BuildNYC
Elevator cooperative
Penn South
280 9TH AVENUE · BIN 1082794
💬 Discuss this project
1960Year Built
22Stories
D4Building Class
R8Zoning
1,448,543 sfGross Floor Area
1,140Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: Mutual Redevelopment Houses · 350,782 sf lot · 4.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMutual Redevelopment Houses Inc.1 filing
Floor 18Unit 18C1 filing · 2 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarMutual Redevelopment House INC2p · 2 filings · 11 docs
Site & exteriorChurch of the Holy Apostles3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Church of the Holy Apostles507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MK Associates104/11/2025
Ancora Engineering108/06/2024
Howard L Zimmerman Arch & Engineering507/30/2024
G. Blinn Consulting107/22/2024
Matiz Architecture and Design106/05/2024
Ashraf103/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hlzae203/21/2026
Socotec403/21/2026
A1 Expediting Service203/21/2026
Howard L Zimmerman Architects603/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prat EnterprisesScaffold407/08/2026
Triton Construction CoGeneral Contractor307/08/2026
S&E Bridge & ScaffoldScaffold203/21/2026
Safetech Electrical ContngElectrical203/22/2026
Symmetrical ConstructionGeneral Contractor203/21/2026
Joseph Weinstein ElectricElectrical103/22/2026
Systems 2000 Plumbing ServicesPlumbing107/08/2026
Lens ElectricElectrical103/22/2026
WCK ElectricElectrical103/21/2026
Prat EnterprisesGeneral Contractor107/08/2026
Kew-Forest Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ancora Engineering6818108/06/2024
DNA Controlled Inspection554208/06/2024
Howard L Zimmerman Architects1712407/30/2024
Building Lifecycle
All (143)Filed (10)Permit Issued (9)Signed Off (7)Facade (FISP) (15)Violation (59)Inspection (3)Objection (22)Special Inspection (18)
08/03/2026
Signed off — Alteration
M01084044-I1
06/30/2025
Signed off — Alteration
M01204317-I1
06/25/2025
Violation issued (ECB, closed)
Construction
04/15/2025
Permit issued — General Construction
M01204317-I1-GC
04/11/2025
Filed — Alteration
M01204317-I1
04/07/2025
Signed off — Alteration
M01079753-I1
03/05/2025
Signed off — Alteration
SOE FILING: PERFORM EXCAVATIONS FOR NEW RETAINING WALL CONSTRUCTION FOR EGRESS TO LOWER PORTION OF EXISTING BUILDING.
M01022522-S1
02/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/16/2025
Permit issued — Sprinklers
M01079753-I1-EW-SP
10/16/2024
Signed off — Alteration
SOE FILING: PERFORM EXCAVATIONS FOR NEW RETAINING WALL CONSTRUCTION FOR EGRESS TO LOWER PORTION OF EXISTING BUILDING.
M01022522-I1
08/20/2024
Permit issued — Support of Excavation
M01022522-S1-SE
08/06/2024
Filed — Alteration
SOE FILING: PERFORM EXCAVATIONS FOR NEW RETAINING WALL CONSTRUCTION FOR EGRESS TO LOWER PORTION OF EXISTING BUILDING.
M01022522-S1
07/31/2024
Permit issued — Structural
M01022522-I1-GC-CX
07/31/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Gregory Moormann
07/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM FITZJOHN
07/31/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Gregory Moormann
07/30/2024
Filed — Alteration
M01079753-I1
07/23/2024
Permit issued — Construction Fence
M01084044-I1-FN
07/22/2024
Filed — Alteration
M01084044-I1
06/26/2024
Objection raised — Fire_Protection
06/26/2024
Objection resolved — Addressed
06/26/2024
Special inspection requirement — Subgrade Inspections
WILLIAM FITZJOHN
06/26/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
WILLIAM FITZJOHN
06/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM FITZJOHN
06/20/2024
Objection raised — Admin
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection raised — Inspections
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection raised — Scope
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection raised — Admin
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection raised — Structural
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection raised — Admin
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection raised — Inspections
06/20/2024
Objection resolved — Addressed
06/05/2024
Filed — Alteration
SOE FILING: PERFORM EXCAVATIONS FOR NEW RETAINING WALL CONSTRUCTION FOR EGRESS TO LOWER PORTION OF EXISTING BUILDING.
M01022522-I1
05/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM FITZJOHN
04/01/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM FITZJOHN
03/19/2024
Special inspection requirement — Final
WILLIAM FITZJOHN
10/31/2023
Cycle 9 facade report submitted
10/31/2023
Cycle 9 facade report signed — SAFE
09/21/2023
Signed off — Alteration
FACADE REPAIRS INCLUDING BRICK REPOINTING, CONCRETE EYEBROW REPAIRS AND REPLACEMENT OF BRICK MASONRY, WINDOW SILLS, LINTELS, TERRA COTTA COPING, AND CONCRETE COPING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00714025-I1
09/21/2023
Filed — Alteration
FACADE REPAIRS INCLUDING BRICK REPOINTING, CONCRETE EYEBROW REPAIRS AND REPLACEMENT OF BRICK MASONRY, WINDOW SILLS, LINTELS, TERRA COTTA COPING, AND CONCRETE COPING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00714025-P1
09/21/2023
Special inspection requirement — Final
Howard Zimmerman
09/21/2023
Special inspection requirement — Masonry
Howard Zimmerman
09/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
09/08/2023
Cycle 9 facade inspection completed
08/04/2023
Signed off — Alteration
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00698147-I1
06/13/2023
Violation issued (ECB, closed)
Construction
06/13/2023
Violation issued (ECB, closed)
Construction
06/13/2023
Violation issued (ECB, closed)
Construction
06/13/2023
Violation issued (ECB, closed)
Construction
03/10/2023
Permit issued — Sidewalk Shed
M00698147-I1-SH
10/15/2022
Permit issued — General Construction
M00714025-I1-GC
08/11/2022
Special inspection requirement — Masonry
Howard Zimmerman
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSymmetrical Construction04/15/2025
DOB NOWSprinklersSigned-offKew Forest Plumbing & Heating01/16/2025
DOB NOWSupport of ExcavationPermit IssuedTriton Construction Co08/20/2024
DOB NOWStructuralSigned-offTriton Construction Co07/31/2024
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold07/23/2024
DOB NOWSidewalk ShedSigned-offPrat Enterprises03/10/2023
DOB NOWGeneral ConstructionSigned-offPrat Enterprises10/15/2022
DOB NOWPlumbingPermit IssuedSystems 2000 Plumbing Services06/29/2022
DOB NOWSidewalk ShedSigned-offPrat Enterprises03/15/2022
BISPLISSUEDAccurate Mechanical05/17/2017
BISOTISSUEDEast End Builders and As05/15/2017
BISPLISSUEDM & S Mechanical Services01/12/2017
BISEQISSUEDDynamic Installation10/09/2014
BISOTISSUEDMetropolitan Painting &09/11/2014
BISMHISSUEDF.W. Sims06/27/2014
BISOTISSUEDF.W. Sims06/27/2014
BISMHISSUEDF.W. Sims03/28/2014
BISOTISSUEDF.W. Sims03/28/2014
BISOTISSUEDF.W. Sims01/30/2014
BISEQISSUEDEmpire Control Abatement06/26/2013
BISOTISSUEDAM&G Waterproofing07/27/2012
BISEQISSUEDDynamic Bridge & Scaffold06/22/2012
BISOTISSUEDAM&G Waterproofing06/27/2011
BISEQISSUEDS&E Bridge & Scaffold04/11/2011
BISEQISSUEDS&E Bridge & Scaffold07/09/2008
BISEQISSUEDTwin Swing Scaff08/08/2003
BISEQISSUEDTwin Scaffolding05/20/2002
BISOTISSUEDSkyline Windows09/26/1996
BISEQISSUEDAtlantic Scaffolding03/28/1996
BISOTISSUEDM & G Waterproofing03/12/1996
1 project · most recent 06/15/2022
Gas
FiledStatusContractorScope
06/15/2022Permit IssuedSystems 2000 Plumbing ServicesGas
12 projects · most recent 04/07/2025
General Wiring
FiledStatusContractorScope
04/07/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
04/02/2025CompleteSafetech Electrical Contng—
04/02/2025CompleteSafetech Electrical Contng—
01/11/2024CompleteSafetech Electrical Contng—
01/11/2024CompleteSafetech Electrical Contng—
01/11/2024CompleteSafetech Electrical Contng—
01/11/2024CompleteSafetech Electrical Contng—
01/11/2024CompleteSafetech Electrical Contng—
01/11/2024CompleteSafetech Electrical Contng—
04/27/2022CompleteSteven Farkas—
02/09/2022CompleteGotham Wiring Licensed—
08/02/2019Permit IssuedLens ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/31/2024Excavations - Sheeting, Shoring, and BracingGregory Moormannspecial
07/31/2024Tenant Protection Plan ComplianceWILLIAM FITZJOHNspecial
07/31/2024Construction Operations Influencing Adjacent StructuresGregory Moormannspecial
06/26/2024Subgrade InspectionsWILLIAM FITZJOHNspecial
06/26/2024Excavations - Sheeting, Shoring, and BracingWILLIAM FITZJOHNspecial
06/26/2024Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
05/20/2024Tenant Protection Plan ComplianceWILLIAM FITZJOHNspecial
04/01/2024Concrete - Cast-In-PlaceWILLIAM FITZJOHNspecial
03/19/2024FinalWILLIAM FITZJOHNprogress
09/21/2023FinalHoward Zimmermanprogress
09/21/2023MasonryHoward Zimmermanspecial
09/21/2023Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
08/11/2022MasonryHoward Zimmermanspecial
08/11/2022Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
08/11/2022FinalHoward Zimmermanprogress
05/31/2022Final—progress
04/28/2022Post-installed AnchorsJon Colatrellaspecial
04/28/2022Fire-Resistant Penetrations and JointsJon Colatrellaspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Church of the Holy ApostlesReligious—
Project M01022522 Alteration · LOC Issued · 06/05/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/02/2026M00698147-I1Request digital key ↗
09/02/2026M00714025-P1Request digital key ↗
09/02/2026M00714025-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION20
08/16/2017122922515Open ↗
07/21/2017122922515Open ↗
06/26/2017121238598Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION17
05/22/2017121238598Open ↗
05/18/2017121238598Open ↗
05/18/2017121238598Open ↗
Showing 3 of 17 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
06/08/2011110288929Open ↗
▸Seals & Professional Certifications72
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
11/16/2017122922515Open ↗
08/24/2017121238598Open ↗
05/23/2017121238598Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026M00698147-I1Open ↗
09/02/2026M00714025-P1Open ↗
09/02/2026M00714025-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/29/2026M01022522-S1Open ↗
09/29/2026M01022522-S1Open ↗
09/29/2026M01022522-S1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
05/23/2017121238598Open ↗
10/14/2014122111311Open ↗
08/20/2014122081433Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/23/2017121238598Open ↗
10/14/2014122111311Open ↗
08/20/2014122081433Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/25/2012121117567Open ↗
04/13/2011120658010Open ↗
07/09/2008110288929Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026M01022522-I1Open ↗
08/25/2026M00714025-I1Open ↗
08/24/2026M00714025-P1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/26/2013140088624Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/26/2013140088624Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
08/16/2017122922515Open ↗
07/21/2017122922515Open ↗
06/26/2017121238598Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
05/23/2017121238598Open ↗
11/14/2016122922515Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00714025-I1Open ↗
09/02/2026M00714025-P1Open ↗
08/26/2026M01079753-I1Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
08/20/2014122081433Open ↗
04/28/2014121935380Open ↗
01/31/2014121752709Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
10/14/2014122111311Open ↗
04/13/2011120658010Open ↗
07/09/2008110288929Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/18/2017121238598Open ↗
11/14/2016122922515Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
04/26/2013121512194Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
04/03/2014121914599Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/01/2011120590495Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/02/2026M00714025-I1Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
11/16/2017122922515Open ↗
08/24/2017121238598Open ↗
05/23/2017121238598Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/16/2017122922515Open ↗
08/24/2017121238598Open ↗
10/28/2014121935380Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
04/26/2013121512194Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/26/2013140088624Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/16/2017122922515Open ↗
10/03/2017121238598Open ↗
08/11/2015140088624Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
06/25/2012121117567Open ↗
04/13/2011120658010Open ↗
01/31/2011120590495Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/26/2026M01084044-I1Open ↗
08/26/2026M01079753-I1Open ↗
08/13/2026M01022522-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
03/07/2013120590495Open ↗
03/07/2013120590495Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/03/2013120658010Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
11/16/2017122922515Open ↗
11/16/2017122922515Open ↗
10/03/2017121238598Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms26
▸BISEFILING COVER SHEET12
05/23/2017121238598Open ↗
11/14/2016122922515Open ↗
10/14/2014122111311Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION9
09/11/2017121238598Open ↗
08/24/2017122922515Open ↗
07/25/2017122922515Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM3
11/16/2017122922515Open ↗
10/03/2017121238598Open ↗
08/16/2017122922515Open ↗
▸BISeFiling Job Application Cover Sheet2
06/25/2012121117567Open ↗
06/26/2013140088624Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01022522-S1Open ↗