Elevator apt, fireproof without stores
Cooper Park (NYCHA)
280 FROST STREET · BIN 3332781
💬 Discuss this project
1950Year Built
8Stories
D3Building Class
R6Zoning
611,340 sfGross Floor Area
700Units
LL97 Covered12 Active Violations 8 unresolved · 4 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 510,960 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade Inspection Safety Program rope access1p · 1 filing · 3 docs
Floor 1State Phase II a Boiler Replacement and Hot Water HeatersUnder Construction1p · 1 filing · 20 docs
MezzanineState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction1p · 1 filing · 20 docs
CellarState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction110p · 2 filings · 20 docs
Site & exteriorState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction54p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering2002/26/2026
Ismael Leyva Architect's510/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tarek M. Zeid, P.E1303/21/2026
Smep Design & Consultation203/21/2026
Tarek M Zeid P E1303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic USGeneral Contractor1607/08/2026
Dynamic ContractingPlumbing707/08/2026
Skyline P & HPlumbing203/22/2026
Eia ElectricElectrical103/22/2026
Jemco Electric ContractorsElectrical103/22/2026
Polaris Electrical ConstructionElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Distinct Engineering Solu26412502/26/2026
Building Lifecycle
All (130)Filed (26)Permit Issued (19)Signed Off (1)Facade (FISP) (14)Violation (23)Inspection (3)Objection (14)Special Inspection (30)
06/11/2026
Signed off — Alteration
B01129632-I1
06/09/2026
Permit issued — Suspended Scaffold
B01129632-I1-SC
04/21/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/26/2026
Filed — Alteration
Building 3 - Removal of existing hot water tank, cold water supply and hot water supply/return to the tank. New gas water heaters, expansion tank, hot water recirculation pumps and associated valves. Install gas piping to new water heaters.
B00446807-P6
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
02/24/2026
Special inspection requirement — Post-installed Anchors
Ramnarayan Tirumala
02/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2026
Permit issued — General Construction
B00448967-S4-GC
02/03/2026
Permit issued — Plumbing
B00446807-I1-PL
01/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/22/2025
Special inspection requirement — Heating Systems
YAZAN YANES
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
YAZAN YANES
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
YAZAN YANES
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
YAZAN YANES
12/22/2025
Special inspection requirement — Chimneys and vents
YAZAN YANES
12/22/2025
Special inspection requirement — Mechanical Systems
YAZAN YANES
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YAZAN YANES
12/22/2025
Special inspection requirement — Final
YAZAN YANES
12/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/02/2025
Filed — Alteration
NYCHA BOILER- Bldg 3: Natural Gas piping will run underground from gas meter room and domestic hot water heater rooms
B00448967-A5
12/01/2025
Permit issued — Mechanical Systems
B00448967-I1-MS
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Heating Systems
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Chimneys and vents
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Mechanical Systems
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Final
Ramnarayan Tirumala
09/19/2025
Permit issued — Structural
B00448967-S1-ST
08/27/2025
Special inspection requirement — Concrete - Cast-In-Place
YAZAN YANES
08/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
YAZAN YANES
08/27/2025
Special inspection requirement — Structural Steel - Details
YAZAN YANES
08/27/2025
Special inspection requirement — Post-installed Anchors
YAZAN YANES
08/27/2025
Special inspection requirement — Structural Steel - Welding
YAZAN YANES
08/27/2025
Special inspection requirement — Structural Steel - High Strength Bolting
YAZAN YANES
08/27/2025
Special inspection requirement — Masonry
YAZAN YANES
08/27/2025
Special inspection requirement — Final
YAZAN YANES
08/20/2025
Objection resolved — Addressed
08/18/2025
Objection raised — Structural
08/12/2025
Filed — Alteration
NYCHA BOILER- Bldg 3: Natural Gas piping will run underground from gas meter room and domestic hot water heater rooms
B00448967-A4
07/10/2025
Filed — Alteration
NYCHA BOILER- Bldg 3: Natural Gas piping will run underground from gas meter room and domestic hot water heater rooms
B00448967-A2
07/03/2025
Filed — Alteration
Building 3 - Removal of existing hot water tank, cold water supply and hot water supply/return to the tank. New gas water heaters, expansion tank, hot water recirculation pumps and associated valves. Install gas piping to new water heaters.
B00446807-P5
07/03/2025
Filed — Alteration
NYCHA BOILER- Bldg 3: Natural Gas piping will run underground from gas meter room and domestic hot water heater rooms
B00448967-A3
06/24/2025
Special inspection requirement — Maintenance information
06/24/2025
Special inspection requirement — Permanent certificate
04/18/2025
Filed — Alteration
NYCHA BOILER- Bldg 3: Natural Gas piping will run underground from gas meter room and domestic hot water heater rooms
B00448967-A1
03/06/2025
Permit issued — General Construction
B00448967-S4-GC
02/05/2025
Permit issued — Plumbing
B00446807-I1-PL
12/13/2024
Permit issued — Suspended Scaffold
B01129632-I1-SC
11/19/2024
Filed — Alteration
NYCHA BOILER- Bldg 3: Natural Gas piping will run underground from gas meter room and domestic hot water heater rooms
B00448967-P9
11/18/2024
Filed — Alteration
B01129632-I1
10/23/2024
Filed — Alteration
NYCHA BOILER- Bldg 3: Natural Gas piping will run underground from gas meter room and domestic hot water heater rooms
B00448967-P8
09/13/2024
Permit issued — General Construction
B00448967-S3-GC
07/10/2024
Permit issued — Mechanical Systems
B00448967-I1-MS
07/10/2024
Permit issued — Structural
B00448967-S1-ST
06/20/2024
Objection resolved — Addressed
06/05/2024
Objection raised — Scope
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/09/2026
DOB NOWGeneral ConstructionPermit IssuedDynamic US02/04/2026
DOB NOWPlumbingSigned-offDynamic Contracting02/03/2026
DOB NOWMechanical SystemsPermit IssuedDynamic US12/01/2025
DOB NOWStructuralPermit IssuedDynamic US09/19/2025
DOB NOWGeneral ConstructionPermit IssuedDynamic US03/06/2025
DOB NOWPlumbingSigned-offDynamic Contracting02/05/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/13/2024
DOB NOWGeneral ConstructionPermit IssuedDynamic US09/13/2024
DOB NOWMechanical SystemsPermit IssuedDynamic US07/10/2024
DOB NOWStructuralPermit IssuedDynamic US07/10/2024
DOB NOWPlumbingPermit IssuedDynamic Contracting05/17/2024
DOB NOWGeneral ConstructionPermit IssuedDynamic US04/05/2024
DOB NOWPlumbingSigned-offDynamic Contracting01/09/2024
DOB NOWGeneral ConstructionPermit IssuedDynamic US08/18/2023
DOB NOWMechanical SystemsPermit IssuedDynamic US08/08/2023
DOB NOWStructuralPermit IssuedDynamic US08/03/2023
DOB NOWPlumbingPermit IssuedDynamic Contracting06/14/2023
DOB NOWGeneral ConstructionPermit IssuedDynamic US05/04/2023
BISOTISSUEDM.S.T. General Contracting03/05/2015
BISOTISSUEDM.S.T. General Contracting10/20/2014
BISOTISSUEDM.S.T. General Contracting06/19/2014
BISEQISSUEDM.S.T. General Contracting05/02/2014
BISEQISSUEDM.S.T. General Contracting04/29/2014
BISEQISSUEDM.S.T. General Contracting04/29/2014
BISEQISSUEDMetropolitan Enterprises02/26/2014
BISEQISSUEDMetropolitan Enterprises05/07/2013
BISEQISSUEDMetropolitan Enterprises05/07/2012
BISEQISSUEDMetropolitan Enterprises05/20/2011
BISEQISSUEDMetropolitan Enterprises05/27/2010
BISPLISSUEDParkset Plumbing Co04/22/1997
BISOTISSUED4A General Contracting04/02/1997
BISOTISSUEDA.H.A. General Construction03/06/1995
BISPLISSUEDDelphi Plumbing & Heating11/23/1994
1 project · most recent 12/02/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2025Permit IssuedDynamic USHeating Systems
Heating
U.S. Draft Co. TRV-8 205 CFM · Exhaust Fan ×5
2 projects · most recent 02/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/26/2026Signed-offDynamic ContractingGas, Water/Sanitary
12/02/2025Permit IssuedDynamic ContractingGas
7 projects · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026CompletePolaris Electrical ConstructionGeneral Wiring
04/01/2025CompletePolaris Electrical Construction—
12/31/2024CancelledDynamic Electric SystemGeneral Wiring
02/22/2023Permit IssuedTru-Val ElectricGeneral Wiring
07/19/2021Permit IssuedEia ElectricGeneral Wiring
10/08/2020CompleteJemco Electric Contractors—
09/11/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
1 project · most recent 12/02/2025
Steel Concrete Masonry
FiledStatusContractorScope
12/02/2025Permit IssuedDynamic USSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
02/24/2026Post-installed AnchorsRamnarayan Tirumalaspecial
02/24/2026Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
12/22/2025Chimneys and ventsYAZAN YANESspecial
12/22/2025FinalYAZAN YANESprogress
12/22/2025Energy Code Compliance InspectionsYAZAN YANESprogress
12/22/2025HVAC-R and service water heating equipmentYAZAN YANESenergy_progress
12/22/2025HVAC-R and service water heating system controlsYAZAN YANESenergy_progress
12/22/2025HVAC-R and service water piping design and insulationYAZAN YANESenergy_progress
12/22/2025Heating SystemsYAZAN YANESspecial
12/22/2025Fire-Resistant Penetrations and JointsYAZAN YANESspecial
12/22/2025Mechanical SystemsYAZAN YANESspecial
10/03/2025HVAC-R and service water heating system controlsRamnarayan Tirumalaenergy_progress
10/03/2025HVAC-R and service water piping design and insulationRamnarayan Tirumalaenergy_progress
10/03/2025Chimneys and ventsRamnarayan Tirumalaspecial
10/03/2025HVAC-R and service water heating equipmentRamnarayan Tirumalaenergy_progress
10/03/2025FinalRamnarayan Tirumalaprogress
10/03/2025Energy Code Compliance InspectionsRamnarayan Tirumalaprogress
10/03/2025Mechanical SystemsRamnarayan Tirumalaspecial
10/03/2025Heating SystemsRamnarayan Tirumalaspecial
10/03/2025Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
08/27/2025Structural Steel - DetailsYAZAN YANESspecial
08/27/2025Structural Steel - WeldingYAZAN YANESspecial
08/27/2025Structural Stability – Alterations of existing buildingsYAZAN YANESspecial
08/27/2025Concrete - Cast-In-PlaceYAZAN YANESspecial
08/27/2025MasonryYAZAN YANESspecial
Latest 25 of 110.
▾Documents — 256 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch14
08/23/2026B01129632-I1Request digital key ↗
08/19/2026B00448967-A2Request digital key ↗
08/19/2026B00448967-P8Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
08/19/2026B00448967-A3Request digital key ↗
08/19/2026B00448967-A1Request digital key ↗
08/19/2026B00448967-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/18/2026B00446807-I1Request digital key ↗
08/18/2026B00446807-P6Request digital key ↗
08/18/2026B00446807-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION10
06/24/2014320831169Open ↗
05/31/2014320097881Open ↗
04/29/2014340136702Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
05/09/2018321755597Open ↗
09/18/2014320831169Open ↗
04/29/2014340136702Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications86
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/19/2026B00448967-A2Open ↗
08/19/2026B00448967-A1Open ↗
08/19/2026B00448967-P9Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
05/08/2015320831169Open ↗
05/08/2015320831169Open ↗
04/07/2015320831169Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026B00448967-A5Open ↗
09/02/2026B00448967-A5Open ↗
09/01/2026B00448967-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B00448967-A5Open ↗
09/01/2026B00448967-I1Open ↗
09/01/2026B00448967-S4Open ↗
Showing 3 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/29/2014340136702Open ↗
—340136695Open ↗
—340136686Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/29/2014340136702Open ↗
—340136686Open ↗
—340136695Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/29/2014340136702Open ↗
—340136695Open ↗
—340136686Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/23/2009320097881Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/23/2009320097881Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
01/16/2019321755597Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
08/19/2026B00448967-A2Open ↗
08/19/2026B00448967-A1Open ↗
08/19/2026B00448967-P9Open ↗
Showing 3 of 24 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
06/24/2014320831169Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/23/2009320097881Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/09/2018321755597Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/08/2015320831169Open ↗
▸Energy Compliance8
▸BISTR8: Energy Code Progress Inspections3
09/25/2014320831169Open ↗
09/25/2014320831169Open ↗
08/15/2013320831169Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/08/2015320831169Open ↗
04/07/2015320831169Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/08/2015320831169Open ↗
04/07/2015320831169Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/29/2014340136702Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/29/2014340136702Open ↗
—340136686Open ↗
—340136695Open ↗
▸Approvals, Objections & Sign-offs70
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
08/19/2026B00448967-A3Open ↗
08/19/2026B00448967-A2Open ↗
08/19/2026B00448967-A1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
08/13/2026B00446807-I1Open ↗
08/13/2026B00448967-A5Open ↗
08/13/2026B00448967-A3Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST7
02/04/2015340136686Open ↗
02/04/2015340136702Open ↗
02/04/2015340136695Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026B00448967-S1Open ↗
08/13/2026B00448967-S2Open ↗
08/13/2026B00448967-S3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/19/2026B00448967-I1Open ↗
08/19/2026B00448967-S3Open ↗
08/19/2026B00448967-S2Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/11/2014320097881Open ↗
05/09/2013320097881Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/15/2013320831169Open ↗
11/23/2009320097881Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
01/30/2019321755597Open ↗
05/09/2018321755597Open ↗
05/08/2015320831169Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET3
05/09/2018321755597Open ↗
08/24/2013320831169Open ↗
11/23/2009320097881Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
04/29/2014340136702Open ↗
—340136686Open ↗
—340136695Open ↗
▸BISADDITIONAL INFORMATION2
10/24/2014320831169Open ↗
09/18/2014320831169Open ↗
▸BISBOROUGH INTAKE FORM1
01/30/2019321755597Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01129632-I1Open ↗