282 4 AVENUE
BROOKLYN · BIN 3430459
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Open Violations 0 unresolved · 2 paperwork only ▸
Locations of Work
StructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 20 docs
Floor 14Under Construction1 filing · 20 docs
Floor 13Under Construction1 filing · 20 docs
Floor 12Under Construction1 filing · 20 docs
Floor 11Under Construction1 filing · 20 docs
Floor 10Under Construction1 filing · 20 docs
Floor 9Under Construction1 filing · 20 docs
Floor 8Under Construction1 filing · 20 docs
Floor 7Under Construction1 filing · 20 docs
Floor 6Under Construction1 filing · 20 docs
Floor 5Under Construction1 filing · 20 docs
Floor 4Under Construction1 filing · 20 docs
Floor 3Under Construction1 filing · 20 docs
Floor 2Under Construction1 filing · 20 docs
Floor 1Under Construction1 filing · 20 docs
CellarUnder Construction1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRUKLYN BUILDERS409/26/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRUKLYN BUILDERS INCGeneral Contractor309/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161508/19/2026
VALJATO ENGINEERING PC2486112/16/2025
Z & T ENGINEERING, P.C.591106/08/2022
Building Lifecycle
All (119)Filed (26)Permit Issued (14)Signed Off (8)Violation (15)Objection (26)Special Inspection (30)
09/25/2026
Permit issued — Mechanical Systems
B00751849-Z1-MS
09/24/2026
Permit issued — Structural
B00751849-S5-ST
09/14/2026
Permit issued — General Construction
B01428489-I1-GC
09/01/2026
Objection resolved — Addressed
08/19/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00751849-A2
08/13/2026
Objection raised — Cost
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/27/2026
Objection raised — Scope
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/13/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR REMOVAL OF EXISTING NON-STRUCTURAL EXTERIOR WALL AS PER PLANS.
B01428489-I1
07/13/2026
Special inspection requirement — Final
FAHAD FATEH
06/23/2026
Signed off — Alteration
B01334616-I1
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/19/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
06/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/18/2026
Signed off — Alteration
B01186499-I1
06/18/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00751849-S4
06/18/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00751849-S2
06/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01173000-I1
06/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01186467-I1
06/17/2026
Objection resolved — Addressed
06/16/2026
Objection raised — Other
06/12/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00751849-A1
06/12/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00751849-P9
06/11/2026
Violation issued (ECB, open)
Construction
06/11/2026
Violation issued (ECB, open)
Construction
06/09/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
06/09/2026
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
06/09/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/09/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/07/2026
Violation issued (ECB, closed)
Construction
06/07/2026
Violation issued (ECB, closed)
Construction
06/07/2026
Violation issued (ECB, closed)
Construction
06/07/2026
Violation issued (ECB, closed)
Unknown
05/27/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00751849-S3
04/21/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/21/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
04/21/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/21/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/21/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/21/2026
Special inspection requirement — Metering
FAHAD FATEH
04/21/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
04/21/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/21/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
04/21/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/21/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
04/21/2026
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBRUKLYN BUILDERS INC09/25/2026
DOB NOWStructuralPermit IssuedBRUKLYN BUILDERS INC09/24/2026
DOB NOWGeneral ConstructionSigned-offBRUKLYN BUILDERS INC09/14/2026
DOB NOWProtection and Mechanical MethodsSigned-offBRUKLYN BUILDERS INC04/08/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/26/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/25/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/18/2026
DOB NOWProtection and Mechanical MethodsSigned-offBRUKLYN BUILDERS INC02/06/2026
DOB NOWStructuralPermit IssuedBRUKLYN BUILDERS INC12/01/2025
DOB NOWStructuralPermit IssuedBRUKLYN BUILDERS INC11/19/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/30/2025
DOB NOWConstruction FenceSigned-offBRUKLYN BUILDERS INC11/25/2024
DOB NOWFoundationPermit IssuedDLC DEVELOPMENT CORP06/13/2022
1 job · most recent 08/19/2026
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedBRUKLYN BUILDERS INCGenerators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM2 3 tons · Condensing Unit ×48
SUZ-KA24NA2 2 tons · Condensing Unit ×18
SUZ-KA36NA2 3 tons · Condensing Unit ×18
MXZ-SM48NAM2 4 tons · Condensing Unit ×14
MUZ-GS12NA 1 tons · Condensing Unit ×1
MXZ-SM60NAM2 5 tons · Condensing Unit ×2
Ventilation
Lf Systems DEF015 1,000 CFM · Exhaust Fan ×4
Greenheck ERVE-45-30L 4,265 CFM · Erv ×2
Generators
Gillette SP-410-3-2 40 kW · Generator ×4
1 job · most recent 08/19/2026
Sprinkler System
FiledStatusContractorScope
08/19/2026Permit IssuedTARGET PIPING NY LLCSprinkler System
1 job · most recent 08/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2026Permit IssuedTARGET PIPING NY LLCGas, Storm, Water/Sanitary
7 jobs · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
05/11/2026Permit IssuedPOWER DIRECT ELECTRIC INC—
02/19/2026CancelledPOWER DIRECT ELECTRIC INC—
08/28/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
03/08/2025Permit IssuedSOLAS ELECTRICAL CORP—
01/28/2025Permit IssuedSOLAS ELECTRICAL CORP—
01/21/2025CompletePOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
2 jobs · most recent 08/19/2026
Concrete
FiledStatusContractorScope
08/19/2026Permit IssuedBRUKLYN BUILDERS INCConcrete
06/08/2022Permit IssuedDLC DEVELOPMENT CORP1 scope_items
1 job · most recent 08/19/2026
Fence
FiledStatusContractorScope
08/19/2026Permit IssuedBRUKLYN BUILDERS INCFence
1 job · most recent 06/08/2022
Earthwork
FiledStatusContractorScope
06/08/2022Permit IssuedDLC DEVELOPMENT CORPEarthwork
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
07/13/2026FinalFAHAD FATEHprogress
06/19/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/19/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/19/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/19/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/19/2026Maintenance informationFAHAD FATEHenergy_progress
06/19/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
06/09/2026Seismic Isolation SystemsFAHAD FATEHspecial
06/09/2026Sprinkler SystemsFAHAD FATEHspecial
06/09/2026Standpipe SystemsFAHAD FATEHspecial
06/09/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/09/2026Post-installed AnchorsFAHAD FATEHspecial
04/21/2026Maintenance informationFAHAD FATEHenergy_progress
04/21/2026MeteringFAHAD FATEHenergy_progress
04/21/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/21/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
04/21/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/21/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
04/21/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/21/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
04/21/2026Exterior lighting powerFAHAD FATEHenergy_progress
04/21/2026Fenestration air leakageFAHAD FATEHenergy_progress
04/21/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
04/21/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
04/21/2026Air barrier continuity plan testingFAHAD FATEHenergy_progress
Latest 25 of 113.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/29/2026B00751849-A2Request digital key ↗
08/29/2026B00753277-I1Request digital key ↗
08/23/2026B01173000-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits2
▸DOB NOWHPD - Permit Notice2
08/13/2026B00751849-I1Open ↗
08/13/2026B00753277-I1Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026B00751849-I1Open ↗
08/13/2026B00751849-I1Open ↗
08/13/2026B00751849-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00751849-P3Open ↗
08/13/2026B00751849-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00751849-I1Open ↗
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/29/2026B00751849-A2Open ↗
08/22/2026B01186499-I1Open ↗
08/22/2026B01186467-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/01/2026B00751849-P9Open ↗
09/01/2026B00751849-S9Open ↗
09/01/2026B00751849-Z1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/27/2026B01428489-I1Open ↗
09/01/2026B00751849-Z1Open ↗
09/01/2026B00751849-Z1Open ↗
Showing 3 of 15 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00751849-P3Open ↗
08/13/2026B00751849-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026B00751849-I1—
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Sign Off1
08/17/2026B00751849-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00751849-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/13/2026B00751849-S4Open ↗
▸Other Documents8
▸DOB NOWAdjoining Owners Notification3
08/13/2026B00753277-I1Open ↗
08/13/2026B00751849-S4Open ↗
08/13/2026B00751849-S3Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026B00751849-I1Open ↗
08/17/2026B00751849-P5Open ↗
08/17/2026B00751849-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00751849-P3Open ↗
08/13/2026B00751849-I1Open ↗