Shopping center, with or without parking
Nat Grid Place Holder
2720 HYLAN BOULEVARD · BIN 5107589
💬 Discuss this project
1970Year Built
1Stories
K6Building Class
C4-1Zoning
103,868 sfGross Floor Area
23Units
0 Active ViolationsFDNY Report ↗
Shopping center, with or without parking · Owner of record: Park Tysen Associates · 481,387 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHappy Feet, Jessica Lin PB Staten IslandUnder Construction16p · 5 filings · 20 docs
Floor 5Paris Baguette, Sally Beauty6p · 4 filings · 12 docs
Floor 4Paris Baguette, Sally Beauty6p · 4 filings · 12 docs
Floor 3Paris Baguette, Sally Beauty6p · 4 filings · 12 docs
Floor 2Paris Baguette, Sally Beauty6p · 4 filings · 12 docs
Floor 1Happy Feet, The UPS Store +4Under Construction111p · 14 filings · 20 docs
Site & exteriorHappy Feet, Allure Salon +2Under Construction12p · 10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Tysen Associates19607/08/2026
Pizza Hut203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec2603/21/2026
Louis Striar1203/21/2026
Tambok Studio403/21/2026
AE Design Solution203/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Retail Project MangementScaffold907/08/2026
Active SignsSign hanger609/17/2026
Gemstar ConstructionScaffold607/08/2026
Manengeering BureauFire Protection607/08/2026
Signore & Sons PlumbingPlumbing507/08/2026
L&L Construction DevelopmentGeneral Contractor407/08/2026
Balaton ConsultingSign hanger307/08/2026
Yilin ConstructionGeneral Contractor303/21/2026
Noor Mechanical Servicesspecialty_contractor207/08/2026
Pine Street CarpentersGeneral Contractor206/28/2026
Cas EquipmentGeneral Contractor204/09/2026
Segismundo CastellarGeneral Contractor204/09/2026
W.J. Northridge ConstructionGeneral Contractor203/21/2026
Jayeff ConstructionGeneral Contractor207/08/2026
Ridge ElectricElectrical203/22/2026
Village P & H NYPlumbing107/08/2026
Infiniti ElectricElectrical103/21/2026
Willdan Electrical of NYElectrical103/22/2026
North Shore Neon Signspecialty_contractor107/08/2026
Segismundo CastellarGeneral Contractor103/21/2026
A1 SpecializedSign hanger107/08/2026
Capital Contracting P&HPlumbing107/08/2026
MPC Plumbing & HeatingPlumbing107/08/2026
QMB Plumbing & HeatingPlumbing107/08/2026
Infiniti ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S7010204/13/2026
Socotec Engineering4983801/14/2026
A Tech Engineering NYC, P6738211/10/2025
David Katz, P.E6087411/06/2025
Flushing Engineering Service4373809/20/2023
Building Lifecycle
All (220)Filed (49)Permit Issued (47)Signed Off (28)Violation (13)Inspection (29)Objection (24)Special Inspection (30)
09/16/2026
Permit issued — Sign
S01433449-I1-SG
08/19/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - HAPPY FEET. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01433449-I1
08/19/2026
Special inspection requirement — Final
LEON SKVIRSKY
07/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2026
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES ON 2722 HYLAN BOULEVARD, ALLURE SALON. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01283392-S1
05/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/12/2026
Permit issued — Sprinklers
S01381314-S1-EW-SP
05/05/2026
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES ON 2722 HYLAN BOULEVARD, ALLURE SALON. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01283392-I1
04/24/2026
Permit issued — Sprinklers
S01381314-S1-EW-SP
04/22/2026
Permit issued — Mechanical Systems
S01381314-I1-GC
04/22/2026
Permit issued — Mechanical Systems
S01381314-I1-MS
04/21/2026
Permit issued — Sprinklers
S01381314-S1-PL
04/13/2026
Filed — Alteration
PROPOSED NON-STRUCTURAL INTERIOR RENOVATION WORK FOR A SALON NAMED "HAPPY FEET" ON 1ST FLOOR. NEW PARTITION, DOOR, FLOORING, CEILING AND MECHANICAL WORK AS PER PLAN. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
S01381314-S1
04/13/2026
Filed — Alteration
PROPOSED NON-STRUCTURAL INTERIOR RENOVATION WORK FOR A SALON NAMED "HAPPY FEET" ON 1ST FLOOR. NEW PARTITION, DOOR, FLOORING, CEILING AND MECHANICAL WORK AS PER PLAN. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
S01381314-I1
04/03/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES ON 2722 HYLAN BOULEVARD, ALLURE SALON. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01283392-P3
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
04/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
03/31/2026
Special inspection requirement — Sprinkler Systems
XIUCHENG LI
03/19/2026
Signed off — Alteration
Modification to existing ductwork to accommodate new tenant build out 'Allure Salon". Existing rooftop HVAC unit to remain.
S01279701-I1
03/06/2026
Objection resolved — Resolved
03/06/2026
Objection resolved — Resolved
03/05/2026
Special inspection requirement — Maintenance information
anthony santoro
03/05/2026
Special inspection requirement — Lighting controls
anthony santoro
03/05/2026
Special inspection requirement — Final
anthony santoro
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/05/2026
Special inspection requirement — Interior lighting power
anthony santoro
03/04/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES ON 2722 HYLAN BOULEVARD, ALLURE SALON. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01283392-P1
03/04/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES ON 2722 HYLAN BOULEVARD, ALLURE SALON. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01283392-P2
03/03/2026
Special inspection requirement — Maintenance information
anthony santoro
03/03/2026
Special inspection requirement — Lighting controls
anthony santoro
03/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/03/2026
Special inspection requirement — Final
anthony santoro
03/03/2026
Special inspection requirement — Interior lighting power
anthony santoro
03/03/2026
Special inspection requirement — Maintenance information
anthony santoro
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Cost
02/12/2026
Objection raised — Fire_Protection
02/10/2026
Filed — Alteration
S01356980-I1
02/10/2026
Filed — Alteration
S01356980-S1
02/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/08/2026
Special inspection requirement — Energy Code Compliance Inspections
02/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/08/2026
Special inspection requirement — Sprinkler Systems
02/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/07/2026
Special inspection requirement — Energy Code Compliance Inspections
02/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
Latest 60 of 220 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedActive Signs09/16/2026
DOB NOWSprinklersPermit IssuedManengeering Bureau05/12/2026
DOB NOWSprinklersPermit IssuedManengeering Bureau04/24/2026
DOB NOWMechanical SystemsPermit IssuedNoor Mechanical Services04/22/2026
DOB NOWMechanical SystemsPermit IssuedNoor Mechanical Services04/22/2026
DOB NOWPlumbingPermit IssuedQMB Plumbing & Heating04/21/2026
DOB NOWMechanical SystemsSigned-offCas Equipment01/06/2026
DOB NOWPlumbingPermit IssuedMPC Plumbing & Heating12/15/2025
DOB NOWMechanical SystemsPermit IssuedPine Street Carpenters11/19/2025
DOB NOWGeneral ConstructionPermit IssuedPine Street Carpenters11/19/2025
DOB NOWSprinklersSigned-offManengeering Bureau11/17/2025
DOB NOWPlumbingSigned-offSignore & Sons Plumbing11/03/2025
DOB NOWMechanical SystemsSigned-offSegismundo Castellar10/24/2025
DOB NOWGeneral ConstructionSigned-offSegismundo Castellar09/18/2025
DOB NOWSignSigned-offActive Signs09/15/2025
DOB NOWSprinklersSigned-offManengeering Bureau09/03/2025
DOB NOWGeneral ConstructionSigned-offJayeff Construction07/03/2025
DOB NOWMechanical SystemsSigned-offJayeff Construction07/03/2025
DOB NOWMechanical SystemsSigned-offCas Equipment06/23/2025
DOB NOWSignSigned-offActive Signs06/16/2025
DOB NOWPlumbingSigned-offCapital Contracting P&H04/16/2025
DOB NOWSprinklersSigned-offManengeering Bureau04/02/2025
DOB NOWGeneral ConstructionSigned-offW.J. Northridge Construction03/10/2025
DOB NOWConstruction FenceSigned-offGemstar Construction03/19/2024
DOB NOWGeneral ConstructionSigned-offNorth Shore Neon Sign10/13/2023
DOB NOWSignSigned-offNorth Shore Neon Sign Co10/11/2023
DOB NOWSignSigned-offNorth Shore Neon Sign Co10/11/2023
DOB NOWSignSigned-offNorth Shore Neon Sign Co10/11/2023
DOB NOWConstruction FenceSigned-offGemstar Construction08/31/2023
DOB NOWSignSigned-offActive Signs07/22/2023
DOB NOWSignSigned-offActive Signs07/22/2023
DOB NOWConstruction FenceSigned-offGemstar Construction05/25/2023
DOB NOWMechanical SystemsSigned-offL&L Construction Development05/08/2023
DOB NOWPlumbingSigned-offVillage P & H NY05/08/2023
DOB NOWGeneral ConstructionSigned-offL&L Construction Development05/05/2023
DOB NOWSprinklersSigned-offManengeering Bureau05/04/2023
DOB NOWConstruction FenceSigned-offGemstar Construction06/16/2022
DOB NOWSignSigned-offActive Signs02/16/2022
DOB NOWMechanical SystemsSigned-offYilin Construction07/10/2020
DOB NOWConstruction FenceSigned-offRetail Project Mangement05/13/2020
+ 51 more permits on file
1 project · most recent 04/13/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/13/2026Permit IssuedNoor Mechanical ServicesVentilation Systems
Ventilation
Captiveaire DU50HFA 660 CFM · Kitchen Exhaust ×1
3 projects · most recent 04/13/2026
Sprinkler System
FiledStatusContractorScope
04/13/2026Permit IssuedManengeering BureauSprinkler System
08/10/2025——24 heads
09/28/2023———
4 projects · most recent 04/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/13/2026Permit IssuedQMB Plumbing & HeatingGas, Water/Sanitary
04/03/2026Signed-offSignore & Sons PlumbingGas, Water/Sanitary
11/10/2025Permit IssuedMPC Plumbing & HeatingWater/Sanitary
08/10/2025———
19 projects · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026Permit IssuedRidge Electric—
04/23/2026Permit IssuedKJK ElectricGeneral Wiring
10/02/2025Permit IssuedInfiniti ElectricGeneral Wiring
08/27/2025Permit IssuedD.R.P. Electrical Contracting9 meters, 1 new_meters
08/14/2025CompleteRidge Electric—
07/09/2025CompleteM F Electrical Service CoGeneral Wiring
05/31/2025CompleteD.R.P. Electrical ContractingGeneral Wiring
05/28/2025CompleteD.R.P. Electrical ContractingGeneral Wiring
04/22/2024CompleteCity Electrical Sign Erectors—
04/22/2024CompleteCity Electrical Sign Erectors—
04/22/2024CompleteCity Electrical Sign Erectors—
04/22/2024CompleteCity Electrical Sign Erectors—
04/22/2024CompleteCity Electrical Sign Erectors—
10/31/2023CompletePlaza Electrical ContractorsGeneral Wiring
09/07/2023CompleteRidge Electric—
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
07/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/12/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
05/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 138
DateRequirementInspectorRole
08/19/2026FinalLEON SKVIRSKYprogress
04/01/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
04/01/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
04/01/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
03/31/2026Sprinkler SystemsXIUCHENG LIspecial
03/05/2026Maintenance informationanthony santoroenergy_progress
03/05/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/05/2026Finalanthony santoroprogress
03/05/2026Lighting controlsanthony santoroenergy_progress
03/05/2026Interior lighting poweranthony santoroenergy_progress
03/03/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/03/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/03/2026Lighting controlsanthony santoroenergy_progress
03/03/2026Maintenance informationanthony santoroenergy_progress
03/03/2026Finalanthony santoroprogress
03/03/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/03/2026Interior lighting poweranthony santoroenergy_progress
03/03/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
03/03/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
03/03/2026Maintenance informationanthony santoroenergy_progress
02/08/2026Energy Code Compliance Inspections—progress
02/08/2026Sprinkler Systems—special
02/08/2026Fire-Resistant Penetrations and Joints—special
02/08/2026HVAC-R and service water piping design and insulation—energy_progress
02/07/2026Energy Code Compliance Inspections—progress
Latest 25 of 138.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Happy FeetRetailFloor 1, Roof
Project S01433449 Alteration · Permit Entire · 08/19/2026
Project S01381314 Alteration · Permit Entire · 04/13/2026
Project S01356980 Alteration · Objections · 02/10/2026
The UPS StoreRetailFloor 1
Project S01284572 Alteration · Permit Entire · 11/07/2025
SnipesRetailFloor 1
Project S01279991 Alteration · LOC Issued · 09/02/2025
Project S01226642 Alteration · LOC Issued · 05/29/2025
Project S01195382 Alteration · LOC Issued · 03/25/2025
Allure SalonPersonal services—
Project S01273372 Alteration · LOC Issued · 08/26/2025
Wendy'sRestaurant / Food ServiceFloor 1
Project S00927690 Alteration · LOC Issued · 10/11/2023
Project S00927762 Alteration · LOC Issued · 10/11/2023
Project S00897871 Alteration · Filing Withdrawn · 09/28/2023
Project S00691229 Alteration · LOC Issued · 04/01/2022
Paris BaguetteRestaurant / Food ServiceFloors 1–5
Project S00871397 Alteration · LOC Issued · 05/16/2023
Project S00871398 Alteration · LOC Issued · 05/16/2023
Jessica Lin PB Staten IslandRestaurant / Food ServiceFloor 1
Project S00863036 Alteration · LOC Issued · 04/20/2023
Sally BeautyRetailFloors 1–5
Project S00026340 Alteration · LOC Issued · 03/26/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 684 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch48
08/26/2026S00009136-I1Request digital key ↗
08/26/2026S00026340-I1Request digital key ↗
08/24/2026S00656915-I1Request digital key ↗
Showing 3 of 48 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00368280-I1Request digital key ↗
▸Applications & Permits99
▸BISPLAN / WORK APPROVAL APPLICATION61
02/18/2026520277361Open ↗
02/13/2025520277361Open ↗
02/03/2025510047389Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION35
11/20/2023520277361Open ↗
08/28/2023520277361Open ↗
07/31/2023520277361Open ↗
Showing 3 of 35 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISA STATE POLLUTANT DISCHARGE ELIMINATIONSYSTEM_(SPEDS PERMIT)1
05/19/2023520277361Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/11/2018520327824Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/12/2023520277361Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/24/2023520277361Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/14/2025520277361Open ↗
▸BISZONING DIAGRAM1
06/20/2023520277361Open ↗
▸Seals & Professional Certifications180
▸DOB NOWProgress Inspector Seal & Signature56
10/09/2026S01226642-I1Open ↗
10/09/2026S01226642-I1Open ↗
09/27/2026S01283392-P2Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
08/24/2026S00656915-I1Open ↗
08/22/2026S00863036-P4Open ↗
08/22/2026S00863036-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
01/07/2019520128415Open ↗
12/18/2018520128415Open ↗
10/10/2018520277361Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
10/09/2026S01226642-I1Open ↗
10/08/2026S00863036-P4Open ↗
10/08/2026S00863036-P4Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment54
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING14
02/18/2026520277361Open ↗
12/13/2024520277361Open ↗
12/11/2024520277361Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
02/04/2019520128415Open ↗
Showing 1 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS5
02/04/2019520128415Open ↗
Showing 1 of 5 on file for this type
▸BISSEWER CUT-OFF4
05/11/2018520327824Open ↗
05/11/2018520327824Open ↗
05/11/2018520327824Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/26/2018520277361Open ↗
Showing 1 of 3 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/12/2025520277361Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/10/2025520277361Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/10/2025520277361Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
05/11/2018520327824Open ↗
05/11/2018520327824Open ↗
05/11/2018520327824Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos47
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
08/22/2026S00863036-I1Open ↗
08/22/2026S00863036-P1Open ↗
08/22/2026S00863036-S1Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/11/2018520327824Open ↗
Showing 1 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
01/07/2019520128415Open ↗
10/10/2018520277361Open ↗
10/10/2018520277361Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
05/12/2023520277361Open ↗
05/12/2023520277361Open ↗
03/10/2023520277361Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
01/12/2025520277361Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/12/2025520277361Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY10
05/12/2023520277361Open ↗
05/12/2023520277361Open ↗
03/10/2023520277361Open ↗
Showing 3 of 10 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
01/12/2025520277361Open ↗
07/14/2023520277361Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/27/2025520277361Open ↗
01/27/2025520277361Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/12/2025520277361Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/12/2025520277361Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/12/2025520277361Open ↗
▸Approvals, Objections & Sign-offs72
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
02/04/2019520128415Open ↗
01/16/2019520128415Open ↗
01/07/2019520128415Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
01/27/2025520277361Open ↗
12/17/2024520277361Open ↗
12/16/2024520277361Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
02/13/2025520277361Open ↗
01/28/2025520277361Open ↗
06/20/2023520277361Open ↗
Showing 3 of 13 on file for this type
▸BISLANDMARKS APPROVAL1
05/11/2018520327824Open ↗
▸BISBSA/CPC APPROVAL1
03/10/2023520277361Open ↗
▸Cost, Insurance & Ownership32
▸BISCOST AFFIDAVIT32
01/07/2019520128415Open ↗
Showing 1 of 32 on file for this type
▸Filing & Intake Forms47
▸BISADDITIONAL INFORMATION19
02/25/2026520277361Open ↗
02/14/2025520277361Open ↗
02/14/2025520277361Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET19
08/21/2018520277361Open ↗
08/01/2018520353359Open ↗
Showing 2 of 19 on file for this type
▸BISBOROUGH INTAKE FORM6
11/20/2023520277361Open ↗
07/28/2023520277361Open ↗
01/16/2019520128415Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLOT DIAGRAM2
04/29/2022520277361Open ↗
10/10/2018520277361Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/12/2025520277361Open ↗
▸BISMAINTENANCE INFORMATION1
01/12/2025520277361Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
01/12/2025520277361Open ↗
▸BISBPP: FILING REQUIRED1
05/19/2023520277361Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
01/12/2025520277361Open ↗