💬 Discuss this project
1993Year Built
2Stories
W5Building Class
R3-2Zoning
633,280 sfGross Floor Area
20Units
29 Active Violations 1 unresolved · 28 paperwork only 2 likely answered ▸FDNY Report ↗
City university · Owner of record: Dormitory Authority of the State of New York · 8,838,314 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
StructuralMechanicalCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
PenthouseCUNY College of Staten Island1 filing
Floor 2CUNY College of Staten Island1 filing
Floor 1CUNY College of Staten Island3p · 2 filings · 6 docs
CellarCUNY College of Staten IslandUnder Construction10p · 1 filing · 16 docs
Site & exteriorCUNY College of Staten IslandUnder Construction12p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dormitory Authority State of New1303/21/2026
CUNY809/13/2026
Dasny103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eme Group/Salas O'Brien105/20/2026
Superstructures Engineering + Architects103/31/2026
Ramboll210/14/2025
RP Engineering110/01/2025
Jorma Loci105/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nyccode603/21/2026
Doreen A. Rizzi, Consultant203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sierra Mechanical ContractingGeneral Contractor308/25/2026
KLK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins400310/14/2025
Building Lifecycle
All (50)Filed (6)Permit Issued (3)Violation (8)Objection (10)Special Inspection (23)
08/24/2026
Permit issued — Support of Excavation
S01203303-S1-SE
06/22/2026
Permit issued — Support of Excavation
S01203303-S1-SE
05/20/2026
Filed — Alteration
UPGRADES TO EXISTING HVAC AND VFD UNITS / ASSOC. DUCTS & PIPING IN BLDG. 1R AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
S01371263-I1
03/31/2026
Filed — Alteration
College of Staten Island, Bldg 2R, Flood Mitigation related improvements: Installing new depressed concrete pit & drain in front of entrances with minor plumbing connection work.
S01369979-I1
03/12/2026
Special inspection requirement — Final
03/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/12/2026
Special inspection requirement — Maintenance information
03/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
03/12/2026
Special inspection requirement — Mechanical Systems
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/12/2026
Special inspection requirement — Post-installed Anchors
03/10/2026
Special inspection requirement — Final
Paul Millman
11/13/2025
Objection resolved — Addressed
10/31/2025
Permit issued — Mechanical Systems
S01203303-I1-GC-CX
10/30/2025
Special inspection requirement — High Temperature Hot Water Piping (Welding)
NELSON LOPEZ
10/30/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
10/30/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
10/30/2025
Special inspection requirement — Final
DANIEL GORDON
10/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
10/22/2025
Objection raised — Admin
10/14/2025
Filed — Alteration
College of Staten Island, R1 Building- HTHW box tunnel replacement- associated mechanical and civil scopes of work. No change of use, egress or occupancy.
S01203303-P1
10/01/2025
Filed — Alteration
College of Staten Island, R1 Building- HTHW box tunnel replacement- associated mechanical and civil scopes of work. No change of use, egress or occupancy.
S01203303-S1
09/30/2025
Special inspection requirement — High Temperature Hot Water Piping (Welding)
NELSON LOPEZ
09/30/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
09/30/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
09/30/2025
Special inspection requirement — Final
DANIEL GORDON
09/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
08/25/2025
Violation issued (ECB, open)
Boilers
08/25/2025
Violation issued (ECB, open)
Boilers
07/30/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Admin
07/11/2025
Objection raised — Structural
07/11/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Admin
07/11/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Scope
07/11/2025
Objection resolved — Addressed
06/30/2025
Filed — Alteration
College of Staten Island, R1 Building- HTHW box tunnel replacement- associated mechanical and civil scopes of work. No change of use, egress or occupancy.
S01203303-I1
06/17/2021
Violation issued (ECB, open)
Boilers
06/17/2021
Violation issued (ECB, open)
Boilers
05/08/2019
Filed — No Work
S00163363-I1
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/19/2016
Violation issued (ECB, open)
Boilers
08/19/2016
Violation issued (ECB, open)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedSierra Mechanical Contracting08/24/2026
DOB NOWSupport of ExcavationPermit IssuedSierra Mechanical Contracting06/22/2026
DOB NOWMechanical SystemsPermit IssuedSierra Mechanical Contracting10/31/2025
BISPLISSUEDAgee Heating Service05/13/2024
BISPLISSUEDB.G. National P & H06/05/2018
BISOTISSUEDInfinity Contracting Service05/09/2018
BISOTISSUEDInfinity Contracting Service05/09/2018
BISMHISSUEDInfinity Contracting Service05/09/2018
BISOTISSUEDInfinity Contracting Service05/09/2018
BISOTISSUEDPyramid Network Services04/11/2017
BISOTISSUEDPyramid Network Services01/06/2017
BISOTISSUEDPrecision Roofing08/31/2016
BISEQISSUEDCarlitos Contracting08/30/2016
BISOTISSUEDC&M Door Controls09/16/2011
BISOTISSUEDG.M. Construction & Waterproof06/15/2010
BISEQISSUEDBiltmore General Contractors07/07/2009
BISOTISSUEDBiltmore General Contractors07/06/2009
BISOTISSUEDBiltmore General Contractors07/06/2009
BISOTISSUEDBiltmore General Contractors12/04/2008
BISOTISSUEDDalmar Contracting09/26/2005
BISMHISSUEDDynamic Contracting09/26/2005
BIS—ISSUEDN/A10/16/2001
BISSPISSUEDGrinnell Fire Protection Systems07/22/1997
BISSPISSUEDGrinnell Fire Protection Systems10/11/1995
1 project · most recent 05/15/2018
General Wiring
FiledStatusContractorScope
05/15/2018CompleteLevest ElectricGeneral Wiring
1 project · most recent 10/14/2025
FiledStatusContractorScope
10/14/2025Permit IssuedSierra Mechanical Contracting2 scope_items
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/12/2026Final—progress
03/12/2026HVAC-R and service water piping design and insulation—energy_progress
03/12/2026HVAC-R and service water heating equipment—energy_progress
03/12/2026HVAC-R and service water heating system controls—energy_progress
03/12/2026Maintenance information—energy_progress
03/12/2026Duct leakage testing, insulation and design—energy_progress
03/12/2026Energy Code Compliance Inspections—progress
03/12/2026Mechanical Systems—special
03/12/2026Fire-Resistant Penetrations and Joints—special
03/12/2026Post-installed Anchors—special
03/10/2026FinalPaul Millmanprogress
10/30/2025High Temperature Hot Water Piping (Welding)NELSON LOPEZspecial
10/30/2025Post-installed AnchorsNELSON LOPEZspecial
10/30/2025Mechanical SystemsNELSON LOPEZspecial
10/30/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
10/30/2025FinalDANIEL GORDONprogress
10/30/2025HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
09/30/2025High Temperature Hot Water Piping (Welding)NELSON LOPEZspecial
09/30/2025Mechanical SystemsNELSON LOPEZspecial
09/30/2025Post-installed AnchorsNELSON LOPEZspecial
09/30/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
09/30/2025FinalDANIEL GORDONprogress
09/30/2025HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CUNY College of Staten IslandEducationCellar, Floors 1, 2, Penthouse
Project S01371263 Alteration · Approved · 05/20/2026
Project S01369979 Alteration · Approved · 03/31/2026
Project S01203303 Alteration · Permit Entire · 06/30/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/18/2026S01203303-I1Request digital key ↗
08/18/2026S01203303-P1Request digital key ↗
08/18/2026S01203303-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/26/2026S00163363-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION24
01/15/2026520285165Open ↗
10/23/2025520285165Open ↗
02/28/2025520285165Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION16
05/14/2024520285165Open ↗
06/08/2018520285165Open ↗
05/11/2018520285165Open ↗
Showing 3 of 16 on file for this type
▸BISPLACE OF ASSEMBLY1
05/19/2009520004986Open ↗
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
05/11/2018520285165Open ↗
05/11/2018520285165Open ↗
05/11/2018520285165Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026S01203303-P1Open ↗
09/02/2026S01203303-P1Open ↗
09/02/2026S01203303-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026S00163363-I1Open ↗
08/18/2026S01203303-I1Open ↗
08/17/2026S01369979-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/22/2016520287449Open ↗
07/22/2011520072215Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/22/2016520287449Open ↗
08/25/2016540110878Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026S01203303-P1Open ↗
08/29/2026S01203303-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/25/2016540110878Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/25/2016540110878Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/22/2011520072215Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
01/15/2026520285165Open ↗
10/23/2025520285165Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
03/09/2021520290621Open ↗
11/16/2017520285165Open ↗
▸BISHEATING SYSTEMS1
09/06/2023520285165Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/09/2016520285165Open ↗
▸Environmental & Asbestos10
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
07/22/2011520072215Open ↗
11/06/2008510059464Open ↗
11/05/2008510059311Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/11/2018520285165Open ↗
03/22/2018520290621Open ↗
12/22/2016520287449Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026S01203303-I1Open ↗
08/17/2026S01369979-I1Open ↗
08/13/2026S01203303-P1Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
05/11/2018520285165Open ↗
04/09/2018520213171Open ↗
04/09/2018520213171Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/14/2023520285165Open ↗
08/14/2023520285165Open ↗
08/14/2023520285165Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/17/2018520213171Open ↗
04/16/2018520213171Open ↗
09/06/2017520287449Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/06/2023520285165Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/06/2023520285165Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/26/2023520285165Open ↗
▸BISELECTRIC MOTORS1
09/06/2023520285165Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/26/2023520285165Open ↗
08/25/2016540110878Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/06/2023520285165Open ↗
▸BISMECHANICAL SYSTEMS1
09/06/2023520285165Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
09/06/2023520285165Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/06/2023520285165Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/06/2023520285165Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/06/2023520285165Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/02/2022520290621Open ↗
03/21/2019520213171Open ↗
04/17/2018520213171Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
12/22/2016520287449Open ↗
12/09/2016520285165Open ↗
11/18/2014520213171Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/26/2026S00163363-I1Open ↗
08/18/2026S01203303-I1Open ↗
08/13/2026S01369979-I1Open ↗
Showing 3 of 5 on file for this type
▸BISHEALTH DEPARTMENT APPROVAL1
02/14/2024520285165Open ↗
▸BISFINAL1
09/06/2023520285165Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT20
07/26/2023520285165Open ↗
11/23/2022520290621Open ↗
11/23/2022520290621Open ↗
Showing 3 of 20 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/13/2024520285165Open ↗
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET11
03/22/2018520290621Open ↗
12/22/2016520287449Open ↗
12/09/2016520285165Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION6
07/23/2025520285165Open ↗
09/11/2024520285165Open ↗
08/22/2023520285165Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
05/14/2024520285165Open ↗
04/17/2018520213171Open ↗
04/09/2018520213171Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/25/2016540110878Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/22/2018520290621Open ↗
12/09/2016520285165Open ↗
▸BISECCCNYS ANALYSIS1
12/09/2016520285165Open ↗
▸BISMAINTENANCE INFORMATION1
09/06/2023520285165Open ↗