← Back
Predominantly retail with other uses
63 GUERNSEY STREET
BROOKLYN · BIN 3065960
💬 Discuss this project
1929Year Built
3Stories
K4Building Class
M1-1Zoning
47,527 sfGross Floor Area
8Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 33 NASSAU LLC · 25,000 sf lot · 1.9 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof5p · 4 filings · 20 docs
Floor 313p · 4 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 113p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KALMON DOLGIN AFFILIATES, INC2807/08/2026
33 NASSAU1103/22/2026
33 NASSAU LLC MGMT CO IN103/22/2026
33 NASSAU LLC KND MANAGEM103/22/2026
MBR CONTRACTING103/22/2026
WILLMARK SALES COMPANY503/22/2026
WILLMARK SALED CO103/22/2026
ISLAND BAKING CORP103/22/2026
WILLMAKR SALES INC103/22/2026
WHITEHEAD COMPANY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE1003/21/2026
T F CUSANELLI FILLETTI ARCHITECT203/21/2026
4444 PPPP CORP503/21/2026
BUILDING BROTHERS203/21/2026
SUMMIT CONSULTING & EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IN HOUSE GROUP INCGeneral Contractor1407/08/2026
DUMANI CONSTRUCTION INCGeneral Contractor503/22/2026
ENER-CON TECHNICAL SERVICGeneral Contractor507/08/2026
ALL PRO PLBG & HTG INCFire Protection207/08/2026
VICTOR A FILLETTIElectrical103/21/2026
PAUL SIGNSScaffold107/08/2026
CASINO PLMBG & HTG CORPFire Protection107/08/2026
LIBERTY MGTM & CONSTRUCTIGeneral Contractor104/09/2026
TT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARCH CHADWICK, ARCHITECT2253206/02/2026
CITY-WIDE TESTING INC416303/09/2026
AG ENGINEERING PLLC8899111/18/2024
RICHMOND TESTING LAB263501/23/2024
SOIL MECHANICS DRILLING C2325702/16/2023
CROSSCHECK INSPECTION SER544302/14/2023
A&B WORLD CONSULTING, INC5704106/13/2022
Building Lifecycle
All (210)Filed (30)Permit Issued (19)Signed Off (14)Violation (60)Inspection (11)Objection (46)Special Inspection (30)
06/10/2026
Signed off — Alteration
Proposed interior renovation of an existing commercial space to create an office @partial 2 floor. Work includes installation of new and replacement/relocation of existing non-bearing partitions, finishes & casework. No change to use occupancy or egress.
B01295656-S1
06/04/2026
Signed off — Alteration
Proposed interior renovation of an existing commercial space to create an office @partial 2 floor. Work includes installation of new and replacement/relocation of existing non-bearing partitions, finishes & casework. No change to use occupancy or egress.
B01295656-I1
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARCH CHADWICK
06/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARCH CHADWICK
06/03/2026
Special inspection requirement — Mechanical Systems
MARCH CHADWICK
06/03/2026
Special inspection requirement — Final
MARCH CHADWICK
06/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARCH CHADWICK
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
06/03/2026
Special inspection requirement — Shutoff dampers
MARCH CHADWICK
06/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARCH CHADWICK
06/03/2026
Special inspection requirement — Maintenance information
MARCH CHADWICK
06/02/2026
Filed — Alteration
Proposed interior renovation of an existing commercial space to create an office @partial 2 floor. Work includes installation of new and replacement/relocation of existing non-bearing partitions, finishes & casework. No change to use occupancy or egress.
B01295656-P2
05/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARCH CHADWICK
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARCH CHADWICK
05/05/2026
Special inspection requirement — Shutoff dampers
MARCH CHADWICK
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARCH CHADWICK
05/05/2026
Special inspection requirement — Mechanical Systems
MARCH CHADWICK
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARCH CHADWICK
05/05/2026
Special inspection requirement — Final
MARCH CHADWICK
05/05/2026
Special inspection requirement — Maintenance information
MARCH CHADWICK
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
03/11/2026
Special inspection requirement — Interior lighting power
MARCH CHADWICK
03/11/2026
Special inspection requirement — Lighting controls
MARCH CHADWICK
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
MARCH CHADWICK
03/11/2026
Special inspection requirement — Final
MARCH CHADWICK
03/09/2026
Filed — Alteration
Proposed interior renovation of an existing commercial space to create an office @partial 2 floor. Work includes installation of new and replacement/relocation of existing non-bearing partitions, finishes & casework. No change to use occupancy or egress.
B01295656-P1
03/05/2026
Special inspection requirement — Final
MARCH CHADWICK
03/05/2026
Special inspection requirement — Interior lighting power
MARCH CHADWICK
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
MARCH CHADWICK
03/05/2026
Special inspection requirement — Lighting controls
MARCH CHADWICK
03/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
01/23/2026
Permit issued — Mechanical Systems
B01295656-S1-MS
12/05/2025
Violation issued (FDNY_NOV, closed)
11/19/2025
Permit issued — General Construction
B01295656-I1-GC
10/03/2025
Filed — Alteration
Proposed interior renovation of an existing commercial space to create an office @partial 2 floor. Work includes installation of new and replacement/relocation of existing non-bearing partitions, finishes & casework. No change to use occupancy or egress.
B01295656-S1
10/01/2025
Filed — Alteration
Proposed interior renovation of an existing commercial space to create an office @partial 2 floor. Work includes installation of new and replacement/relocation of existing non-bearing partitions, finishes & casework. No change to use occupancy or egress.
B01295656-I1
04/05/2025
Violation issued (FDNY_ORDER, closed)
12/30/2024
Signed off — Alteration
B01142239-I1
12/24/2024
Permit issued — Mechanical Systems
B01142239-I1-MS
12/10/2024
Violation issued (FDNY_ORDER, closed)
11/18/2024
Filed — Alteration
B01142239-I1
11/18/2024
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
11/18/2024
Special inspection requirement — Maintenance information
ARIEL GOLSHAN
08/12/2024
Signed off — Alteration
SPRINKLER SYSTEM MODIFICATIONS IN CONJUNCTION WITH RENOVATION OF 3RD FLOOR OFFICE SUITE. INSTALL/RELOCATE SPRINKLER HEADS AND RELATED PIPING.
B00734083-I1
08/06/2024
Violation issued (FDNY_NOV, closed)
07/19/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/17/2024
Permit issued — Sprinklers
B00734083-I1-EW-SP
07/09/2024
Signed off — Alteration
INTERIOR ALTERATION TO 3RD FLOOR OFFICE SUITE. DEMO AND CONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, FINISHES, AND CABINETRY. RELATED MINOR MECHANICAL WORK TO INSTALL TX FANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00693084-I1
02/16/2024
Objection resolved — Addressed
01/31/2024
Objection raised — Scope
01/23/2024
Filed — Alteration
INTERIOR ALTERATION TO 3RD FLOOR OFFICE SUITE. DEMO AND CONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, FINISHES, AND CABINETRY. RELATED MINOR MECHANICAL WORK TO INSTALL TX FANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00693084-P1
01/04/2024
Filed — Alteration
SPRINKLER SYSTEM MODIFICATIONS IN CONJUNCTION WITH RENOVATION OF 3RD FLOOR OFFICE SUITE. INSTALL/RELOCATE SPRINKLER HEADS AND RELATED PIPING.
B00734083-P1
01/04/2024
Violation issued (ECB, closed)
Elevators
10/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offENER-CON TECHNICAL SERVIC01/23/2026
DOB NOWGeneral ConstructionSigned-offLIBERTY MGTM CONSTRUCTI11/19/2025
DOB NOWMechanical SystemsSigned-offENER-CON TECHNICAL SERVIC12/24/2024
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC07/17/2024
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC05/17/2023
DOB NOWMechanical SystemsSigned-offDUMANI CONSTRUCTION INC02/22/2023
DOB NOWCurb CutSigned-offIN HOUSE GROUP09/16/2022
DOB NOWSignSigned-offPAUL SIGNS, INC07/21/2022
DOB NOWGeneral ConstructionSigned-offIN HOUSE GROUP06/27/2022
DOB NOWConstruction FenceSigned-offIN HOUSE GROUP06/24/2022
DOB NOWMechanical SystemsSigned-offIN HOUSE GROUP06/24/2022
DOB NOWGeneral ConstructionSigned-offIN HOUSE GROUP06/24/2022
DOB NOWSprinklersSigned-offCASINO PLMBG & HTG CORP06/22/2022
DOB NOWMechanical SystemsSigned-offENER-CON TECHNICAL SERVIC06/15/2022
DOB NOWConstruction FenceSigned-offIN HOUSE GROUP04/12/2022
DOB NOWStructuralSigned-offIN HOUSE GROUP04/07/2022
DOB NOWPlumbingSigned-offRENTOM GROUP CORP04/06/2022
DOB NOWMechanical SystemsSigned-offIN HOUSE GROUP03/10/2022
DOB NOWGeneral ConstructionSigned-offIN HOUSE GROUP03/08/2022
BIS—ISSUEDDUMANI CONSTRUCTION INC07/13/2023
BISMHISSUEDASFOUR GUZY ARCHITECTS10/12/2018
BIS—ISSUEDDUMANI CONSTRUCTION INC12/19/2016
BIS—ISSUEDLYNN AND SONS NY CONSULT07/14/2011
BISPLISSUEDACCURATE MECHANICAL INC01/13/2011
BISOTISSUEDLYNN AND SONS NY CONSULT12/20/2010
BISFPISSUEDMASTER FIRE SYSTEMS, INC10/29/2010
BISMHISSUEDLYNN AND SONS NY CONSULT08/23/2010
BISOTISSUEDLYNN AND SONS NY CONSULT07/30/2010
BISPLISSUEDACCURATE MECHANICAL INC07/19/2010
BISOTISSUEDMETRODESIGN REMODELING C06/18/2010
BISPLISSUEDIRWIN FRIEDMAN & SON INC11/26/2008
BISOTISSUEDDOMANI CONSTRUCTION INC11/19/2008
BISMHISSUEDDOMANI CONSTRUCTION INC11/19/2008
BISEQISSUEDDOMANI CONSTRUCTION INC11/19/2008
BISMHISSUEDCLIMATE WEATHERING INC.10/07/2008
BISOTISSUEDPHILIP TOSCANO09/26/2008
BISPLISSUEDIRWIN FRIEDMAN & SON INC09/26/2008
BISMHISSUEDTHERMO TECH MECH INC07/25/2008
BISOTISSUEDDOMANI CONST INC05/28/2008
BISEQISSUEDMBR CONTRACTING INC02/11/2008
+ 4 more permits on file
1 project · most recent 06/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Signed-offENER-CON TECHNICAL SERVICHeating and Air Conditioning Systems
Heat / Cool
Goodman Goodman AMST60DU1300, GLXS3BN6010 60,000 BTU · Condensing Unit ×1
Hisense AH-60U3R25E 5 tons · Ahu ×1
AOH-60U3R25E 60,000 BTU · Vrf Outdoor ×1
1 project · most recent 03/08/2022
FiledStatusContractorScope
03/08/2022——616 heads
1 project · most recent 06/06/2022
Water/Sanitary
FiledStatusContractorScope
06/06/2022——Water/Sanitary
6 projects · most recent 02/12/2026
General Wiring
FiledStatusContractorScope
02/12/2026CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
03/26/2023CompleteRIDGE ELECTRIC CORP.General Wiring
08/05/2022Permit IssuedCITI-WIDE ELECTRIC INCGeneral Wiring
07/31/2022Permit IssuedCITI-WIDE ELECTRIC INC1 meters, 1 new_meters
07/25/2022CompleteEMPIRE STATE ELECTL CORP—
11/25/2019CompleteHABER ELECTRIC CO., INC.—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/12/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
01/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/30/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2022Pass-Final PL - UndergroundPassView ↗
06/14/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
06/03/2026Shutoff dampersMARCH CHADWICKenergy_progress
06/03/2026HVAC-R and service water heating equipmentMARCH CHADWICKenergy_progress
06/03/2026Maintenance informationMARCH CHADWICKenergy_progress
06/03/2026HVAC-R and service water heating system controlsMARCH CHADWICKenergy_progress
06/03/2026HVAC-R and service water piping design and insulationMARCH CHADWICKenergy_progress
06/03/2026Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
06/03/2026Tenant Protection Plan ComplianceELIAS RASABIspecial
06/03/2026Mechanical SystemsMARCH CHADWICKspecial
06/03/2026FinalMARCH CHADWICKprogress
05/05/2026FinalMARCH CHADWICKprogress
05/05/2026Tenant Protection Plan Compliance—special
05/05/2026Shutoff dampersMARCH CHADWICKenergy_progress
05/05/2026HVAC-R and service water piping design and insulationMARCH CHADWICKenergy_progress
05/05/2026Maintenance informationMARCH CHADWICKenergy_progress
05/05/2026HVAC-R and service water heating system controlsMARCH CHADWICKenergy_progress
05/05/2026Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
05/05/2026Mechanical SystemsMARCH CHADWICKspecial
05/05/2026HVAC-R and service water heating equipmentMARCH CHADWICKenergy_progress
03/11/2026Interior lighting powerMARCH CHADWICKenergy_progress
03/11/2026Lighting controlsMARCH CHADWICKenergy_progress
03/11/2026Tenant Protection Plan ComplianceELIAS RASABIspecial
03/11/2026Energy Code Compliance InspectionsMARCH CHADWICKprogress
03/11/2026FinalMARCH CHADWICKprogress
03/05/2026Energy Code Compliance InspectionsMARCH CHADWICKprogress
03/05/2026Interior lighting powerMARCH CHADWICKenergy_progress
Latest 25 of 74.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brooklyn WineryRestaurant / Food ServiceFloor 1
Project B00610030 Alteration · LOC Issued · 10/26/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 489 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch28
08/31/2026B00609097-I1Request digital key ↗
08/31/2026B00609075-P2Request digital key ↗
08/31/2026B00609075-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/27/2026B00814409-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/27/2026B00828217-I1Request digital key ↗
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION38
11/19/2024320292937Open ↗
02/24/2023321412832Open ↗
02/22/2023321412832Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION28
07/14/2023321412832Open ↗
05/09/2019340664882Open ↗
05/03/2019340664882Open ↗
Showing 3 of 28 on file for this type
▸BISPLACE OF ASSEMBLY2
10/04/2018321845090Open ↗
12/05/2011320335366Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/30/2017321393862Open ↗
02/13/2017321412832Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
01/20/2017321412832Open ↗
08/08/2011320292937Open ↗
▸BISBPP-15 - Application for waiver of Builders pavement requirements1
03/09/2022321412832Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
09/23/2016321412832Open ↗
07/26/2011320292937Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/22/2021321412832Open ↗
▸BISPROVIDE RESTRICTIVE DECLARATIONPERMITTING THE USE OF ONLY ONE TENANTON THE 3RD FLOOR.1
10/15/2024321412832Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/22/2021321412832Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
10/15/2024321412832Open ↗
▸Seals & Professional Certifications176
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
07/05/2019340664882Open ↗
10/23/2018321739874Open ↗
10/23/2018321739874Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature41
09/27/2026B00760105-I1Open ↗
09/23/2026B00693084-I1Open ↗
09/23/2026B00693084-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/31/2026B00609097-I1Open ↗
08/31/2026B00614189-I1Open ↗
08/31/2026B00609075-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/23/2026B00693084-I1Open ↗
09/02/2026B00625971-I1Open ↗
09/02/2026B00625971-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
04/09/2018321739874Open ↗
06/19/2017321393862Open ↗
08/03/2011320335366Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
08/03/2011320335366Open ↗
07/26/2011320292937Open ↗
Showing 2 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/03/2019340664882Open ↗
10/04/2018321845090Open ↗
04/09/2018321739874Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/03/2019340664882Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/03/2019340664882Open ↗
▸Trade Schedules & Equipment22
▸BISSELF-CERT PLUMBING NOTICE6
03/08/2011320175145Open ↗
03/01/2011320175145Open ↗
02/15/2011320230530Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING6
01/18/2011320175145Open ↗
10/26/2010320230530Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
07/31/2019340664882Open ↗
10/23/2018321739874Open ↗
10/23/2018321739874Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
10/15/2024321412832Open ↗
01/25/2018321288717Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/31/2016321393862Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST5
05/04/2017321412832Open ↗
12/20/2016321412832Open ↗
07/01/2016321412832Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
08/31/2026B00609097-I1Open ↗
08/31/2026B00609075-I1Open ↗
08/31/2026B00609075-P2Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
10/26/2010320230530Open ↗
Showing 1 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
08/03/2011320335366Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/25/2022321412832Open ↗
10/25/2022321412832Open ↗
11/23/2016321412832Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/05/2019340664882Open ↗
06/19/2017321393862Open ↗
12/20/2016321412832Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/31/2026B00609075-I1Open ↗
08/14/2026B00614189-I1Open ↗
08/13/2026B00693084-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/03/2019340664882Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/04/2017321412832Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/03/2019340664882Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/31/2026B00625971-P1Open ↗
08/15/2026B00625971-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/03/2019340664882Open ↗
▸DOB NOWTR4 Plot Diagram1
08/15/2026B00625971-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B00625971-I1Open ↗
▸Approvals, Objections & Sign-offs52
▸BISADMINISTRATIVE OBJECTIONS16
08/03/2011320335366Open ↗
07/26/2011320292937Open ↗
10/26/2010320230530Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
07/31/2019340664882Open ↗
07/05/2019340664882Open ↗
10/23/2018321739874Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
02/24/2023321412832Open ↗
02/22/2023321412832Open ↗
01/13/2023321412832Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
10/15/2024321412832Open ↗
11/26/2021321412832Open ↗
11/26/2021321412832Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - Forwarding Letter to DEP1
07/05/2019340664882Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
09/14/2022321412832Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT31
07/31/2019340664882Open ↗
07/05/2019340664882Open ↗
05/03/2019340664882Open ↗
Showing 3 of 31 on file for this type
▸Filing & Intake Forms32
▸BISADDITIONAL INFORMATION14
01/10/2023321412832Open ↗
10/17/2018321739874Open ↗
09/21/2018321739874Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET10
04/10/2018321739874Open ↗
07/01/2016321412832Open ↗
12/22/2015321288717Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM5
07/31/2019340664882Open ↗
07/05/2019340664882Open ↗
10/23/2018321739874Open ↗
Showing 3 of 5 on file for this type
▸BISeFiling Job Application Cover Sheet3
10/26/2010320230530Open ↗
05/03/2019340664882Open ↗
Showing 2 of 3 on file for this type
▸Other Documents8
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS3
03/22/2011320230530Open ↗
03/01/2011320175145Open ↗
02/15/2011320230530Open ↗
▸BISPLOT DIAGRAM3
09/23/2016321412832Open ↗
07/01/2016321412832Open ↗
07/26/2011320292937Open ↗
▸BISTCO - Supporting Documents1
10/15/2024321412832Open ↗
▸DOB NOWTR5H Test Report1
08/15/2026B00625971-I1Open ↗