Elevator apt, fireproof without stores
Marble Hill (NYCHA)
2831 EXTERIOR STREET · BIN 2092481
💬 Discuss this project
1950Year Built
14Stories
D3Building Class
R6Zoning
439,700 sfGross Floor Area
465Units
LL97 Covered3 Active Violations 2 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 162,000 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsFacade restoration, lintel and parapet replacementUnder Construction1 filing
RoofRoof replacement and rooftop structure restoration10p · 1 filing · 3 docs
CellarNYC Housing Authority6p · 2 filings · 20 docs
Site & exteriorNYC Housing AuthorityUnder Construction6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority7310/16/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services1003/21/2026
Bazini Engineering P C1003/21/2026
LGML Group203/21/2026
Joel Phagoo P.E103/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steel ConstructionScaffold2710/04/2026
MNK EnterprisesScaffold1510/16/2026
Dynamic USGeneral Contractor307/08/2026
Skyworx ContractingScaffold204/09/2026
Dynamic ContractingPlumbing207/08/2026
Skyline P & HPlumbing203/22/2026
P & K ContractingScaffold107/08/2026
P & K ContractingGeneral Contractor107/10/2026
Era-Lor Electric ContgElectrical103/21/2026
Lit Mode Electrical ContgElectrical103/21/2026
Csi Sec & ElectricElectrical103/22/2026
Gustave Dileo, JRElectrical103/21/2026
Jethro J. AntoineElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bureau Veritas Na6902309/30/2026
Joel Phagoo, PE2416308/11/2026
Tectonic Engineering Cons106503/07/2024
Building Lifecycle
All (131)Filed (18)Permit Issued (36)Signed Off (4)Facade (FISP) (15)Violation (17)Inspection (5)Objection (6)Special Inspection (30)
10/15/2026
Permit issued — Sidewalk Shed
X08027319-I1-SH
09/30/2026
Filed — Alteration
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing. No change in use, egress or occupancy under this application.
X01270877-P2
09/27/2026
Special inspection requirement — Masonry
IBRAHIM MOURAD
09/27/2026
Special inspection requirement — Final
IBRAHIM MOURAD
09/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
09/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
09/27/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
09/01/2026
Filed — Alteration
Roof replacement and rooftop structure restoration per plans herewith. no change in egress of occupancy
X01447280-I1
08/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/28/2026
Special inspection requirement — Masonry
08/28/2026
Special inspection requirement — Post-installed Anchors
08/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/28/2026
Special inspection requirement — Concrete - Cast-In-Place
08/19/2026
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
08/17/2026
Special inspection requirement — Final
08/11/2026
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01374298-P1
08/11/2026
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
07/16/2026
Permit issued — Construction Fence
X08027334-I1-FN
07/14/2026
Permit issued — Sidewalk Shed
X08027319-I1-SH
07/08/2026
Permit issued — General Construction
X01270877-I1-GC
04/02/2026
Permit issued — Suspended Scaffold
X01374298-I1-SC
04/01/2026
Filed — Alteration
X08027334-P1
03/25/2026
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01374298-I1
02/02/2026
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR EXTERIOR RESTORATION, ROOFING REPLACEMENT & INSPECTIONS. SUSPENDED SCAFFOLD & MAT. HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01255933-I1
01/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
01/12/2026
Special inspection requirement — Final
IBRAHIM MOURAD
01/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
01/12/2026
Special inspection requirement — Masonry
IBRAHIM MOURAD
01/12/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
01/04/2026
Filed — Alteration
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing. No change in use, egress or occupancy under this application.
X01270877-P1
12/16/2025
Permit issued — Sidewalk Shed
X00056039-I1-SH
11/12/2025
Cycle 10 facade report submitted
11/12/2025
Cycle 10 facade report signed — UNSAFE
10/28/2025
Cycle 10 facade inspection completed
08/25/2025
Filed — Alteration
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing. No change in use, egress or occupancy under this application.
X01270877-I1
07/18/2025
Permit issued — Suspended Scaffold
X01255933-I1-SC
07/18/2025
Objection raised — Other
07/18/2025
Objection resolved — Addressed
07/17/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR EXTERIOR RESTORATION, ROOFING REPLACEMENT & INSPECTIONS. SUSPENDED SCAFFOLD & MAT. HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01255933-I1
07/15/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
07/11/2025
Permit issued — Construction Fence
X08027334-I1-FN
07/11/2025
Permit issued — Sidewalk Shed
X08027319-I1-SH
05/21/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2024
Permit issued — Sidewalk Shed
X00056039-I1-SH
08/06/2024
Signed off — Alteration
NYCHA BOILER - MARBLE HILL HOUSES, BUILDING 5 - INSTALL NEW SPECIAL GAS VENTS ON THE TWO (2) NEW GAS FIRED HOT WATER HEATERS, AS PER PLANS. INSTALL NEW FIRE RATED DOOR, CONCRETE PAD AND FILL EXISTING WALL OPENINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00664240-I1
08/06/2024
Signed off — Alteration
NYCHA BOILER - MARBLE HILL HOUSES, BUILDING 5 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00664226-I1
07/05/2024
Permit issued — Sidewalk Shed
X08027319-I1-SH
06/28/2024
Permit issued — Construction Fence
X08027334-I1-FN
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/20/2024
Objection raised — Admin
03/20/2024
Objection raised — Admin
03/07/2024
Filed — Alteration
NYCHA BOILER - MARBLE HILL HOUSES, BUILDING 5 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00664226-P2
02/01/2024
Permit issued — Sidewalk Shed
X08027319-I1-SH
02/01/2024
Permit issued — Construction Fence
X08027334-I1-FN
01/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises10/15/2026
DOB NOWConstruction FencePermit IssuedMNK Enterprises07/16/2026
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises07/14/2026
DOB NOWGeneral ConstructionPermit IssuedP & K Contracting07/08/2026
DOB NOWSuspended ScaffoldPermit IssuedVenture NK04/02/2026
DOB NOWSidewalk ShedPermit IssuedSteel Construction12/16/2025
DOB NOWSuspended ScaffoldSigned-offZoria Housing07/18/2025
DOB NOWConstruction FencePermit IssuedMNK Enterprises07/11/2025
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises07/11/2025
DOB NOWSidewalk ShedPermit IssuedSteel Construction11/21/2024
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises07/05/2024
DOB NOWConstruction FencePermit IssuedMNK Enterprises06/28/2024
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises02/01/2024
DOB NOWConstruction FencePermit IssuedMNK Enterprises02/01/2024
DOB NOWMechanical SystemsSigned-offDynamic US11/21/2023
DOB NOWSidewalk ShedPermit IssuedSteel Construction11/16/2023
DOB NOWPlumbingSigned-offDynamic Contracting10/25/2023
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises03/02/2023
DOB NOWConstruction FencePermit IssuedMNK Enterprises03/01/2023
DOB NOWGeneral ConstructionSigned-offDynamic US12/21/2022
DOB NOWConstruction FencePermit IssuedSkyworx Contracting11/12/2022
DOB NOWSidewalk ShedPermit IssuedSkyworx Contracting11/10/2022
DOB NOWSidewalk ShedPermit IssuedSteel Construction11/09/2022
DOB NOWConstruction FencePermit IssuedCapital Contracting P&H11/09/2022
DOB NOWPlumbingSigned-offDynamic Contracting10/12/2022
DOB NOWSidewalk ShedPermit IssuedSteel Construction11/18/2021
DOB NOWConstruction FencePermit IssuedSteel Construction11/16/2021
DOB NOWConstruction FencePermit IssuedSteel Construction06/22/2021
DOB NOWSidewalk ShedPermit IssuedSteel Construction11/27/2020
DOB NOWConstruction FencePermit IssuedSteel Construction06/24/2020
DOB NOWSidewalk ShedPermit IssuedSteel Construction11/21/2019
DOB NOWSidewalk ShedPermit IssuedSteel Construction09/06/2019
DOB NOWConstruction FenceSigned-offP & K Contracting10/19/2018
DOB NOWSidewalk ShedPermit IssuedSteel Construction09/18/2018
DOB NOWSidewalk ShedPermit IssuedSteel Construction08/23/2018
DOB NOWSidewalk ShedPermit IssuedSteel Construction06/25/2018
BISEQISSUEDZoria Housing07/29/2010
BISEQISSUEDZoria Housing06/28/2010
BISEQISSUEDNavtech Construction04/28/2010
BISEQISSUEDCisco Gen Construction02/22/2007
+ 23 more permits on file
10 projects · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedLit Mode Electrical Contg—
08/06/2026Permit IssuedLit Mode Electrical Contg—
08/03/2026Permit IssuedAbm ElectricGeneral Wiring
03/06/2025Permit IssuedLit Mode Electrical Contg—
11/01/2024Permit IssuedHylan Datacom & Electrical1 meters, 1 new_meters
05/18/2023CompleteTri-State Electrical & Mechanical IGeneral Wiring
03/03/2023CompleteCsi Sec & Electric—
12/02/2021CompleteOhm's ElectricalGeneral Wiring
04/04/2019CompleteMac Fhionnghaile & SonsGeneral Wiring
06/14/2018Permit IssuedAmin Electrical—
1 project · most recent 08/11/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/11/2026Permit IssuedP&K ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
09/27/2026MasonryIBRAHIM MOURADspecial
09/27/2026FinalIBRAHIM MOURADprogress
09/27/2026Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
09/27/2026Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
09/27/2026Post-installed AnchorsIBRAHIM MOURADspecial
08/28/2026Tenant Protection Plan Compliance—special
08/28/2026Masonry—special
08/28/2026Post-installed Anchors—special
08/28/2026Structural Stability – Alterations of existing buildings—special
08/28/2026Concrete - Cast-In-Place—special
08/19/2026Post-installed AnchorsJOEL PHAGOOspecial
08/17/2026Final—progress
08/11/2026Post-installed AnchorsJOEL PHAGOOspecial
01/12/2026Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
01/12/2026FinalIBRAHIM MOURADprogress
01/12/2026Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
01/12/2026MasonryIBRAHIM MOURADspecial
01/12/2026Post-installed AnchorsIBRAHIM MOURADspecial
07/15/2025Post-installed AnchorsJOEL PHAGOOspecial
01/11/2024HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
01/11/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/11/2024HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
01/11/2024HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
10/06/2023Chimneys and ventsGEORGE GHEBRYALspecial
10/06/2023Mechanical SystemsGEORGE GHEBRYALspecial
Latest 25 of 46.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
10/13/2026X01447280-I1Request digital key ↗
08/26/2026X00056039-I1Request digital key ↗
08/26/2026X00075096-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00351591-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
07/30/2010220069556Open ↗
06/28/2010220069556Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/28/2010220059193Open ↗
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature19
10/04/2026X01270877-P2Open ↗
09/02/2026X00664240-P1Open ↗
09/02/2026X00664240-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
10/13/2026X01447280-I1Open ↗
10/04/2026X01270877-P2Open ↗
08/26/2026X00075096-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
10/04/2026X01270877-P2Open ↗
09/02/2026X00664240-P1Open ↗
09/02/2026X00664240-P1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/05/2011220059193Open ↗
05/03/2011220069556Open ↗
06/28/2010220069556Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/28/2010220069556Open ↗
04/28/2010220059193Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/28/2010220069556Open ↗
04/28/2010220059193Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026X00351591-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00664240-P1Open ↗
08/24/2026X00664240-I1Open ↗
08/21/2026X00664226-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/28/2010220059193Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/28/2010220069556Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00664226-I1Open ↗
08/13/2026X00664240-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00664240-I1Open ↗
08/13/2026X00664226-I1Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
10/13/2026X01447280-I1Open ↗
10/04/2026X01270877-P2Open ↗
08/26/2026X00351591-I1Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/28/2010220069556Open ↗
04/28/2010220059193Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/05/2011220059193Open ↗
05/03/2011220069556Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/05/2011220059193Open ↗
05/03/2011220069556Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/18/2026X01270877-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00351591-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/28/2010220059193Open ↗
▸Other Documents6
▸DOB NOWCalculations3
08/17/2026X01374298-P1Open ↗
08/13/2026X01374298-I1Open ↗
08/13/2026X01255933-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/17/2026X01374298-P1Open ↗
08/13/2026X01374298-I1Open ↗
08/13/2026X01255933-I1Open ↗