24/2020122682294Open ↗
09/24/2020122682294Open ↗
02/24/2020122682294Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET11
11/08/2019123739062Open ↗
Showing 1 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
06/06/2019140846039Open ↗
Showing 1 of 8 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents11
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Deferment3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISUnknown1
02/18/2021123383631Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISARA Supporting Document1
01/10/2020122682294Open ↗