← Back
BuildNYC
Three families
265A NASSAU AVENUE
BROOKLYN · Greenpoint · BIN 3066648
💬 Discuss this project
1905Year Built
3Stories
C0Building Class
R6BZoning
3,135 sfGross Floor Area
3Units
3 Active Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Three families · 1,900 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Attic1 filing · 3 docs
Floor 2Under Construction3p · 2 filings · 20 docs
Floor 1Unit 1BUnder Construction5p · 2 filings · 20 docs
BasementUnder Construction18p · 1 filing · 20 docs
Sub-BasementDinanath Building3 filings · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Structural Engineering Integrated104/13/2026
Path Architecture401/29/2025
Adal Engineering101/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Quick Filing of NY403/21/2026
Quick Filing403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Root Core ConstructionGeneral Contractor208/27/2026
Empire PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Path Architecture1567404/13/2026
Structural Engineering Integ4174104/13/2026
Building Lifecycle
08/26/2026
Permit issued — Foundation
B00773476-S2-FO
06/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00773476-I1-GC
04/24/2026
Objection resolved — Resolved
04/17/2026
Objection raised — Other
63 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedRoot Core Construction08/26/2026
DOB NOWPlumbingPermit IssuedEmpire Plumbing03/17/2026
DOB NOWGeneral ConstructionPermit IssuedRoot Core Construction11/12/2025
1 project · most recent 01/14/2025
FiledStatusContractorScope
01/14/2025———
1 project · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026Permit IssuedAll-Rite Electric Corp of NYGeneral Wiring
1 project · most recent 04/13/2026
FiledStatusContractorScope
04/13/2026Permit IssuedRoot Core Construction—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/31/2026Subgrade InspectionsChris Yiuspecial
03/31/2026Footing and FoundationChris Yiuprogress
03/31/2026FinalChris Yiuprogress
03/31/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/31/2026UnderpinningChris Yiuspecial
03/31/2026Tenant Protection Plan ComplianceWOJCIECH OKTAWIECspecial
03/31/2026Concrete - Cast-In-PlaceChris Yiuspecial
03/31/2026Structural Stability – Alterations of existing buildingsChris Yiuspecial
01/06/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
01/23/2025HVAC-R and service water piping design and insulationWOJCIECH OKTAWIECenergy_progress
01/23/2025Maintenance informationWOJCIECH OKTAWIECenergy_progress
01/23/2025Permanent certificateWOJCIECH OKTAWIECenergy_progress
01/23/2025HVAC-R and service water heating system controlsWOJCIECH OKTAWIECenergy_progress
01/23/2025HVAC-R and service water heating equipmentWOJCIECH OKTAWIECenergy_progress
07/24/2024Sprinkler Systems—special
08/04/2021Concrete - Cast-In-PlaceWOJCIECH OKTAWIECspecial
08/04/2021Structural Steel - Details—special
08/03/2021FinalWOJCIECH OKTAWIECprogress
08/03/2021Underpinning—special
08/03/2021Structural Stability – Alterations of existing buildings—special
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account