← Back
BuildNYC
Elevator apt, semi-fireproof without stores
28 MARINE AVENUE
BROOKLYN · Bay Ridge · BIN 3154995
💬 Discuss this project
1926Year Built
6Stories
D1Building Class
R4AZoning
64,800 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized4 Active Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Naisoph Holding Co · 15,000 sf lot · 4.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNaisoph Holding LLCUnder Construction1p · 1 filing · 8 docs
Floor 6Unit 6F, Unit 6H8p · 3 filings · 17 docs
Floor 5
Floor 4
Floor 3
Floor 2Unit 2E3p · 1 filing · 3 docs
Floor 1
Site & exteriorNaisoph Holding LLCUnder Construction15p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Naispoh Holding503/21/2026
431 Holding407/08/2026
Redleaf Capital103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rimkus108/05/2025
Lane Engineering Consulting103/26/2025
DC Design Consulting405/08/2024
Dan Choi Architecture105/08/2024
Wellworth Consulting204/01/2024
Thomas Tsue Architect111/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigging Consultants403/21/2026
Jenny Flores Expediting203/21/2026
United Safety Consultants203/21/2026
Kma Designs203/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold510/27/2026
OM ElectricElectrical503/22/2026
Naisoph HoldingGeneral Contractor407/08/2026
OM ElectricElectrical303/21/2026
Abr Plumbing & Heating ContractingPlumbing207/08/2026
SKY Rise Restorationspecialty_contractor206/27/2026
Spring ScaffoldingScaffold207/08/2026
High Quality Electric ofElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Walsh Engineering9393208/08/2025
Lane Engineering Consulting2967103/26/2025
Project Tactical Solution5859103/26/2025
DC Design Consulting8078205/08/2024
Thomas Tsue Architect5814111/23/2020
Building Lifecycle
10/26/2026
Permit renewed — Sidewalk Shed
Renewed without changes
B01263124-I1-SH
09/24/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/11/2026
Elevator Category 1 inspection report filed
08/06/2026
Failure to provide unobstructed exit passageway. Noted: at a 6-story multi dwelling observed window mounted a/c units installed fire escape access…
ECB violation · open
08/04/2026
Permit renewed — Sidewalk Shed
Renewed with changes
B01263124-I1-SH
171 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY10/26/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY08/04/2026
DOB NOWSuspended ScaffoldPermit IssuedSKY Rise Restoration07/21/2026
DOB NOWGeneral ConstructionPermit IssuedSKY Rise Restoration06/25/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY08/05/2025
DOB NOWSuspended ScaffoldPermit IssuedSKY Rise Restoration07/21/2025
DOB NOWGeneral ConstructionPermit IssuedSKY Rise Restoration07/01/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/20/2025
DOB NOWGeneral ConstructionSigned-offNaisoph Holding06/14/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/20/2024
DOB NOWPlumbingSigned-offAbr Plumbing & Heating Contracting04/28/2022
DOB NOWGeneral ConstructionSigned-offNaisoph Holding03/14/2022
DOB NOWPlumbingSigned-offAbr Plumbing & Heating Contracting11/25/2020
BISOTISSUEDNaisoph Holding02/04/2021
BISOTISSUEDNaisoph Holding11/25/2020
BISPLISSUEDAbr Plumbing & Heating Contracting04/11/2019
BISOTISSUEDNaisoph Holding04/09/2019
BISPLISSUEDJB Buzco Plumbing04/03/2017
BISOTISSUEDRapex Contracting03/03/2017
BISOTISSUEDRafiqul Anwar11/01/2016
BISEQISSUEDGul & G Contracting11/01/2016
BISOTISSUEDEmg Industrial Chimney12/15/2015
BISPLISSUEDG.bassolino Plumbing06/29/2015
BISOTISSUEDLeardon Boiler Works06/29/2015
BISPLISSUEDJB Buzco Plumbing03/20/2015
BISPLISSUEDJB Buzco Plumbing03/11/2015
BISOTISSUEDNaisoph Holding01/28/2015
BISOTISSUEDNaisoph Holding01/28/2015
BISOTISSUEDNaisoph Holding10/29/2014
BISPLISSUEDJB Buzco Plumbing10/22/2014
BISPLISSUEDJB Buzco Plumbing10/17/2014
BISOTISSUEDNaisoph Holding09/24/2014
BISOTISSUEDNaisoph Holding08/18/2014
BISOTISSUEDNaisoph Holding08/12/2014
BISOTISSUEDNaisoph Holding07/19/2013
BISPLISSUEDJB Buzco Plumbing04/09/2013
BISOTISSUEDNaisoph Holding01/23/2013
BISOTISSUEDNaisoph Holding01/17/2013
BISPLISSUEDJB Buzco Plumbing12/06/2012
BISOTISSUEDNaisoph Holding10/23/2012
25 projects · most recent 03/03/2026
General Wiring
FiledStatusContractorScope
03/03/2026CompleteOM ElectricGeneral Wiring
11/10/2025CompleteOM ElectricGeneral Wiring
08/15/2025CompleteOM ElectricGeneral Wiring
08/05/2025Permit IssuedHigh Quality Electric of NYC—
09/24/2024CompleteOM ElectricGeneral Wiring
06/14/2024CompleteOM ElectricGeneral Wiring
02/21/2024CompleteTop Shelf Electric—
06/16/2023CompleteOM ElectricGeneral Wiring
08/17/2022CompleteOM ElectricGeneral Wiring
07/13/2022CompleteOM ElectricGeneral Wiring
05/04/2022CompleteOM ElectricGeneral Wiring
02/16/2022CompleteOM ElectricGeneral Wiring
02/09/2022CompleteOM ElectricGeneral Wiring
12/06/2021CompleteOM ElectricGeneral Wiring
09/28/2021CompleteOM ElectricGeneral Wiring
1 project · most recent 08/05/2025
Sidewalk Shed
FiledStatusContractorScope
08/05/2025Permit IssuedKings Group NYSidewalk Shed
1 project · most recent 08/08/2025
Suspended Scaffold
FiledStatusContractorScope
08/08/2025Permit IssuedSKY Rise RestorationSuspended Scaffold
1 project · most recent 08/08/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
08/08/2025Permit IssuedSKY Rise RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/25/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/06/2025Post-installed AnchorsBrennan Walshspecial
08/06/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
04/17/2025Air barrier - visual inspectionDouglas Laneenergy_progress
03/26/2025Post-installed AnchorsDouglas Lanespecial
03/26/2025MasonryDouglas Lanespecial
03/26/2025Structural Stability – Alterations of existing buildingsDouglas Lanespecial
03/26/2025Energy Code Compliance InspectionsDouglas Laneprogress
03/12/2025Tenant Protection Plan ComplianceMax Leespecial
03/12/2025FinalDouglas Laneprogress
05/07/2024Tenant Protection Plan ComplianceDAN CHOIspecial
05/07/2024Tenant Protection Plan ComplianceDAN CHOIspecial
05/07/2024Lighting in dwelling unitsDAN CHOIenergy_progress
05/07/2024Fire-Resistant Penetrations and JointsDAN CHOIspecial
05/07/2024FinalDAN CHOIprogress
296 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account