277 HICKS STREET
BROOKLYN · BIN 3002370
💬 Discuss this project
1960Year Built
5Stories
C6Building Class
R6Zoning
24,925 sfGross Floor Area
18Units
Rent Stabilized7 Open Violations ▸
Walk-up cooperative · Owner of record: STCHARLES HOUSING CORP · 6,750 sf lot · 3.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 2 filings · 7 docs
Floor 44p · 1 filing · 11 docs
Floor 3
Floor 21p · 1 filing · 11 docs
Floor 12p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HSC MANAGEMENT3509/10/2026
STCHARLES HOUSING CORP103/22/2026
ST CHARLES HOUSING2503/22/2026
AUROUS CONSTRUCTION COLLABORATIVE C103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEMS INSTAL S&SGeneral Contractor507/08/2026
CROSSFIELD PLBG.&HTGPlumbing407/08/2026
JEPOL CONSTRUCTION INCGeneral Contractor409/10/2026
WINTER WOLF CORPGeneral Contractor303/21/2026
MR. AIR NYC CORPGeneral Contractor303/21/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor307/02/2026
A&H EXPRESS PLBG&HTG CORPPlumbing307/08/2026
WF PLUMBING AND HEATING LPlumbing207/08/2026
MUJKO RENOVATION LLCGeneral Contractor104/09/2026
AUROUS CONSTRUCTION COLL*General Contractor104/09/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
QUICKSILVER FOX LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT230109/03/2025
BERTOLINI ARCHITECUTRAL W6488104/22/2025
EP INSPECTIONS AND COMMIS7079104/22/2025
CL ENGINEERING P.C.6781107/26/2022
VICTOR SCHWARTZ ARCHITECT1714103/25/2022
Building Lifecycle
All (143)Filed (18)Permit Issued (19)Signed Off (8)Violation (36)Inspection (9)Objection (30)Special Inspection (23)
09/09/2026
Permit issued — General Construction
B01151599-I1-GC-CX
04/13/2026
Permit issued — Protection and Mechanical Methods
B01316424-I1-PMM
02/27/2026
Signed off — Alteration
Renovation of apartment # #4D on the fourth floor. Work includes non-structural demolition and general construction as per plans file herewith. No change in use, egress or occupancy.
B01240313-S1
02/26/2026
Signed off — Alteration
Renovation of apartment # #4D on the fourth floor. Work includes non-structural demolition and general construction as per plans file herewith. No change in use, egress or occupancy.
B01240313-I1
01/27/2026
Permit issued — Sidewalk Shed
B01252168-I1-SH
01/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/15/2026
Permit issued — Supported Scaffold
B01252386-I1-SF
12/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/18/2025
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01316424-I1
12/18/2025
Permit issued — Protection and Mechanical Methods
B01316424-I1-PMM
12/10/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01252386-P1
12/08/2025
Signed off — Alteration
Removal and capping of 3 radiators; replacement of sink and dishwasher
B01254414-S1
11/24/2025
Permit issued — Suspended Scaffold
B01259290-I1-SC
11/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2025
Objection resolved — Addressed
11/19/2025
Objection raised — Structural
11/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/10/2025
Objection resolved — Addressed
11/03/2025
Signed off — Alteration
Removal and capping of 3 radiators; replacement of sink and dishwasher
B01254414-I1
10/23/2025
Objection raised — Scope
10/12/2025
Filed — Alteration
FACADE RESTORATION & INSPECTION
B01259290-I1
10/07/2025
Permit issued — Plumbing
B01240313-S1-PL
10/06/2025
Permit issued — General Construction
B01240313-I1-GC
10/02/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01252168-P1
10/01/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
09/25/2025
Permit issued — Plumbing
B01254414-S1-PL
09/19/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/17/2025
Objection raised — Plumbing
09/17/2025
Objection raised — Admin
09/17/2025
Objection raised — Admin
09/17/2025
Objection raised — Inspections
09/15/2025
Permit issued — General Construction
B01151599-I1-GC-CX
09/03/2025
Filed — Alteration
Renovation of apartment # #4D on the fourth floor. Work includes non-structural demolition and general construction as per plans file herewith. No change in use, egress or occupancy.
B01240313-S1
09/03/2025
Filed — Alteration
Renovation of apartment # #4D on the fourth floor. Work includes non-structural demolition and general construction as per plans file herewith. No change in use, egress or occupancy.
B01240313-I1
08/28/2025
Permit issued — General Construction
B01254414-I1-GC
08/09/2025
Objection resolved — Addressed
08/07/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01252168-I1
08/07/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01252386-I1
08/07/2025
Permit issued — Sidewalk Shed
B01252168-I1-SH
08/07/2025
Permit issued — Supported Scaffold
B01252386-I1-SF
08/06/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
08/01/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Other
07/30/2025
Objection raised — Other
07/30/2025
Objection raised — Other
07/30/2025
Objection raised — Cost
07/18/2025
Filed — Alteration
Removal and capping of 3 radiators; replacement of sink and dishwasher
B01254414-S1
07/18/2025
Filed — Alteration
Removal and capping of 3 radiators; replacement of sink and dishwasher
B01254414-I1
05/09/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
04/30/2025
Objection raised — Structural
04/30/2025
Objection raised — Scope
04/30/2025
Objection raised — Inspections
04/22/2025
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, PARAPET RECONSTRUCTION, TERRA COTTA REPLACEMENT, ROOF REPLACEMENT AND MISC. REPAIRS AS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
B01151599-I1
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJEPOL CONSTRUCTION INC09/09/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEM CONSTRUCTION04/13/2026
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM CONSTRUCTION01/27/2026
DOB NOWSupported ScaffoldPermit IssuedINTERSYSTEM CONSTRUCTION01/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEMS INSTAL S&S12/18/2025
DOB NOWSuspended ScaffoldPermit IssuedHUDSON MERIDIAN CONST GP11/24/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG10/07/2025
DOB NOWGeneral ConstructionSigned-offAUROUS CONSTRUCTION COLL*10/06/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP09/25/2025
DOB NOWGeneral ConstructionPermit IssuedHUDSON MERIDIAN CONST GP09/15/2025
DOB NOWGeneral ConstructionSigned-offMUJKO RENOVATION LLC08/28/2025
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S08/07/2025
DOB NOWSupported ScaffoldPermit IssuedINTERSYSTEMS INSTAL S&S08/07/2025
DOB NOWPlumbingSigned-offWF PLUMBING AND HEATING L11/30/2023
DOB NOWGeneral ConstructionSigned-offQUICKSILVER FOX LLC10/12/2022
DOB NOWPlumbingSigned-offWF PLUMBING AND HEATING L09/26/2022
DOB NOWMechanical SystemsSigned-offMR. AIR NYC CORP08/01/2022
DOB NOWMechanical SystemsSigned-offWINTER WOLF CORP04/15/2022
DOB NOWSupported ScaffoldPermit IssuedHUDSON MERIDIAN CONST GP12/01/2020
BISOTISSUEDJEPOL CONSTRUCTION INC08/03/2020
BISOTISSUEDJEPOL CONSTRUCTION INC07/30/2020
BISPLISSUEDTRI STATE PLBG & HTG INC07/11/2018
BISOTISSUEDCSC RENO LLC06/26/2018
BISPLISSUEDPREMIER PIPE SOLUTIONS06/21/2016
BISOTISSUEDLEARDON BOILER WORKS INC05/13/2015
BISPLISSUEDPREMIER PIPE SOLUTIONS08/30/2013
BISBLISSUEDPREMIER PIPE SOLUTIONS08/30/2013
BISPLISSUEDWASSERMAN-TRIEFLER P & H04/01/2013
BISPLISSUEDHENRY MYERS P & H, INC10/17/2012
BISOTISSUEDTEAMWORK RESTORATION INC05/08/2012
BISEQISSUEDROCK SCAFFOLDING CORP03/27/2012
BISOTISSUEDTEAMWORK RESTORATION INC03/21/2012
BISPLISSUEDSTP PLUMBING & HEATING INC05/11/2007
BISOTISSUEDKLEEN CONSTRUCTION LLC05/02/2007
BISOTISSUEDKLEEN CONSTRUCTION LLC05/02/2007
BISEQISSUEDSTEEL INDUSTRIES, INC05/31/2006
BISOTISSUEDDIMENSION CONTRACTING05/25/2006
BISOTISSUEDFIVE BORO GNRL CONTRNG CO10/04/2005
BISOTISSUEDFIVE BORO GNRL CONTRNG CO02/08/2005
BISOTISSUEDSAB CONST CO03/08/2004
+ 5 more permits on file
5 projects · most recent 10/09/2025
General Wiring
FiledStatusContractorScope
10/09/2025CompleteINTELOGIC ELECTRIC, INC.—
09/24/2025Permit IssuedAURORA ELECL CONTG INC—
09/10/2025CompleteKJK ELECTRIC INCGeneral Wiring
04/19/2023CompleteEPIC ELECTRIC INCGeneral Wiring
11/26/2019CompleteEIS ELECTRIC CORP DBA—
1 project · most recent 04/22/2025
Steel
FiledStatusContractorScope
04/22/2025Permit IssuedJEPOL CONSTRUCTION INCSteel
2 projects · most recent 12/10/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
12/10/2025Permit IssuedINTERSYSTEM CONSTRUCTIONScaffold
10/02/2025Permit IssuedINTERSYSTEM CONSTRUCTIONSidewalk Shed
1 project · most recent 10/12/2025
Suspended Scaffold
FiledStatusContractorScope
10/12/2025Permit IssuedJEPOL CONSTRUCTION INCSuspended Scaffold
1 project · most recent 10/12/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/12/2025Permit IssuedJEPOL CONSTRUCTION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/04/2023Energy Code Compliance InspectionsDavid Prendergastprogress
07/03/2023Lighting in dwelling unitsDavid Prendergastenergy_progress
07/03/2023FinalDavid Prendergastprogress
07/03/2023Energy Code Compliance InspectionsDavid Prendergastprogress
04/05/2023Energy Code Compliance InspectionsDavid Prendergastprogress
04/05/2023Lighting in dwelling unitsDavid Prendergastenergy_progress
04/05/2023Energy Code Compliance InspectionsDavid Prendergastprogress
04/05/2023FinalDavid Prendergastprogress
07/26/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/26/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
07/26/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
07/26/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
07/26/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
07/26/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/26/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
07/12/2022Mechanical SystemsCHRISTIAN LOZADAspecial
07/12/2022FinalCHRISTIAN LOZADAprogress
03/02/2022Mechanical SystemsVictor Schwartzspecial
03/02/2022HVAC-R and service water heating equipmentVictor Schwartzenergy_progress
03/02/2022Maintenance informationVictor Schwartzenergy_progress
03/02/2022HVAC-R and service water piping design and insulationVictor Schwartzenergy_progress
03/02/2022HVAC-R and service water heating system controlsVictor Schwartzenergy_progress
03/02/2022FinalVictor Schwartzprogress
▾Documents — 256 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch17
08/30/2026B00690463-I1Request digital key ↗
08/30/2026B00701724-P1Request digital key ↗
08/30/2026B00701547-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/15/2026B00432081-I1Request digital key ↗
▸Applications & Permits39
▸BISWORK PERMIT APPLICATION14
09/28/2020322028042Open ↗
07/22/2019340684520Open ↗
07/19/2019340684520Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
02/18/2025321697259Open ↗
01/10/2020322028042Open ↗
07/19/2019340684520Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWLPC Approval/Permit11
08/30/2026B00690463-I1Open ↗
08/30/2026B00701724-P1Open ↗
08/15/2026B00701724-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/08/2018321697259Open ↗
▸Seals & Professional Certifications64
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
01/10/2020322028042Open ↗
11/08/2019340684520Open ↗
03/13/2019340082136Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/02/2026B00432081-I1Open ↗
08/30/2026B00690463-I1Open ↗
08/30/2026B00701724-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/19/2026B00690463-I1Open ↗
09/19/2026B00690463-I1Open ↗
09/19/2026B00690463-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/19/2019340684520Open ↗
05/13/2015321125983Open ↗
08/29/2013340082136Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/19/2026B00690463-I1Open ↗
08/23/2026B00773539-I1Open ↗
08/23/2026B00773539-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/19/2019340684520Open ↗
08/29/2013340082136Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/13/2015321125983Open ↗
03/30/2012320440199Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/19/2019340684520Open ↗
08/29/2013340082136Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/30/2012320440199Open ↗
▸Trade Schedules & Equipment15
▸BISEQUIPMENT USE PERMITS4
11/08/2019340684520Open ↗
11/08/2019340684520Open ↗
11/08/2019340684520Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/10/2018321697259Open ↗
12/14/2017321697259Open ↗
07/09/2015340082136Open ↗
▸BISSCHEDULE B - PLUMBING3
08/29/2013340082136Open ↗
02/21/2012320430397Open ↗
02/23/2009310298914Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/13/2015340082136Open ↗
08/29/2013340082136Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/08/2019340684520Open ↗
11/08/2019340684520Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
01/16/2019321125983Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
01/10/2020322028042Open ↗
05/03/2018321697259Open ↗
07/19/2019340684520Open ↗
▸BISSTREET TREE CHECKLIST1
02/21/2012320430397Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00432081-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/30/2026B00690463-I1Open ↗
08/30/2026B00701724-P1Open ↗
08/21/2026B01254414-S1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
07/21/2020322028042Open ↗
07/19/2019340684520Open ↗
05/03/2018321697259Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/21/2012320430397Open ↗
02/23/2009310298914Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/10/2020322028042Open ↗
11/08/2019340684520Open ↗
03/13/2019340082136Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/12/2021322028042Open ↗
11/08/2019340684520Open ↗
03/13/2019340082136Open ↗
▸BISTECHNICAL REPORT: ENERGY3
03/22/2012320430397Open ↗
03/22/2012320430397Open ↗
02/21/2012320430397Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/19/2019340684520Open ↗
08/29/2013340082136Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/19/2019340684520Open ↗
08/29/2013340082136Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/30/2026B00690463-I1Open ↗
08/13/2026B00701547-I1Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/19/2025321697259Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/19/2025321697259Open ↗
▸BISLIGHTING CONTROLS1
02/19/2025321697259Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/19/2025321697259Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY12
03/10/2025321697259Open ↗
03/10/2025321697259Open ↗
03/07/2025321697259Open ↗
Showing 3 of 12 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/07/2025321697259Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/07/2025321697259Open ↗
▸Approvals, Objections & Sign-offs27
▸BISLANDMARKS APPROVAL8
06/25/2020322028042Open ↗
11/08/2019340684520Open ↗
07/19/2019340684520Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
03/28/2025321697259Open ↗
03/01/2021322028042Open ↗
11/08/2019340684520Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/26/2020322028042Open ↗
03/13/2019340082136Open ↗
01/16/2019321125983Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/28/2012320440199Open ↗
02/21/2012320430397Open ↗
02/23/2009310298914Open ↗
▸BISLANDMARKS SIGNOFF2
03/10/2025321697259Open ↗
03/01/2021322028042Open ↗
▸BISFINAL1
02/19/2025321697259Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
01/16/2019321125983Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
03/10/2025321697259Open ↗
02/24/2021322028042Open ↗
02/24/2021322028042Open ↗
Showing 3 of 15 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/19/2025321697259Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET6
06/23/2020322028042Open ↗
01/10/2020322028042Open ↗
12/14/2017321697259Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
11/08/2019340684520Open ↗
03/13/2019340082136Open ↗
02/13/2019321125983Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
08/10/2018321697259Open ↗
11/16/2012320430397Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/19/2019340684520Open ↗
08/29/2013340082136Open ↗
▸Other Documents5
▸DOB NOWProof of Historic Building2
08/13/2026B01240313-I1Open ↗
08/13/2026B01254414-I1Open ↗
▸BISECCCNYS ANALYSIS1
06/25/2020322028042Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01259290-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01259290-I1Open ↗