MANHATTAN · BIN 1015580
💬 Discuss this project
1881Year Built
6Stories
W9Building Class
M1-8A/R11Zoning
101,600 sfGross Floor Area
7Units
LL97 Covered2 Active Violations 1 unresolved · 1 paperwork only ▸
Miscellaneous educational facility · Owner of record: Joseph Rosen Trust, JP Rosen Trustee · 16,650 sf lot · 6.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFigma, BettermentUnder Construction82p · 10 filings · 20 docs
BulkheadJlj, LLC2p · 2 filings · 20 docs
Floor 6Figma, BettermentUnder Construction116p · 12 filings · 20 docs
Floor 5FigmaUnder Construction103p · 6 filings · 20 docs
Floor 4Edrington Spirits54p · 4 filings · 20 docs
Floor 3Jlj, LLC29p · 3 filings · 20 docs
Floor 2Jlj, LLC29p · 3 filings · 20 docs
Floor 1Temporary platform installation13p · 79 filings · 20 docs
MezzanineJlj, LLC72p · 44 filings · 20 docs
CellarJlj, LLC49p · 8 filings · 20 docs
Basement2p · 1 filing · 3 docs
Sub-Basement6p · 1 filing · 3 docs
Site & exteriorJlj, LLC5p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JLJ30410/13/2026
Aesnyc810/13/2026
Joseph Rosen Trust, JP Rosen Trustee603/22/2026
Olmstead Properties203/22/2026
Francessachar103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC8003/21/2026
Christopher Compton Architect2003/21/2026
Municipal Building Consultants1703/21/2026
Codegreen903/21/2026
Construction Permit Services2003/21/2026
Walter T. Gorman, PE203/21/2026
Milrose Consultants1003/21/2026
Lewsan Consulting203/21/2026
DC Turano203/21/2026
Laurence Dalfino Architect203/21/2026
Walter T Gorman Pepc203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Green Earth Buildings ConGeneral Contractor1107/08/2026
John Gallin & SonGeneral Contractor807/22/2026
G & A RestorationScaffold707/08/2026
Addison Plumbing and HeatingFire Protection607/08/2026
Accurate MechanicalFire Protection407/08/2026
Benchmark BuildersGeneral Contractor407/09/2026
Addison Plumbing and HeatingPlumbing407/08/2026
Archstone BuildersGeneral Contractor407/08/2026
Winick ProductionsGeneral Contractor309/13/2026
AP Mechanicalspecialty_contractor303/21/2026
Folks ElectricalElectrical203/22/2026
Allstate SprinklerFire Protection207/08/2026
BBM DevelopmentGeneral Contractor203/21/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Elpo Electrical ContgElectrical103/22/2026
Shaw MechanicalPlumbing107/08/2026
NY Electric & DatacomElectrical103/21/2026
M&T ElectricalElectrical103/22/2026
P&H Electric D/B/A Mage ElectricElectrical103/22/2026
AMA InteriorsGeneral Contractor104/09/2026
BG InteriorsGeneral Contractor107/08/2026
Cannon Mechanicalspecialty_contractor107/05/2026
Capital Cooling SystemsGeneral Contractor104/09/2026
JRR ContractingGeneral Contractor107/08/2026
Master Cooling Service CoGeneral Contractor107/08/2026
Spring Air HVACspecialty_contractor107/08/2026
Phoenix Sutton STRScaffold107/08/2026
All Hour Sewer Service CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Codegreen510909/29/2026
Alan Margolin & Associates423703/03/2026
Jack Green Associates422503/06/2024
Hansen Engineering8174102/08/2023
Emtg Consultants4222502/07/2023
Waypoint Consulting Group6175109/08/2022
Environmental Code Consulting5516408/31/2022
PSI Agency254311/30/2021
Sag Engineering & Consulting608711/19/2021
Building Lifecycle
All (300)Filed (80)Permit Issued (55)Signed Off (19)Violation (15)Inspection (23)Objection (78)Special Inspection (30)
10/20/2026
Filed — No Work
M01472464-I1
10/19/2026
Filed — No Work
M01476371-I1
10/14/2026
Signed off — Alteration
M01301152-I1
10/14/2026
Signed off — Alteration
M01301125-I1
10/09/2026
Signed off — Alteration
Mechanical modifications taking place on the 5 & 6 floors as per plans filed herewith. No change in use, egress or occupancy
M01320322-I1
10/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/07/2026
Signed off — Alteration
General construction modifications taking place on the 5th & 6th floor as per plans filed herewith. No change in use, egress or occupancy
M01301109-I1
10/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/29/2026
Filed — Alteration
Mechanical modifications taking place on the 5 & 6 floors as per plans filed herewith. No change in use, egress or occupancy
M01320322-P3
09/24/2026
Filed — No Work
M01460457-I1
09/23/2026
Signed off — Alteration
TEMPORARY PLATFORM IN CONJUNCTION WITH TPA APPLICATION #M01452685-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01452708-I1
09/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/15/2026
Signed off — Alteration
TEMPORARY SCENIC ELEMENTS AND PLATFORM FOR EVENT IN CONJUNCTION WITH TEMPORARY PLACE OF ASSEMBLY (DOB#M01448309-I1). NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01448319-I1
09/11/2026
Permit issued — General Construction
M01452708-I1-GC
09/09/2026
Signed off — Alteration
STRUCTURAL WORK FOR ELEVATOR SHAFT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01306491-S1
09/09/2026
Signed off — Alteration
STRUCTURAL WORK ON 6TH FLOOR FOR ELEVATOR SHAFT AS PER PLANS FILED HEREWITH.
M01321765-I1
09/09/2026
Signed off — Alteration
STRUCTURAL WORK FOR THE ROOF TERRACE AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01306923-S1
09/08/2026
Objection resolved — Addressed
09/04/2026
Filed — Alteration
TEMPORARY PLATFORM IN CONJUNCTION WITH TPA APPLICATION #M01452685-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01452708-I1
09/04/2026
Filed — No Work
M01452685-I1
09/04/2026
Objection raised — Other
09/01/2026
Signed off — Alteration
STRUCTURAL WORK FOR THE ROOF TERRACE AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01306923-I1
09/01/2026
Signed off — Alteration
STRUCTURAL WORK FOR ELEVATOR SHAFT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01306491-I1
09/01/2026
Filed — No Work
M01451568-I1
09/01/2026
Objection resolved — Addressed
09/01/2026
Objection resolved — Addressed
09/01/2026
Objection resolved — Addressed
08/29/2026
Objection raised — Other
08/29/2026
Objection raised — Other
08/29/2026
Objection raised — Other
08/28/2026
Permit issued — General Construction
M01448319-I1-GC
08/28/2026
Special inspection requirement — Final
David Haner
08/27/2026
Filed — Alteration
TEMPORARY SCENIC ELEMENTS AND PLATFORM FOR EVENT IN CONJUNCTION WITH TEMPORARY PLACE OF ASSEMBLY (DOB#M01448309-I1). NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01448319-I1
08/27/2026
Filed — No Work
M01448309-I1
08/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/19/2026
Special inspection requirement — Final
David Haner
08/12/2026
Filed — Alteration CO
ALT CO FILED FOR CHANGE OF USE ON ROOF TO A RECREATION SPACE AS PER PLANS FILED HEREWITH.
M01253932-P1
08/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
08/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2026
Signed off — Alteration
TEMPORARY SCENIC ELEMENT FOR EVENT IN CONJUNCTION WITH TEMPORARY PLACE OF ASSEMBLY (DOB#M01430067-I1). NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01430077-I1
07/22/2026
Permit issued — General Construction
M01430077-I1-GC
07/21/2026
Filed — Alteration
Mechanical modifications taking place on the 5 & 6 floors as per plans filed herewith. No change in use, egress or occupancy
M01320322-P2
07/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
James Sullivan Jr
07/21/2026
Special inspection requirement — Mechanical Systems
James Sullivan Jr
07/21/2026
Special inspection requirement — Maintenance information
James Sullivan Jr
07/21/2026
Special inspection requirement — Final
James Sullivan Jr
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
James Sullivan Jr
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
James Sullivan Jr
07/20/2026
Filed — Alteration
Mechanical modifications taking place on the 5 & 6 floors as per plans filed herewith. No change in use, egress or occupancy
M01320322-P1
07/20/2026
Permit issued — General Construction
M01253932-I1-GC
07/20/2026
Violation issued (ECB, open)
Construction
07/20/2026
Special inspection requirement — Final
HATIM ELSAID
07/17/2026
Filed — Alteration
General construction modifications taking place on the 5th & 6th floor as per plans filed herewith. No change in use, egress or occupancy
M01301109-P2
07/14/2026
Filed — Alteration
TEMPORARY SCENIC ELEMENT FOR EVENT IN CONJUNCTION WITH TEMPORARY PLACE OF ASSEMBLY (DOB#M01430067-I1). NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01430077-I1
07/14/2026
Filed — No Work
M01430067-I1
07/13/2026
Special inspection requirement — Final
David Haner
07/09/2026
Special inspection requirement — Final
HATIM ELSAID
07/07/2026
Permit issued — General Construction
M01320322-I1-GC
06/25/2026
Filed — No Work
M01415551-I1
06/25/2026
Filed — No Work
M01415547-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWinick Productions09/11/2026
DOB NOWGeneral ConstructionSigned-offWinick Productions08/28/2026
DOB NOWGeneral ConstructionSigned-offWinick Productions07/22/2026
DOB NOWGeneral ConstructionPermit IssuedJohn Gallin & Son07/20/2026
DOB NOWGeneral ConstructionSigned-offBenchmark Builders07/07/2026
DOB NOWSprinklersPermit IssuedProdigy Plumbing & Heating02/17/2026
DOB NOWPlumbingPermit IssuedProdigy Plumbing & Heating02/17/2026
DOB NOWStructuralSigned-offJohn Gallin Son01/05/2026
DOB NOWMechanical SystemsPermit IssuedCannon Mechanical01/05/2026
DOB NOWStructuralSigned-offJohn Gallin Son01/05/2026
DOB NOWGeneral ConstructionSigned-offJohn Gallin Son12/30/2025
DOB NOWGeneral ConstructionSigned-offJohn Gallin Son12/30/2025
DOB NOWStructuralSigned-offBenchmark Builders12/18/2025
DOB NOWStructuralSigned-offJohn Gallin Son12/04/2025
DOB NOWPlumbingSigned-offJames Cruz11/05/2025
DOB NOWGeneral ConstructionSigned-offBenchmark Builders10/29/2025
DOB NOWMechanical SystemsSigned-offCapital Cooling Systems10/28/2025
DOB NOWSprinklersPermit IssuedProdigy Plumbing & Heating10/28/2025
DOB NOWGeneral ConstructionSigned-offAMA Interiors09/16/2025
DOB NOWSprinklersSigned-offProdigy Plumbing & Heating12/12/2023
DOB NOWPlumbingSigned-offProdigy Plumbing & Heating08/04/2023
DOB NOWSprinklersSigned-offProdigy Plumbing & Heating08/04/2023
DOB NOWGeneral ConstructionSigned-offBG Interiors03/17/2023
DOB NOWSprinklersPermit IssuedProdigy Plumbing & Heating03/03/2023
DOB NOWGeneral ConstructionSigned-offJohn Gallin Son12/12/2022
DOB NOWGeneral ConstructionSigned-offJRR Contracting10/03/2022
DOB NOWMechanical SystemsSigned-offSpring Air HVAC08/30/2022
DOB NOWPlumbingSigned-offProdigy Plumbing & Heating08/15/2022
DOB NOWGeneral ConstructionSigned-offBBM Development08/11/2022
DOB NOWMechanical SystemsSigned-offMaster Cooling Service Co05/19/2022
DOB NOWGeneral ConstructionSigned-offArchstone Builders12/06/2021
DOB NOWSprinklersSigned-offAccurate Mechanical10/15/2021
DOB NOWSprinklersSigned-offAccurate Mechanical10/15/2021
DOB NOWSprinklersSigned-offProdigy Plumbing & Heating10/13/2021
DOB NOWMechanical SystemsSigned-offGreen Earth Buildings Con10/12/2021
DOB NOWPlumbingSigned-offProdigy Plumbing & Heating10/07/2021
DOB NOWGeneral ConstructionSigned-offArchstone Builders07/01/2021
DOB NOWMechanical SystemsSigned-offArchstone Builders06/30/2021
DOB NOWSprinklersSigned-offAllstate Sprinkler06/29/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR04/16/2021
+ 60 more permits on file
1 project · most recent 09/29/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/29/2026Signed-offBenchmark BuildersHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-AK12NL 12,000 BTU · Split System ×1
PUY-AK36NL 36,000 BTU · Condensing Unit ×1
1 project · most recent 09/29/2026
Sprinkler System
FiledStatusContractorScope
09/29/2026Permit IssuedAddison Plumbing and HeatingSprinkler System
1 project · most recent 09/29/2026
Water/Sanitary
FiledStatusContractorScope
09/29/2026Permit IssuedAddison Plumbing and HeatingWater/Sanitary
19 projects · most recent 03/12/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
03/12/2026Permit IssuedOn Point ElectricGeneral Wiring
01/15/2026Permit IssuedNY Electric & DatacomGeneral Wiring
10/27/2025CompleteL.E.A. Electric—
07/20/2023CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
05/06/2023CompleteAll City ElectricalGeneral Wiring
07/11/2021Permit IssuedM&T ElectricalGeneral Wiring
03/31/2021CompleteElpo Electrical Contg—
12/21/2020Permit IssuedAnthony G FerryGeneral Wiring
10/29/2020CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
09/01/2020Permit IssuedCedar Electrical ContractorsGeneral Wiring
08/28/2020CompleteFolks ElectricalHVAC Wiring
01/25/2020CompleteP&H Electric D/B/A Mage Electric—
12/09/2019CompleteAlba ElectricGeneral Wiring
06/25/2019CompleteP&H Electric D/B/A Mage ElectricGeneral Wiring
06/21/2019CompleteAnthony G Ferry—
4 projects · most recent 03/03/2026
Steel Concrete Masonry
FiledStatusContractorScope
03/03/2026Signed-offJohn Gallin & SonSteel, Concrete, Masonry
03/03/2026Signed-offJohn Gallin & SonSteel, Concrete
11/25/2025Signed-offJohn Gallin & SonSteel
12/10/2019Permit IssuedGreen Earth Buildings Con2 scope_items
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
10/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/18/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/14/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/14/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 144
DateRequirementInspectorRole
08/28/2026FinalDavid Hanerprogress
08/19/2026FinalDavid Hanerprogress
08/07/2026Fire-Resistance Rated ConstructionYoung Suhprogress
07/21/2026FinalJames Sullivan Jrprogress
07/21/2026Mechanical SystemsJames Sullivan Jrspecial
07/21/2026HVAC-R and service water heating equipmentJames Sullivan Jrenergy_progress
07/21/2026HVAC-R and service water piping design and insulationJames Sullivan Jrenergy_progress
07/21/2026HVAC-R and service water heating system controlsJames Sullivan Jrenergy_progress
07/21/2026Maintenance informationJames Sullivan Jrenergy_progress
07/20/2026FinalHATIM ELSAIDprogress
07/13/2026FinalDavid Hanerprogress
07/09/2026FinalHATIM ELSAIDprogress
06/11/2026Public Assembly Emergency LightingJames Sullivan Jrprogress
04/22/2026FinalHATIM ELSAIDprogress
03/24/2026HVAC-R and service water piping design and insulationJames Sullivan Jrenergy_progress
03/24/2026HVAC-R and service water heating equipmentJames Sullivan Jrenergy_progress
03/24/2026HVAC-R and service water heating system controlsJames Sullivan Jrenergy_progress
03/24/2026FinalJames Sullivan Jrprogress
03/24/2026Mechanical SystemsJames Sullivan Jrspecial
03/24/2026Maintenance informationJames Sullivan Jrenergy_progress
03/04/2026FinalYoung Suhprogress
03/04/2026Concrete - Cast-In-PlaceYoung Suhspecial
03/04/2026Structural Steel - DetailsYoung Suhspecial
03/04/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
03/04/2026Sprayed fire-resistant materialsYoung Suhspecial
Latest 25 of 144.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
FigmaOfficeFloors 5, 6, Roof
Project M01415547 No Work · Approved · 06/25/2026
Project M01415551 No Work · Approved · 06/25/2026
Project M01320322 Alteration · Permit Entire · 12/02/2025
Project M01301125 Alteration · LOC Issued · 10/27/2025
Project M01301109 Alteration · LOC Issued · 10/24/2025
Project M01301152 Alteration · LOC Issued · 10/24/2025
Project M01301162 Alteration · Permit Entire · 10/24/2025
Edrington SpiritsOfficeFloor 4
Project M00528719 Alteration · LOC Issued · 06/29/2021
Project M00545299 Alteration · LOC Issued · 06/29/2021
Project M00514061 Alteration · LOC Issued · 06/24/2021
BettermentOfficeFloor 6, Roof
Project M00316291 Alteration · LOC Issued · 02/21/2020
Project M00316328 Alteration · LOC Issued · 02/21/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,255 on file (BIS + DOB NOW)
▸Plans & Drawings133
▸DOB NOWPlans/Sketch - Temporary Place of Assembly65
10/20/2026M01476371-I1Request digital key ↗
10/13/2026M01448309-I1Request digital key ↗
10/13/2026M01451568-I1Request digital key ↗
Showing 3 of 65 on file for this type
▸DOB NOWPlans/Sketch47
10/13/2026M01448319-I1Request digital key ↗
10/04/2026M01452708-I1Request digital key ↗
09/03/2026M00504929-I1Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/05/2026M00230275-I1Request digital key ↗
09/05/2026M00301695-I1Request digital key ↗
09/05/2026M00316291-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/05/2026M00239943-I1Request digital key ↗
09/05/2026M00230771-I1Request digital key ↗
09/05/2026M00316328-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00316328-I1Request digital key ↗
09/03/2026M00385254-I1Request digital key ↗
09/03/2026M00385254-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00231151-I1Request digital key ↗
09/05/2026M00271548-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00251082-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸Applications & Permits197
▸BISPLAN / WORK APPROVAL APPLICATION99
02/19/2026141029544Open ↗
01/29/2026141029474Open ↗
10/16/2025141028778Open ↗
Showing 3 of 99 on file for this type
▸DOB NOWLPC Approval/Permit49
09/05/2026M00271548-I1Open ↗
09/05/2026M00316291-I1Open ↗
09/05/2026M00316328-I1Open ↗
Showing 3 of 49 on file for this type
▸BISWORK PERMIT APPLICATION48
02/20/2026141029544Open ↗
01/30/2026141029474Open ↗
10/17/2025141028778Open ↗
Showing 3 of 48 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications384
▸DOB NOWDPL-1: Design Professional Seal & Signature131
10/20/2026M01476371-I1Open ↗
10/13/2026M01448309-I1Open ↗
10/13/2026M01451568-I1Open ↗
Showing 3 of 131 on file for this type
▸DOB NOWProgress Inspector Seal & Signature65
09/23/2026M01320322-S2Open ↗
09/23/2026M00504929-I1Open ↗
09/23/2026M01320322-S2Open ↗
Showing 3 of 65 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
09/29/2026M00385254-P1Open ↗
09/23/2026M01320322-S4Open ↗
09/23/2026M01320322-S2Open ↗
Showing 3 of 42 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT38
02/19/2026141029544Open ↗
01/29/2026141029474Open ↗
10/16/2025141028778Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION17
02/19/2026141029544Open ↗
01/29/2026141029474Open ↗
10/16/2025141028778Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY16
02/19/2026141029544Open ↗
01/29/2026141029474Open ↗
10/16/2025141028778Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS7
07/25/2023123181626Open ↗
07/25/2023123181626Open ↗
07/25/2023123181626Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
07/25/2023123181626Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
02/19/2025123335881Open ↗
Showing 1 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos81
▸DOB NOWDEP ACP-5: Asbestos Assessment Report57
09/05/2026M00239943-I1Open ↗
09/05/2026M00271548-I1Open ↗
09/05/2026M00316291-I1Open ↗
Showing 3 of 57 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026M00798556-I1Open ↗
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
08/22/2023123816898Open ↗
Showing 1 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
08/22/2023123816898Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
08/23/2023123816898Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/23/2023123816898Open ↗
Showing 1 of 2 on file for this type
▸BISLIGHTING CONTROLS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* DUCT LEAKAGE TESTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports62
▸BISTECHNICAL REPORT: RESPONSIBILITY36
01/29/2026141029474Open ↗
10/16/2025141028778Open ↗
05/17/2025141027378Open ↗
Showing 3 of 36 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)13
02/20/2026141029544Open ↗
01/30/2026141029474Open ↗
10/17/2025141028778Open ↗
Showing 3 of 13 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
01/10/2024123590499Open ↗
05/15/2023121437052Open ↗
Showing 2 of 3 on file for this type
▸BIS* WELDING 27-6162
07/20/2023102778166Open ↗
07/20/2023102778166Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-012
07/20/2023102778166Open ↗
07/20/2023102778166Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
07/20/2023102778166Open ↗
07/20/2023102778166Open ↗
▸BISMECHANICAL SYSTEMS2
01/10/2024123590499Open ↗
Showing 1 of 2 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
01/10/2024123590499Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/10/2024123590499Open ↗
▸Approvals, Objections & Sign-offs134
▸BISLANDMARKS APPROVAL35
02/19/2026141029544Open ↗
01/29/2026141029474Open ↗
10/16/2025141028778Open ↗
Showing 3 of 35 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
02/26/2026141029474Open ↗
02/20/2026141029474Open ↗
11/05/2025141028778Open ↗
Showing 3 of 33 on file for this type
▸BISLANDMARKS SIGNOFF20
02/26/2026141029474Open ↗
11/05/2025141028778Open ↗
05/19/2025141027378Open ↗
Showing 3 of 20 on file for this type
▸BISFINAL18
02/20/2026141029544Open ↗
02/20/2026141029474Open ↗
11/04/2025141028778Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
06/09/2025123590499Open ↗
03/26/2023123590499Open ↗
Showing 2 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/26/2023121437052Open ↗
Showing 1 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLandmark Approval2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership64
▸BISCOST AFFIDAVIT55
02/19/2026141029544Open ↗
01/29/2026141029474Open ↗
10/16/2025141028778Open ↗
Showing 3 of 55 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
02/20/2026141029474Open ↗
11/04/2025141028778Open ↗
05/16/2025141027378Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms69
▸BISEFILING COVER SHEET29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISADDITIONAL INFORMATION19
06/16/2025123590499Open ↗
06/16/2025123590499Open ↗
07/20/2023123181626Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET17
02/19/2026141029544Open ↗
01/29/2026141029474Open ↗
10/16/2025141028778Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents23
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSite Survey: Initial2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISUnknown1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type