Hospital, sanitarium, mental institution
NH LIJ ZH Hospital Campus
270-05 76 AVENUE · Glen Oaks-Floral Park-New Hyde Park · BIN 4439540
💬 Discuss this project
1959Year Built
9Stories
I1Building Class
R3-2Zoning
2,014,617 sfGross Floor Area
1Units
LL97 Covered18 Open Violations 16 unresolved · 2 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: LONG ISLAND JEWISH HOSPITAL · 1,306,800 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof8p · 7 filings · 18 docs
BulkheadUnder Construction1p · 1 filing · 6 docs
PenthouseUnder Construction2 filings · 14 docs
Floor 9Under Construction2 filings
Floor 8Under Construction2 filings
Floor 7Under Construction2 filings
Floor 6Under Construction2 filings
Floor 5Under Construction1p · 3 filings
Floor 4Under Construction4 filings
Floor 3Under Construction2p · 5 filings
Floor 214p · 7 filings · 20 docs
Floor 1Under Construction11p · 7 filings · 20 docs
CellarUnder Construction1p · 3 filings
Basement2p · 2 filings · 10 docs
Sub-BasementUnder Construction8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHWELL HEALTH9609/13/2026
KINGS GROUP NY1907/08/2026
LONG ISLAND JEWISH HOSPITAL2003/22/2026
LI JEWISH HOSPITAL103/22/2026
PLANT ENGINEERING & MAINT203/21/2026
NORTHWELL HEALTH SYSTEM103/21/2026
NORTHSHORE L I J HEALTH SYSTEM15503/21/2026
N SHORE LIJ HEALTH SYSTEM203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UPRIGHT EXPEDITERS6603/21/2026
CONSTRUCTION PERMIT SERVICES1003/21/2026
SKYLINE ACCESS103/21/2026
EMPIRE CITY CONSULTANTS, INC.1403/21/2026
STRELING ENGINEERING SERVICES P C203/21/2026
KMA DESIGNS LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor1407/08/2026
THE WHITING-TURNER CONTRAGeneral Contractor1207/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection1007/08/2026
GILBANE BUILDING COMPANYGeneral Contractor807/08/2026
ALLIANCE PLUMBING CORPPlumbing707/08/2026
BOTTO MECHANICAL CORPGeneral Contractor504/09/2026
SIRINA FIRE PROT CORPFire Protection408/26/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor407/30/2026
PLATINUM SPECIALTY SERVICGeneral Contractor407/08/2026
NYC FIRE SPRINKLER CORPFire Protection407/08/2026
PAR PLUMBING CO., INCPlumbing307/08/2026
JOSEPH BRAMANElectrical303/21/2026
CONSIGLI CONSTRUCTION COGeneral Contractor307/08/2026
EMPIRE GENERAL CONTRACTINGeneral Contractor307/08/2026
PREMIER MECHANICAL SERVICGeneral Contractor303/21/2026
MACCARONE PLUMBING INCPlumbing207/08/2026
CARRIER CORPGeneral Contractor203/21/2026
LORELLI, VINCENTElectrical203/21/2026
COMPARATO, LOUISElectrical203/21/2026
ALCHEMY DEVELOPMENTGeneral Contractor207/08/2026
SHORT, HENRYElectrical103/21/2026
HIGH QUALITY ELEC.OF NYCElectrical103/22/2026
HEMSING, ROBERTElectrical103/21/2026
MACCARONE PLUMBING INCFire Protection107/08/2026
S & P CONSTRUCTION MGMT.IElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SONI ENGINEERING CONSULTI9819106/03/2026
CC@A ENGINEERING P.C18544806/02/2026
NYMS CONSULTING, LLC8442102/12/2025
WAYPOINT CONSULTING GROUP6175310/26/2022
Building Lifecycle
All (300)Filed (45)Permit Issued (63)Signed Off (23)Facade (FISP) (3)Violation (13)Inspection (54)Objection (69)Special Inspection (30)
10/01/2026
Permit issued — Sprinklers
Q01372018-I1-EW-SP
08/25/2026
Permit issued — Sprinklers
Q01371982-I1-EW-SP
07/29/2026
Permit issued — General Construction
Q01371454-I1-GC
07/28/2026
Permit issued — General Construction
Q01371463-I1-GC
07/28/2026
Permit issued — General Construction
Q01371447-I1-GC
07/27/2026
Permit issued — General Construction
Q01371434-I1-GC
07/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2026
Permit issued — Plumbing
Q01397925-I1-PL
07/01/2026
Permit issued — Plumbing
Q01397925-I1-EW-SP
06/24/2026
Permit issued — Sprinklers
Q00893878-I1-EW-SP
06/24/2026
Permit issued — Standpipe
Q00893878-I1-EW-SD
06/24/2026
Permit issued — General Construction
Q01397604-I1-GC
06/24/2026
Permit issued — Structural
Q01397668-I1-ST
06/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/19/2026
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
06/19/2026
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
06/19/2026
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
06/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/15/2026
Permit issued — Suspended Scaffold
Q01409839-I1-SC
06/11/2026
Permit issued — Mechanical Systems
Q01397913-I1-MS
06/03/2026
Filed — Alteration
Installation of material hoist
Q01409839-I1
06/02/2026
Filed — Alteration
Q01397668-I1
06/01/2026
Filed — Alteration
Q01397925-I1
06/01/2026
Filed — Alteration
Northwell LIJ EP Lab # 1: modify existing Mechanical systems to conform with hospital program renovations as per plans filed herewith.
Q01397913-I1
06/01/2026
Filed — Alteration
Q01397604-I1
06/01/2026
Special inspection requirement — Post-installed Anchors
nayan soni
06/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
05/27/2026
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
05/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
CHAROULIS CHARALAMBOUS
05/27/2026
Special inspection requirement — Maintenance information
CHAROULIS CHARALAMBOUS
05/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
CHAROULIS CHARALAMBOUS
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
05/27/2026
Special inspection requirement — Shutoff dampers
CHAROULIS CHARALAMBOUS
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
CHAROULIS CHARALAMBOUS
05/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CHAROULIS CHARALAMBOUS
05/18/2026
Special inspection requirement — Structural Steel - Welding
CHAROULIS CHARALAMBOUS
05/18/2026
Special inspection requirement — Structural Steel - Details
CHAROULIS CHARALAMBOUS
05/18/2026
Special inspection requirement — Structural Steel - High Strength Bolting
CHAROULIS CHARALAMBOUS
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
05/12/2026
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
05/07/2026
Filed — Alteration
Q01371447-I1
05/06/2026
Special inspection requirement — Mechanical Systems
CHAROULIS CHARALAMBOUS
05/06/2026
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
05/06/2026
Special inspection requirement — Sprinkler Systems
CHAROULIS CHARALAMBOUS
05/05/2026
Special inspection requirement — Interior lighting power
CHAROULIS CHARALAMBOUS
05/05/2026
Special inspection requirement — Lighting controls
CHAROULIS CHARALAMBOUS
05/05/2026
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
05/05/2026
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
CHAROULIS CHARALAMBOUS
05/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Permit issued — Plumbing
Q01162581-I1-PL
04/27/2026
Filed — Alteration
Northwell LIJ Sprinkler Upgrade project - Research Wing: sprinkler upgrades throughout building, as per plans filed herewith.
Q01372794-I1
04/27/2026
Violation issued (ECB, closed)
Construction
04/24/2026
Filed — Alteration
Northwell LIJ Sprinkler Upgrade project - ECCC Wing: sprinkler upgrades throughout building, as per plans filed herewith.
Q01372018-I1
04/24/2026
Filed — Alteration
Northwell LIJ Sprinkler Upgrade project - Main Building: sprinkler upgrades throughout building, as per plans filed herewith.
Q01371982-I1
04/23/2026
Filed — Alteration
Northwell LIJ Medical Center Sprinkler Upgrade Project - Main Building: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indicated, as per plans filed herewith. No change to use, occupancy or egress.
Q01371434-I1
04/21/2026
Filed — Alteration
Northwell LIJ Sprinkler Project - Research Wing: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indicated, as per plans filed herewith. No change to use, occupancy or egress under this application.
Q01371454-I1
04/20/2026
Filed — Alteration
Northwell LIJ Sprinkler project - West Wing: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indicated, as per plans filed herewith. No change to use, occupancy or egress under this application.
Q01371463-I1
04/20/2026
Filed — Alteration
Northwell LIJ Sprinkler Upgrade project - West Wing: sprinkler upgrades throughout building, as per plans filed herewith.
Q01372753-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION INC10/01/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP08/25/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION07/29/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION07/28/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION07/28/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION07/27/2026
DOB NOWPlumbingPermit IssuedALLIANCE PLUMBING CORP07/02/2026
DOB NOWPlumbingPermit IssuedNYC FIRE SPRINKLER CORP07/01/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP06/24/2026
DOB NOWStandpipePermit IssuedABCO-PEERLESS SPRKLR CORP06/24/2026
DOB NOWGeneral ConstructionPermit IssuedTHE WHITING-TURNER CONTRA06/24/2026
DOB NOWStructuralPermit IssuedTHE WHITING-TURNER CONTRA06/24/2026
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC06/15/2026
DOB NOWMechanical SystemsPermit IssuedTHE WHITING-TURNER CONTRA06/11/2026
DOB NOWPlumbingSigned-offALLIANCE PLUMBING CORP04/28/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO03/12/2026
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP01/30/2026
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC01/22/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP01/21/2026
DOB NOWPlumbingSigned-offNYC FIRE SPRINKLER CORP12/10/2025
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE11/03/2025
DOB NOWSprinklersSigned-offMACCARONE PLUMBING INC09/22/2025
DOB NOWMechanical SystemsPermit IssuedBOTTO MECHANICAL CORP08/01/2025
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP07/29/2025
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP07/29/2025
DOB NOWStructuralSigned-offTHE WHITING-TURNER CONTRA07/28/2025
DOB NOWGeneral ConstructionSigned-offTHE WHITING-TURNER CONTRA07/21/2025
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE04/18/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP04/17/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP04/16/2025
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO04/14/2025
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO04/11/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING02/12/2025
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP02/03/2025
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP01/23/2025
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP11/22/2024
DOB NOWSprinklersSigned-offMACCARONE PLUMBING INC11/21/2024
DOB NOWMechanical SystemsSigned-offBOTTO MECHANICAL CORP11/20/2024
DOB NOWGeneral ConstructionSigned-offTHE WHITING-TURNER CONTRA11/13/2024
DOB NOWStructuralSigned-offTHE WHITING-TURNER CONTRA10/25/2024
+ 60 more permits on file
3 projects · most recent 06/26/2025
Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2025Permit IssuedBOTTO MECHANICAL CORPAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Above Air XPX-021S-1-AA-VF-1 6,000 CFM · Condensing Unit ×2
MCE-021S-3-00ER H-EC-00-UF3-2A 2,700 CFM · Crac Unit ×1
MCE-021S-3-00ER H-EC-00-UF3-2A 2,700 CFM · Crac Unit ×1
Ventilation
Carrier 39NC07 3,400 CFM · Rooftop Unit ×1
03/18/2025Permit IssuedCONSIGLI CONSTRUCTION COAir Conditioning Systems
Cooling
Mitsubishi Electric PUY-A30NHA7 (note this is a 2.5 ton unit) 2 tons · Condensing Unit ×2
PUY-A36NKA7 3 tons · Condensing Unit ×2
Liebert PDX018 5 tons · Crac Unit ×2
01/02/2020Signed-offCARRIER CORPAir Conditioning Systems
Cooling
Carrier 30RAP060 55 tons · Chiller ×1
30RB130 130 tons · Chiller ×1
7 projects · most recent 04/27/2026
FiledStatusContractorScope
04/27/2026——615 heads
04/24/2026Permit IssuedSIRINA FIRE PROT CORP2,153 heads
04/24/2026Permit IssuedCURRENT FIRE PROTECTION I—
04/20/2026——328 heads
01/29/2026Signed-offNYC FIRE SPRINKLER CORP24 heads
09/02/2025Permit IssuedABCO-PEERLESS SPRKLR CORP18 heads, 37 outlets
03/18/2025Signed-offSIRINA FIRE PROT CORP9 heads, 2 outlets
5 projects · most recent 01/29/2026
Water/Sanitary Medical Gas Gas
FiledStatusContractorScope
01/29/2026Signed-offMACCARONE PLUMBING INCMedical Gas, Water/Sanitary
09/02/2025Signed-offPAR PLUMBING CO., INCWater/Sanitary
03/18/2025Signed-offCARDOZA PLUMBING WMBEWater/Sanitary
10/30/2023Permit IssuedM & S MECHANICAL SVCS INCGas
05/02/2023Signed-offPAR PLUMBING CO., INCWater/Sanitary
25 projects · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026Permit IssuedNORTHWELL HEALTHCARE, INCGeneral Wiring
03/11/2026CompleteHATZEL AND BUEHLER, INCGeneral Wiring
03/10/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
03/13/2025CompleteHATZEL AND BUEHLER, INCGeneral Wiring
03/12/2025CompleteHATZEL AND BUEHLER, INCGeneral Wiring
01/22/2025CompleteDIANE ELECTRIC INC.General Wiring
10/17/2024CompleteHIGH QUALITY ELECTRIC OF—
07/22/2024CompleteE-J ELEC. INSTALLATION COGeneral Wiring
03/13/2024CompleteNORTHWELL HEALTHCARE, INC—
02/21/2024CompleteNORTHWELL HEALTHCARE, INC—
02/21/2024CompleteNORTHWELL HEALTHCARE, INC—
10/16/2023CompleteHATZEL AND BUEHLER, INCGeneral Wiring
07/07/2023Permit IssuedHATZEL AND BUEHLER, INCGeneral Wiring
01/10/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
08/30/2022Permit IssuedNEE ELECTRICAL, LLC—
1 project · most recent 02/03/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
02/03/2026Permit IssuedKINGS GROUP NY CORPScaffold, Sidewalk Shed
2 projects · most recent 06/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/03/2026Permit IssuedDNA CONTRACTING LLCSuspended Scaffold (SC)
01/14/2026Permit IssuedSKYLINE ACCESS LLC—
▾Field Inspections (DOB CAP) — 59
DateTypeResultReport
07/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/19/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
06/19/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
06/19/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
06/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/15/2025Certified Medical Gas - MG - PL - FinishCertifiedView ↗
10/15/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
10/15/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/16/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 59.
▾Special Inspection Requirements (DOB NOW) — 135
DateRequirementInspectorRole
06/01/2026Post-installed Anchorsnayan sonispecial
06/01/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
05/27/2026Maintenance informationCHAROULIS CHARALAMBOUSenergy_progress
05/27/2026HVAC-R and service water heating equipmentCHAROULIS CHARALAMBOUSenergy_progress
05/27/2026HVAC-R and service water piping design and insulationCHAROULIS CHARALAMBOUSenergy_progress
05/27/2026Shutoff dampersCHAROULIS CHARALAMBOUSenergy_progress
05/27/2026Energy Code Compliance InspectionsCHAROULIS CHARALAMBOUSprogress
05/27/2026Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
05/27/2026HVAC-R and service water heating system controlsCHAROULIS CHARALAMBOUSenergy_progress
05/27/2026Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
05/18/2026Structural Steel - DetailsCHAROULIS CHARALAMBOUSspecial
05/18/2026Structural Steel - High Strength BoltingCHAROULIS CHARALAMBOUSspecial
05/18/2026Structural Steel - WeldingCHAROULIS CHARALAMBOUSspecial
05/12/2026Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
05/12/2026Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
05/12/2026Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
05/06/2026FinalCHAROULIS CHARALAMBOUSprogress
05/06/2026Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
05/06/2026Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
05/05/2026Lighting controlsCHAROULIS CHARALAMBOUSenergy_progress
05/05/2026Energy Code Compliance InspectionsCHAROULIS CHARALAMBOUSprogress
05/05/2026FinalCHAROULIS CHARALAMBOUSprogress
05/05/2026FinalCHAROULIS CHARALAMBOUSprogress
05/05/2026Interior lighting powerCHAROULIS CHARALAMBOUSenergy_progress
04/08/2026Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
Latest 25 of 135.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Long Island Jewish Medical CenterMedical / HealthcareFloors 1, 2
Project Q01397668 Alteration · Permit Entire · 06/02/2026
Project Q01397604 Alteration · Permit Entire · 06/01/2026
Northwell HealthMedical / HealthcareSub-basement, Basement, Ground, Floors 1, 2
Project Q01372794 Alteration · Approved · 04/27/2026
Project Q01162581 Alteration · Permit Entire · 03/18/2025
Project Q00917732 Alteration · LOC Issued · 08/31/2023
Project Q00919163 Alteration · Permit Entire · 08/15/2023
Project Q00874244 Alteration · LOC Issued · 08/10/2023
Project Q00837129 Alteration · LOC Issued · 03/16/2023
Project Q00840003 Alteration · LOC Issued · 03/15/2023
Northwell | W Health" | SM | LONG ISLAND JEWISH MEDICAL | CENTERMedical / HealthcareFloor 2, Roof
Project Q01372018 Alteration · Approved · 04/24/2026
Project Q01372753 Alteration · Approved · 04/20/2026
Project Q01219392 Alteration · Permit Entire · 06/26/2025
Project Q01219230 Alteration · LOC Issued · 06/25/2025
Project Q01121439 Alteration · LOC Issued · 10/17/2024
Project Q01121555 Alteration · LOC Issued · 10/17/2024
Northwell LIJ HospitalMedical / HealthcareFloor 1
Project Q00833222 Alteration · LOC Issued · 04/26/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,735 on file (BIS + DOB NOW)
▸Plans & Drawings66
▸DOB NOWPlans/Sketch65
08/29/2026Q01371454-I1Request digital key ↗
08/29/2026Q01371982-I1Request digital key ↗
08/29/2026Q01372018-I1Request digital key ↗
Showing 3 of 65 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits351
▸BISWORK PERMIT APPLICATION210
05/17/2019421661151Open ↗
05/17/2019421661151Open ↗
01/09/2019421675217Open ↗
Showing 3 of 210 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION134
05/04/2019421675217Open ↗
01/26/2019421675217Open ↗
01/26/2019421675217Open ↗
Showing 3 of 134 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISIntent to Revoke Approval/Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAmended Application Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications453
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION200
05/20/2019421675217Open ↗
05/20/2019421675217Open ↗
05/20/2019421675217Open ↗
Showing 3 of 200 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature74
09/23/2026Q00872135-P1Open ↗
09/23/2026Q00872135-P1Open ↗
09/23/2026Q01219392-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature64
08/29/2026Q01371454-I1Open ↗
08/29/2026Q01371982-I1Open ↗
08/29/2026Q01372018-I1Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWProgress Inspector Seal & Signature55
09/23/2026Q01219392-I1Open ↗
09/23/2026Q01219392-I1Open ↗
09/01/2026Q08031806-I1Open ↗
Showing 3 of 55 on file for this type
▸BISPC FULL REPORT25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/15/2015440255180Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/15/2015440255180Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/15/2015440255180Open ↗
▸Trade Schedules & Equipment208
▸BISSELF-CERT PLUMBING NOTICE103
04/17/2015410094124Open ↗
04/17/2015410064709Open ↗
03/26/2015410064709Open ↗
Showing 3 of 103 on file for this type
▸BISSCHEDULE B - PLUMBING30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8527
03/26/2015410094124Open ↗
03/26/2015410064709Open ↗
12/13/2014410124618Open ↗
Showing 3 of 27 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA20
10/31/2018421408532Open ↗
10/02/2014420841245Open ↗
Showing 2 of 20 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
07/19/2014420841450Open ↗
Showing 1 of 8 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/26/2019421675217Open ↗
11/19/2018421675217Open ↗
03/02/2018421515319Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
07/19/2014420841450Open ↗
Showing 1 of 3 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFDNY: Letter of No Objection1
08/29/2026Q01371982-I1Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos122
▸DOB NOWDEP ACP-5: Asbestos Assessment Report49
08/29/2026Q01371454-I1Open ↗
08/29/2026Q01371982-I1Open ↗
08/29/2026Q01372018-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
01/09/2019421408532Open ↗
11/07/2018421675217Open ↗
09/05/2018421661151Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/24/2026Q00870072-I1Open ↗
08/24/2026Q00874244-I1Open ↗
08/24/2026Q00872019-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/13/2020421675431Open ↗
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
05/20/2019421675217Open ↗
01/26/2019421675217Open ↗
11/07/2018421675217Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
05/20/2019421675217Open ↗
07/10/2018421515319Open ↗
07/11/2014420841450Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/15/2015440255180Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/15/2015440255180Open ↗
▸BISNYCECC ANALYSIS1
10/15/2015440255180Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: SOIL INSPECTION2
05/25/2018421515319Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/15/2015440255180Open ↗
▸Approvals, Objections & Sign-offs244
▸BISADMINISTRATIVE OBJECTIONS66
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 66 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter66
08/29/2026Q01371454-I1Open ↗
08/29/2026Q01371982-I1Open ↗
08/29/2026Q01372018-I1Open ↗
Showing 3 of 66 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION54
09/12/2014420345228Open ↗
Showing 1 of 54 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST54
07/13/2020421675431Open ↗
05/20/2019421675217Open ↗
01/09/2019421408532Open ↗
Showing 3 of 54 on file for this type
▸BISSUPERSEDING LETTER3
05/17/2019421661151Open ↗
05/17/2019421661151Open ↗
02/03/2015410094124Open ↗
▸BISMEDICAL GAS INST CERT : LETTER-MED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership121
▸BISCOST AFFIDAVIT119
05/20/2019421675217Open ↗
01/26/2019421675217Open ↗
01/26/2019421675431Open ↗
Showing 3 of 119 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
07/06/2017421408532Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/29/2020421675431Open ↗
▸Filing & Intake Forms122
▸BISEFILING COVER SHEET72
01/26/2019421675217Open ↗
01/26/2019421675217Open ↗
01/26/2019421675217Open ↗
Showing 3 of 72 on file for this type
▸BISADDITIONAL INFORMATION38
03/09/2018421515319Open ↗
03/09/2018421515319Open ↗
06/20/2015410124618Open ↗
Showing 3 of 38 on file for this type
▸BISBOROUGH INTAKE FORM7
01/09/2019421408532Open ↗
01/09/2019421408532Open ↗
03/02/2018421515319Open ↗
Showing 3 of 7 on file for this type
▸BISeFiling Job Application Cover Sheet5
10/15/2015440255180Open ↗
Showing 1 of 5 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/13/2020421675431Open ↗
Showing 1 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
02/03/2015410064709Open ↗
▸BISSITE CONNECTION: DEP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type