Two family brick
2775 RESERVOIR AVENUE
💬 Discuss this project
1940Year Built
4Stories
B1Building Class
R6Zoning
8,293 sfGross Floor Area
2Units
Rent Stabilized0 Open Violations
Two family brick · Owner of record: 2775 RESERVOIR AVE LLC · 3,418 sf lot · 2.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Roof16p · 2 filings · 20 docs
Penthouse14p · 1 filing · 20 docs
Floor 415p · 1 filing · 20 docs
Floor 313p · 1 filing · 20 docs
Floor 217p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHESAKL ENTERPRISES403/22/2026
BUILDERS GROUP USA303/22/2026
2775 RESERVOIR AVE LLC103/22/2026
BUILDERS GROUP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/13/2022$930K—— → —$112/sf building
01/15/2014$610K—Private party → Private party$74/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2403/21/2026
EMPIRE EXPEDITING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor1507/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor207/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
STELLAR INDUSTRIES INCGeneral Contractor107/08/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161404/10/2025
M. INT'L ENGINEERING PLLC3129405/22/2024
Building Lifecycle
All (121)Filed (21)Permit Issued (17)Signed Off (8)Violation (9)Inspection (15)Objection (18)Special Inspection (30)Tax Incentive (3)
07/10/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-S5
07/07/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-S4
07/01/2026
421-a(16) construction completed
05/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/22/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/11/2025
Violation issued (HPD, closed)
C
10/11/2025
Violation issued (HPD, closed)
C
04/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/17/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/17/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/17/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
04/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/17/2025
Special inspection requirement — Vestibules
FAHAD FATEH
04/17/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/17/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
04/17/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/17/2025
Special inspection requirement — Metering
FAHAD FATEH
04/17/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/17/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/17/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/17/2025
Special inspection requirement — Preliminary
FAHAD FATEH
04/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/17/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/17/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-P8
12/16/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-S6
12/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/16/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
12/16/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
12/16/2024
Special inspection requirement — Fireplaces
FAHAD FATEH
12/16/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
12/16/2024
Special inspection requirement — Final
FAHAD FATEH
12/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/06/2024
Objection resolved — Addressed
11/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/07/2024
Signed off — Alteration
X01039367-I1
10/10/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/07/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/06/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-P7
09/02/2024
421-a(16) registration filed
08/19/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-S2
08/15/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-S1
07/29/2024
Signed off — Alteration
Installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No change in use, egress, or occupancy
X00857344-I1
07/29/2024
Permit issued — Sidewalk Shed
X00857344-I1-SH
07/29/2024
Permit issued — Sprinklers
X00718234-S5-EW-SP
07/23/2024
Objection raised — Energy
07/22/2024
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
07/22/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
07/15/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-P5
07/15/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-P4
07/11/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTIONWITH MAIN APPLICATION # X00718234-l1
X00718234-P6
07/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/07/2024
Signed off — Alteration
FOUNDATION FILING IN CONJUNCTION WITH DOB ALT1 APPLICATION X00718234-I1.
X00730286-I1
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL07/29/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/29/2024
DOB NOWSupported ScaffoldSigned-offBUILDERS GROUP USA05/28/2024
DOB NOWStructuralSigned-offBUILDERS GROUP USA03/26/2024
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA02/14/2024
DOB NOWFoundationSigned-offBUILDERS GROUP USA01/23/2024
DOB NOWStructuralSigned-offBUILDERS GROUP USA01/08/2024
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA01/02/2024
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY10/31/2023
DOB NOWStructuralSigned-offBUILDERS GROUP USA07/17/2023
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA07/11/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/07/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA06/29/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL04/28/2023
DOB NOWFoundationSigned-offBUILDERS GROUP USA04/04/2023
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA02/15/2023
DOB NOWFoundationSigned-offSTELLAR INDUSTRIES INC05/25/2022
BISEQISSUEDCHESAKL ENTERPRISES INC03/15/2023
1 project · most recent 04/10/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2025Signed-offBUILDERS GROUP USA INCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXF12AXVJU 12,000 BTU · Ahu ×28
4MXS36WMVJU9 36,000 BTU · Ahu ×2
1 project · most recent 04/10/2025
Storm Water/Sanitary
FiledStatusContractorScope
04/10/2025Signed-offA. M. PLUMBING COMPANYStorm, Water/Sanitary
4 projects · most recent 11/13/2025
General Wiring
FiledStatusContractorScope
11/13/2025CompleteFRIED ELECTRIC CO.General Wiring
02/26/2025CompleteD & W ELECTRICAL CONT COR16 meters, 16 new_meters
01/18/2025CompleteFRIED ELECTRIC CO.General Wiring
05/22/2023CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 04/10/2025
Steel
FiledStatusContractorScope
04/10/2025Signed-offA M B MECHANICAL INCSteel
1 project · most recent 04/10/2025
Fence
FiledStatusContractorScope
04/10/2025Signed-offA M B MECHANICAL INCFence
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2026Fail-Final CND-Occupancy InspectionFailView ↗
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2024Pass-Final PL - UndergroundPassView ↗
04/17/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2023Pass-Final PL - UndergroundPassView ↗
12/14/2023Fail-Final PL - UndergroundFailView ↗
12/11/2023Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
04/17/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/17/2025PreliminaryFAHAD FATEHprogress
04/17/2025MeteringFAHAD FATEHenergy_progress
04/17/2025Exterior lighting powerFAHAD FATEHenergy_progress
04/17/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/17/2025Lighting controlsFAHAD FATEHenergy_progress
04/17/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
04/17/2025Fenestration areasFAHAD FATEHenergy_progress
04/17/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/17/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/17/2025Maintenance informationFAHAD FATEHenergy_progress
04/17/2025Fenestration air leakageFAHAD FATEHenergy_progress
04/17/2025Interior lighting powerFAHAD FATEHenergy_progress
04/17/2025VestibulesFAHAD FATEHenergy_progress
04/17/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/17/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
04/17/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/17/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/16/2024FinalFAHAD FATEHprogress
12/16/2024FireplacesFAHAD FATEHenergy_progress
12/16/2024Maintenance informationFAHAD FATEHenergy_progress
12/16/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/16/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/16/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/16/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
Latest 25 of 74.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/24/2026X00730286-P1Request digital key ↗
08/24/2026X00730286-I1Request digital key ↗
08/24/2026X00730286-P2Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
07/15/2024240329541Open ↗
06/28/2024240360131Open ↗
03/14/2023240344953Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
03/15/2023240344953Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00718234-I1Open ↗
08/13/2026X00718234-P8Open ↗
08/13/2026X00718234-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026X00718234-I1Open ↗
08/13/2026X00718234-P3Open ↗
08/13/2026X00718234-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00718234-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/24/2026X00730286-I1Open ↗
08/24/2026X00730286-P2Open ↗
08/24/2026X00730286-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026X00718234-I1Open ↗
08/30/2026X00718234-P5Open ↗
08/29/2026X00730286-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026X00718234-I1Open ↗
09/02/2026X00718234-I1Open ↗
08/29/2026X00730286-P1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/28/2024240360131Open ↗
06/07/2022240329541Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/14/2023240344953Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/14/2023240344953Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/14/2023240344953Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00718234-P8Open ↗
08/13/2026X00718234-P7Open ↗
08/13/2026X00718234-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸BISBPP: STREET TREES SITE PLAN1
08/23/2024240360131Open ↗
▸DOB NOWStreet Tree Sign Off1
08/21/2026X00718234-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00718234-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00718234-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/24/2026X00730286-P1Open ↗
08/24/2026X00730286-I1Open ↗
08/24/2026X00730286-P2Open ↗
Showing 3 of 18 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/14/2023240344953Open ↗
06/07/2022240329541Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL1
03/20/2024240344953Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/25/2024240344953Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/14/2023240344953Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/20/2024240344953Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET3
06/28/2024240360131Open ↗
03/14/2023240344953Open ↗
06/07/2022240329541Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial4
08/13/2026X00718234-I1Open ↗
08/13/2026X00718234-P7Open ↗
08/13/2026X00718234-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00718234-P8Open ↗
08/13/2026X00718234-P7Open ↗
08/13/2026X00718234-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026X00730286-I1Open ↗
08/13/2026X00730286-P1Open ↗
08/13/2026X00730286-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026X00718234-P8Open ↗
08/21/2026X00718234-P7Open ↗
08/21/2026X00718234-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
08/23/2024240360131Open ↗
06/07/2022240329541Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00718234-I1Open ↗