← Back
QUEENS
27-09 44 DRIVE
QUEENS · BIN 4625167
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Floor 122p · 3 filings · 8 docs
Floor 11
Floor 10
Floor 9
Floor 8137p · 1 filing · 20 docs
Floor 7142p · 1 filing · 20 docs
Floor 6140p · 1 filing · 20 docs
Floor 5140p · 2 filings · 20 docs
Floor 4140p · 1 filing · 20 docs
Floor 3144p · 1 filing · 20 docs
Floor 2144p · 1 filing · 20 docs
Floor 1152p · 2 filings · 20 docs
Cellar144p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP5807/08/2026
CW REALTY1507/08/2026
NAYA507/08/2026
ULYSSES803/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3403/21/2026
AE DESIGN SOLUTION3003/21/2026
ZV Drafting103/21/2026
AJ SERVICE EXPERTS2003/21/2026
UNIVERSAL SIGNS SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B CONTRACTORS GROUP LLCGeneral Contractor3807/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1707/08/2026
TARGET CONSTRUCTION LLCGeneral Contractor407/08/2026
PRIME PIPING & HEATING INFire Protection307/08/2026
UNIVERSAL SIGNS SVCScaffold207/08/2026
A. BONADUCE, INCGeneral Contractor204/09/2026
GO GREENER PLUMBING LLCPlumbing107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
GO GREENER PLUMBING LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.1291512/18/2025
METROSPEC SIA6420511/19/2025
REGIONAL TESTING CORP.3941409/24/2024
LEO Y LEE ASSOCIATES2481404/09/2024
BIG APPLE GROUP NY A RMA9168206/13/2023
Building Lifecycle
All (252)Filed (44)Permit Issued (38)Signed Off (23)Violation (14)Inspection (23)Objection (80)Special Inspection (30)
01/20/2026
Signed off — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-S1
12/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
12/24/2025
Special inspection requirement — Sprinkler Systems
Roger Tan
12/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH YOUNG
12/18/2025
Filed — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-P3
12/17/2025
Special inspection requirement — Sprinkler Systems
Roger Tan
12/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
12/03/2025
Signed off — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-I1
12/03/2025
Signed off — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-S2
11/19/2025
Filed — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-P2
10/24/2025
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR NAYA, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01240436-I1
10/24/2025
Signed off — Alteration
Q01240432-I1
08/14/2025
Permit issued — Sign
Q01240432-I1-SG
08/12/2025
Permit issued — Sign
Q01240436-I1-SG
08/08/2025
Filed — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR NAYA, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01240436-I1
08/08/2025
Filed — Alteration
Q01240432-I1
07/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2025
Special inspection requirement — Final
JERE MURDOCH
06/30/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/28/2025
Special inspection requirement — Maintenance information
Roger Tan
04/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
04/28/2025
Special inspection requirement — Ventilation and air distribution system
Roger Tan
04/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
04/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH YOUNG
04/28/2025
Special inspection requirement — Shutoff dampers
Roger Tan
04/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
04/28/2025
Special inspection requirement — Mechanical Systems
Roger Tan
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
04/28/2025
Special inspection requirement — Final
Roger Tan
04/28/2025
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
04/25/2025
Filed — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-P1
04/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
04/22/2025
Special inspection requirement — Ventilation and air distribution system
Roger Tan
04/22/2025
Special inspection requirement — Shutoff dampers
Roger Tan
04/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
04/22/2025
Special inspection requirement — Maintenance information
Roger Tan
04/22/2025
Special inspection requirement — Final
Michael Risbergs
04/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
04/22/2025
Special inspection requirement — Mechanical Systems
Michael Risbergs
04/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Risbergs
04/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2025
Permit issued — Plumbing
Q01175365-S1-EW-SP
03/25/2025
Permit issued — Mechanical Systems
Q01175365-S2-MS
03/25/2025
Permit issued — Sprinklers
Q01175365-S1-PL
03/17/2025
Permit issued — General Construction
Q01175365-I1-GC
02/05/2025
Filed — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-S1
02/05/2025
Filed — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-I1
02/05/2025
Filed — Alteration
INTERIOR RENOVATION AT 1ST FLOOR COMMERCIAL SPACE, NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01175365-S2
01/22/2025
Signed off — New Building
FO/EA filed for proposed 14 story residential building in conjunction with Q00582731
Q00582731-S6
11/15/2024
Signed off — New Building
FO/EA filed for proposed 14 story residential building in conjunction with Q00582731
Q00582731-S5
09/24/2024
Filed — New Building
FO/EA filed for proposed 14 story residential building in conjunction with Q00582731
Q00582731-A2
09/09/2024
Signed off — New Building
FO/EA filed for proposed 14 story residential building in conjunction with Q00582731
Q00582731-S4
Latest 60 of 252 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC08/14/2025
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC08/12/2025
DOB NOWPlumbingSigned-offGO GREENER PLUMBING LLC04/02/2025
DOB NOWMechanical SystemsSigned-offA. BONADUCE, INC03/25/2025
DOB NOWSprinklersSigned-offGO GREENER PLUMBING LLC03/25/2025
DOB NOWGeneral ConstructionSigned-offA. BONADUCE, INC03/17/2025
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC05/09/2024
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC04/22/2024
DOB NOWMechanical SystemsSigned-offB CONTRACTORS GROUP LLC04/09/2024
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC03/06/2024
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC02/23/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/01/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC01/31/2024
DOB NOWSupport of ExcavationSigned-offB CONTRACTORS GROUP LLC12/29/2023
DOB NOWSupport of ExcavationSigned-offB CONTRACTORS GROUP LLC12/21/2023
DOB NOWStructuralSigned-offB CONTRACTORS GROUP LLC12/21/2023
DOB NOWEarth WorkSigned-offB CONTRACTORS GROUP LLC12/20/2023
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC12/20/2023
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC12/19/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/21/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC11/20/2023
DOB NOWFoundationSigned-offB CONTRACTORS GROUP LLC11/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/09/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN10/24/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC10/24/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC10/24/2023
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC08/23/2023
DOB NOWFoundationSigned-offB CONTRACTORS GROUP LLC08/18/2023
DOB NOWSupport of ExcavationSigned-offB CONTRACTORS GROUP LLC07/26/2023
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC06/29/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/11/2023
DOB NOWEarth WorkSigned-offTARGET CONSTRUCTION LLC07/22/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/29/2022
DOB NOWEarth WorkSigned-offTARGET CONSTRUCTION LLC06/03/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/13/2022
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC04/06/2022
BISEQISSUEDNEW EMPIRE CONSTRUCTION, INC04/09/2003
BISOTISSUEDNEW EMPIRE CONSTRUCTION, INC04/09/2003
+ 10 more permits on file
1 project · most recent 09/24/2024
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2024Permit IssuedB CONTRACTORS GROUP LLCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM2-U1 41,000 BTU · Condensing Unit ×3
MXZ-SM48NAM 50,000 BTU · Condensing Unit ×1
PUZ-A12NKA7 12,000 BTU · Condensing Unit ×1
MXZ-SM36NAM2 41,000 BTU · Condensing Unit ×3
MXZ-SM48NAM2 50,000 BTU · Condensing Unit ×1
Haier AZ65H07DAB 409 CFM · Heat Pump Outdoor ×97
AS65H15DAB 449 CFM · Heat Pump Outdoor ×62
AZ65H12DAB 449 CFM · Heat Pump Outdoor ×52
Ventilation
Greenheck G-099-VG 840 CFM · Exhaust Fan ×10
G-100-VG 920 CFM · Exhaust Fan ×4
G-060-VG 60 CFM · Exhaust Fan ×2
G-095-VG 360 CFM · Exhaust Fan ×2
G-120-VG 1,180 CFM · Exhaust Fan ×2
SQ-60-VG 120 CFM · Exhaust Fan ×2
SQ-70-VG 50 CFM · Exhaust Fan ×2
Cooling
Mitsubishi Electric PUY-A12NKA7 12,000 BTU · Condensing Unit ×1
1 project · most recent 09/24/2024
Sprinkler System
FiledStatusContractorScope
09/24/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 09/24/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/24/2024Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
6 projects · most recent 07/10/2024
General Wiring
FiledStatusContractorScope
07/10/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
01/18/2024CompleteSOLAS ELECTRICAL CORP—
01/10/2024CompleteSTAR ELEC'L CONTRACTORS C—
10/20/2023CompleteSOLAS ELECTRICAL CORP—
09/20/2023CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
05/13/2022CompleteV. VASS ELECTRIC CORP—
1 project · most recent 09/24/2024
FiledStatusContractorScope
09/24/2024Permit IssuedB CONTRACTORS GROUP LLC5 scope_items
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
07/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
08/07/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/05/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/05/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
06/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/21/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/04/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/19/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/05/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
02/05/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/18/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
12/24/2025Sprinkler SystemsRoger Tanspecial
12/24/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
12/24/2025Tenant Protection Plan ComplianceJOSEPH YOUNGspecial
12/17/2025Sprinkler SystemsRoger Tanspecial
12/17/2025Tenant Protection Plan Compliance—special
12/17/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
07/21/2025FinalJERE MURDOCHprogress
04/28/2025FinalRoger Tanprogress
04/28/2025Energy Code Compliance InspectionsRoger Tanprogress
04/28/2025HVAC-R and service water heating equipmentRoger Tanenergy_progress
04/28/2025HVAC-R and service water piping design and insulationRoger Tanenergy_progress
04/28/2025Ventilation and air distribution systemRoger Tanenergy_progress
04/28/2025HVAC-R and service water heating system controlsRoger Tanenergy_progress
04/28/2025Maintenance informationRoger Tanenergy_progress
04/28/2025Shutoff dampersRoger Tanenergy_progress
04/28/2025Duct leakage testing, insulation and designRoger Tanenergy_progress
04/28/2025Tenant Protection Plan ComplianceJOSEPH YOUNGspecial
04/28/2025Mechanical SystemsRoger Tanspecial
04/28/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
04/22/2025Maintenance informationRoger Tanenergy_progress
04/22/2025Tenant Protection Plan Compliance—special
04/22/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
04/22/2025Mechanical SystemsMichael Risbergsspecial
04/22/2025Energy Code Compliance InspectionsMichael Risbergsprogress
04/22/2025FinalMichael Risbergsprogress
Latest 25 of 150.
▾Documents — 264 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch45
08/27/2026Q00580362-I1Request digital key ↗
08/26/2026Q00734286-P1Request digital key ↗
08/26/2026Q00734286-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION14
08/08/2024400131068Open ↗
07/05/2024400486354Open ↗
06/27/2024400486354Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
06/03/2024440805130Open ↗
05/28/2024440805130Open ↗
09/23/2023440805130Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
11/22/2024440805130Open ↗
▸BISDOT- 410 PERMITS FOR ADA RAMPS1
11/07/2024440805130Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026Q00582731-I1Open ↗
08/14/2026Q00582731-P1Open ↗
08/13/2026Q00582731-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026Q00582731-I1Open ↗
08/14/2026Q00582731-P1Open ↗
08/13/2026Q00582731-P4Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/23/2024440805130Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications138
▸DOB NOWProgress Inspector Seal & Signature48
09/14/2026Q01175365-I1Open ↗
09/14/2026Q01175365-I1Open ↗
09/01/2026Q00582731-A2Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature45
08/26/2026Q00734286-P1Open ↗
08/26/2026Q00734286-I1Open ↗
08/24/2026Q00902094-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/23/2026Q00582731-P3Open ↗
09/14/2026Q01175365-I1Open ↗
09/14/2026Q01175365-I1Open ↗
Showing 3 of 43 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/23/2023440805130Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/23/2023440805130Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/23/2026Q00582731-I1Open ↗
08/14/2026Q00582731-P1Open ↗
08/13/2026Q00582731-P4Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/23/2026Q00582731-I1—
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist3
08/23/2026Q00582731-I1Open ↗
08/13/2026Q00582731-P4Open ↗
08/13/2026Q00582731-P1Open ↗
▸BISSTREET TREES SITE PLAN1
11/05/2024440805130Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/15/2024440805130Open ↗
▸BISSTREET TREE CHECKLIST1
10/17/2023440805130Open ↗
▸BISSTREET TREE SIGNOFF1
11/05/2024440805130Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00582731-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00582731-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00582731-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00582731-S4Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00582731-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/23/2026Q00582731-I1Open ↗
08/14/2026Q00582731-P1Open ↗
Showing 2 of 3 on file for this type
▸BISBPP: FIELD INSPECTION1
11/07/2024440805130Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00582731-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q00734286-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/22/2024440805130Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/29/2024440805130Open ↗
▸BISBPP-UTILITY APPROVAL TO RELOCATE POLE1
02/15/2024440805130Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
11/07/2024440805130Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
11/22/2024440805130Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/23/2023440805130Open ↗
▸Other Documents26
▸DOB NOWPro Cert Restriction Exception (LL158/17)5
08/13/2026Q00582731-Z5Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/23/2026Q00582731-I1Open ↗
08/14/2026Q00582731-P1Open ↗
08/13/2026Q00582731-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/23/2026Q00582731-I1Open ↗
08/14/2026Q00582731-P1Open ↗
08/13/2026Q00582731-P4Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026Q00582731-S2Open ↗
08/13/2026Q00734286-I1Open ↗
08/13/2026Q00582731-S1Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00582731-I1Open ↗
08/14/2026Q00582731-P1Open ↗
08/13/2026Q00582731-P4Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
11/22/2024440805130Open ↗
11/22/2024440805130Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
02/15/2024440805130Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
10/17/2023440805130Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
11/07/2024440805130Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
11/22/2024440805130Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/31/2023440805130Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
11/07/2024440805130Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00582731-I1Open ↗