← Back
BuildNYC
Elevator apt, fireproof without stores
266 WASHINGTON AVENUE
BROOKLYN · Clinton Hill · BIN 3055074
💬 Discuss this project
1928Year Built
6Stories
D3Building Class
R6BZoning
105,360 sfGross Floor Area
114Units
LL97 CoveredRent Stabilized107 Active Violations 105 unresolved · 2 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 266 Washington Avenue Investor · 27,000 sf lot · 3.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof266 Washington Avenue Investor, LLCUnder Construction5p · 4 filings · 20 docs
Floor 6266 Washington Avenue Investor, LLC1 filing · 5 docs
Floor 5266 Washington Avenue Investor, LLC1 filing · 5 docs
Floor 4266 Washington Avenue Investor, LLC1 filing · 5 docs
Floor 3266 Washington Avenue Investor, LLC1 filing · 5 docs
Floor 2266 Washington Avenue Investor, LLC1 filing · 5 docs
Floor 1266 Washington Avenue Investor, LLCUnder Construction6p · 3 filings · 20 docs
Cellar266 Washington Avenue Investor, LLCUnder Construction11p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
266 Wasington Ave Investor6210/26/2026
266 Washington Ave2603/21/2026
A&E Real Estate903/22/2026
Dermot Orchard St803/21/2026
Parkway Realty703/21/2026
Metropolitan Portfolio II603/21/2026
BRG Queens203/21/2026
Washington 266 Realty Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sal V. Tartaglione Architect111/20/2024
WRG Engineering102/28/2024
KMB Design Group411/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services503/21/2026
WRG Engineering P C203/21/2026
Lewsan Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EC Electrical ContractorGeneral Contractor203/21/2026
Argon ElectricalElectrical203/22/2026
Amp CommunicationsGeneral Contractor104/09/2026
Apex Group NYGeneral Contractor110/26/2026
Comcell ConstructionGeneral Contractor107/08/2026
JW Development HoldingsGeneral Contractor104/09/2026
Henry Myers P & HPlumbing107/08/2026
Pipe RitePlumbing107/08/2026
RPJ ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355111/20/2024
WRG Engineering4403102/28/2024
KMB Design Group513411/16/2022
Building Lifecycle
10/23/2026
Failure to maintain elevator in buildings code compliant as per bc 3001.2 & 27-987 upon an inspection the elevator is found out of service creating…
ECB violation · open
10/22/2026
Permit renewed — General Construction
Renewed with changes
B00888194-I1-GC
08/29/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE KITCHEN LOCATED AT APT B4, 2nd STORY, 1st…
HPD violation · open
08/29/2026
§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELECTRICAL OUTLET AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT B4, 2nd STORY, 1st APARTMENT…
HPD violation · open
08/29/2026
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVER AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT B4, 2nd STORY, 1st…
HPD violation · open
266 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedApex Group NY10/22/2026
DOB NOWPlumbingSigned-offPipe Rite01/20/2026
DOB NOWGeneral ConstructionPermit IssuedAmp Communications12/05/2025
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings05/22/2025
DOB NOWPlumbingSigned-offHenry Myers P & H04/24/2025
DOB NOWAntennaPermit IssuedComcell Construction12/21/2022
DOB NOWAntennaPermit IssuedEC Electrical Contractor07/25/2018
BISOTISSUEDJW Development Holdings06/30/2025
BISPLISSUEDHenry Myers P & H04/30/2025
BISPLISSUEDHenry Myers P & H04/30/2025
BISOTISSUEDJW Development Holdings03/11/2021
BISPLISSUEDHenry Myers P & H04/08/2019
BISPLISSUEDHenry Myers P & H04/08/2019
BISPLISSUEDHenry Myers P & H04/08/2019
BISPLISSUEDHenry Myers P & H02/05/2019
BISPLISSUEDHenry Myers P & H09/19/2018
BISPLISSUEDAura Plumbing09/10/2018
BISOTISSUEDJW Development Holdings08/23/2018
BISOTISSUEDEC Electrical Contractor08/16/2018
BISOTISSUEDJW Development Holdings07/06/2018
BISOTISSUEDJW Development Holdings06/25/2018
BISOTISSUEDJW Development Holdings06/13/2018
BISOTISSUEDJW Development Holdings04/30/2018
BISOTISSUEDJW Development Holdings04/09/2018
BISOTISSUEDJW Development Holdings06/07/2017
BISPLISSUEDHenry Myers P & H07/21/2016
BISOTISSUEDJW Development Holdings06/15/2016
BISBLISSUEDKings Plaza P & H04/01/2016
BISPLISSUEDKings Plaza P & H04/01/2016
BISOTISSUEDJW Development Holdings03/31/2016
BISPLISSUEDHenry Myers P & H06/12/2015
BISOTISSUEDJW Development Holdings05/28/2015
BISEQISSUEDRock Group NY04/01/2015
BISEQISSUEDRock Group NY04/01/2015
BISPLISSUEDSafety Plumbing & Heating09/17/2014
BISOTISSUEDFreedom G.C07/16/2014
BISOTISSUEDMRMD NY04/14/2014
BISEQISSUEDRock Group NY04/02/2014
BISEQISSUEDRock Group NY03/27/2014
BISOTISSUEDIbs General Contracting NY10/03/2013
+ 17 more permits on file
4 projects · most recent 04/29/2026
General Wiring
FiledStatusContractorScope
04/29/2026CompleteAxcel Electric Co—
09/07/2018CompleteArgon ElectricalGeneral Wiring
04/02/2018CompleteArgon ElectricalGeneral Wiring
01/18/2018CompleteArgon ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/05/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/03/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/12/2025Structural Stability – Alterations of existing buildingsWinston Garciaspecial
02/12/2025Fire-Resistant Penetrations and JointsWinston Garciaspecial
07/13/2023Tenant Protection Plan ComplianceWinston Garciaspecial
06/09/2023FinalWinston Garciaprogress
11/16/2022Tenant Protection Plan ComplianceEkata Shahspecial
11/16/2022Tenant Protection Plan ComplianceEkata Shahspecial
11/16/2022Fire-Resistant Penetrations and JointsEkata Shahspecial
06/08/2022Mechanical SystemsEkata Shahspecial
06/08/2022FinalEkata Shahprogress
06/08/2022Post-installed AnchorsEkata Shahspecial
882 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account