← Back
BuildNYC
QUEENS
264-25 76TH AVENUE
QUEENS · BIN 4625190
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active Violations
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLong Island Jewish Medical Center - Zucker Hillside HospitalUnder Construction64p · 1 filing · 20 docs
PenthouseLong Island Jewish Medical Center - Zucker Hillside HospitalUnder Construction27p · 1 filing · 20 docs
Floor 3Long Island Jewish Medical Center - Zucker Hillside HospitalUnder Construction85p · 1 filing · 20 docs
Floor 2Long Island Jewish Medical Center - Zucker Hillside HospitalUnder Construction80p · 1 filing · 20 docs
Floor 1Long Island Jewish Medical Center - Zucker Hillside HospitalUnder Construction80p · 1 filing · 20 docs
CellarLong Island Jewish Medical Center - Zucker Hillside HospitalUnder Construction91p · 1 filing · 20 docs
Site & exteriorLong Island Jewish Medical Center - Zucker Hillside HospitalUnder Construction61p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Northwell Health2707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Langan Engineering306/02/2025
Hansen Engineering404/09/2025
Tarek M. Zeid, PE102/21/2025
AKF Engineers302/17/2025
HDR Architecture & Engineering110/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Upright Expediters2203/21/2026
JMV Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gilbane Building CompanyGeneral Contractor906/28/2026
Maccarone PlumbingPlumbing306/28/2026
Darcon ConstructionScaffold207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Langan Engineering, Env, Surveyin1265506/02/2025
Bureau Veritas Na6902704/09/2025
Building Lifecycle
All (82)Filed (12)Permit Issued (14)Signed Off (3)Violation (4)Inspection (4)Objection (15)Special Inspection (30)
10/01/2026
Signed off — New Building
Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.
Q01080296-S9
08/13/2026
Objection resolved — Addressed
08/11/2026
Signed off — New Building
Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.
Q01080296-Z1
08/03/2026
Signed off — New Building
Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.
Q01080296-S6
06/30/2026
Special inspection requirement — Fenestration areas
06/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/30/2026
Special inspection requirement — Fenestration air leakage
06/30/2026
Special inspection requirement — Insulation placement and R values
06/30/2026
Special inspection requirement — Air barrier - visual inspection
06/24/2026
Permit issued — Plumbing
Q01080296-Z4-PL
06/23/2026
Permit issued — Mechanical Systems
Q01080296-Z3-MS
06/23/2026
Permit issued — Support of Excavation
Q01080296-Z1-SE
06/11/2026
Permit issued — Mechanical Systems
Q01080296-Z3-MS
04/08/2026
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
03/16/2026
Permit issued — Support of Excavation
Q01080296-Z1-SE
03/13/2026
Permit issued — Foundation
Q01080296-S9-FO
03/13/2026
Special inspection requirement — Air barrier — testing
IBRAHIM MOURAD
03/05/2026
Permit issued — Structural
Q01080296-Z2-ST
03/03/2026
Permit issued — Construction Fence
Q01183957-I1-FN
02/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
12/02/2025
Violation issued (ECB, closed)
Construction
12/02/2025
Violation issued (ECB, closed)
Construction
12/01/2025
Violation issued (ECB, closed)
Unknown
12/01/2025
Violation issued (ECB, closed)
Unknown
10/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/07/2025
Objection resolved — Resolved
10/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2025
Permit issued — Plumbing
Q01080296-S6-PL
06/03/2025
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
06/02/2025
Filed — New Building
Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.
Q01080296-P2
06/02/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Saul Shapiro
05/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/22/2025
Objection raised — Energy
05/20/2025
Filed — New Building
Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.
Q01080296-Z6
05/20/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/12/2025
Permit issued — Structural
Q01080296-Z2-ST
05/01/2025
Permit issued — Plumbing
Q01080296-Z5-PL
04/22/2025
Special inspection requirement — Subgrade Inspections
Saul Shapiro
04/22/2025
Special inspection requirement — Structural Steel - Welding
IBRAHIM MOURAD
04/22/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Saul Shapiro
04/22/2025
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
04/22/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Saul Shapiro
04/22/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Saul Shapiro
04/09/2025
Filed — New Building
Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.
Q01080296-P1
04/07/2025
Filed — New Building
Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.
Q01080296-Z5
04/04/2025
Special inspection requirement — Concrete - Cast-In-Place
04/04/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Saul Shapiro
04/04/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Saul Shapiro
04/04/2025
Special inspection requirement — Subgrade Inspections
Saul Shapiro
04/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Saul Shapiro
04/04/2025
Special inspection requirement — Structural Steel - Welding
IBRAHIM MOURAD
03/27/2025
Special inspection requirement — Metering
IBRAHIM MOURAD
03/27/2025
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
03/27/2025
Special inspection requirement — Shutoff dampers
IBRAHIM MOURAD
03/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
03/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
03/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
03/27/2025
Special inspection requirement — Duct leakage testing, insulation and design
IBRAHIM MOURAD
03/19/2025
Permit issued — Support of Excavation
Q01080296-Z1-SE
03/19/2025
Permit issued — Foundation
Q01080296-S9-FO
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMaccarone Plumbing06/24/2026
DOB NOWMechanical SystemsPermit IssuedGilbane Building Company06/23/2026
DOB NOWSupport of ExcavationSigned-offGilbane Building Company06/23/2026
DOB NOWMechanical SystemsPermit IssuedGilbane Building Company06/11/2026
DOB NOWSupport of ExcavationSigned-offGilbane Building Company03/16/2026
DOB NOWFoundationSigned-offGilbane Building Company03/13/2026
DOB NOWStructuralPermit IssuedGilbane Building Company03/05/2026
DOB NOWConstruction FencePermit IssuedDarcon Construction03/03/2026
DOB NOWPlumbingSigned-offMaccarone Plumbing09/24/2025
DOB NOWStructuralPermit IssuedGilbane Building Company05/12/2025
DOB NOWPlumbingPermit IssuedMaccarone Plumbing05/01/2025
DOB NOWSupport of ExcavationSigned-offGilbane Building Company03/19/2025
DOB NOWFoundationSigned-offGilbane Building Company03/19/2025
DOB NOWConstruction FencePermit IssuedDarcon Construction03/06/2025
1 project · most recent 06/02/2025
Sprinkler System
FiledStatusContractorScope
06/02/2025——Sprinkler System
1 project · most recent 06/02/2025
Storm Water/Sanitary
FiledStatusContractorScope
06/02/2025Permit IssuedMaccarone PlumbingStorm, Water/Sanitary
1 project · most recent 06/02/2025
FiledStatusContractorScope
06/02/2025Permit IssuedMaccarone Plumbing3 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
06/30/2026Fenestration areas—energy_progress
06/30/2026Insulation placement and R values—energy_progress
06/30/2026Fenestration air leakage—energy_progress
06/30/2026Fenestration and door U-factor and product ratings—energy_progress
06/30/2026Air barrier - visual inspection—energy_progress
04/08/2026Maintenance informationIBRAHIM MOURADenergy_progress
03/13/2026Air barrier — testing IBRAHIM MOURADenergy_progress
02/24/2026HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
06/03/2025Maintenance informationIBRAHIM MOURADenergy_progress
06/02/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSaul Shapirospecial
04/22/2025Subsurface Investigations (Borings/Test Pits)Saul Shapirospecial
04/22/2025Subsurface Conditions – Fill Placement & In-Place DensitySaul Shapirospecial
04/22/2025Excavations - Sheeting, Shoring, and BracingSaul Shapirospecial
04/22/2025Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
04/22/2025Structural Steel - WeldingIBRAHIM MOURADspecial
04/22/2025Subgrade InspectionsSaul Shapirospecial
04/04/2025Excavations - Sheeting, Shoring, and BracingSaul Shapirospecial
04/04/2025Subsurface Investigations (Borings/Test Pits)Saul Shapirospecial
04/04/2025Subsurface Conditions – Fill Placement & In-Place DensitySaul Shapirospecial
04/04/2025Subgrade InspectionsSaul Shapirospecial
04/04/2025Structural Steel - WeldingIBRAHIM MOURADspecial
04/04/2025Concrete - Cast-In-Place—special
03/27/2025Duct leakage testing, insulation and designIBRAHIM MOURADenergy_progress
03/27/2025MeteringIBRAHIM MOURADenergy_progress
03/27/2025HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
Latest 25 of 73.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Zucker Hillside HospitalMedical / HealthcareFloor 3
Project Q01183957 Alteration · Permit Entire · 02/21/2025
Long Island Jewish Medical Center - Zucker Hillside HospitalMedical / HealthcareCellar, Floors 1–3, Roof
Project Q01080296 New Building · Permit Issued · 10/17/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/20/2026Q01183957-I1Request digital key ↗
08/20/2026Q01080296-Z6Request digital key ↗
08/20/2026Q01080296-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits5
▸DOB NOWDEP Stormwater Construction Permit4
08/13/2026Q01080296-S9Open ↗
08/13/2026Q01080296-I1Open ↗
08/13/2026Q01080296-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
08/20/2026Q01080296-Z1Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01080296-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01080296-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01080296-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWSpecial Inspector Seal & Signature21
08/29/2026Q01080296-Z3Open ↗
08/28/2026Q01080296-Z4Open ↗
08/28/2026Q01080296-S9Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/20/2026Q01080296-Z6Open ↗
08/20/2026Q01080296-P1Open ↗
08/20/2026Q01080296-S6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/29/2026Q01080296-Z3Open ↗
08/29/2026Q01080296-Z3Open ↗
08/28/2026Q01080296-Z4Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q01080296-I1Open ↗
08/13/2026Q01080296-Z6Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01080296-I1Open ↗
08/13/2026Q01080296-Z6Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/13/2026Q01080296-I1Open ↗
08/13/2026Q01080296-S9Open ↗
08/13/2026Q01080296-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026Q01080296-Z1Open ↗
08/13/2026Q01080296-S9Open ↗
08/13/2026Q01080296-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/13/2026Q01080296-Z2Open ↗
08/13/2026Q01080296-Z4Open ↗
08/13/2026Q01080296-Z6Open ↗
Showing 3 of 12 on file for this type
▸Other Documents8
▸DOB NOWWaiver Document2
08/13/2026Q01080296-Z1Open ↗
08/13/2026Q01080296-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01080296-I1Open ↗
08/13/2026Q01080296-Z6Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01080296-I1Open ↗
08/13/2026Q01080296-Z6Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01080296-Z1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026Q01080296-I1Open ↗