Condo, residential tower (mixed-use, multi-family elevator) [derived]
Broadway 111 Street Condominium
2849 BROADWAY · BIN 1075440
💬 Discuss this project
1926Year Built
16Stories
RMBuilding Class
R8Zoning
174,081 sfGross Floor Area
156Units
LL97 CoveredRent Stabilized27 Open Violations 26 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: BROADWAY 111 STREET CONDOMINIUM · 17,661 sf lot · 9.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 20 docs
Floor 145p · 1 filing · 11 docs
Floor 131p · 1 filing · 14 docs
Floor 12
Floor 11
Floor 10
Floor 92p · 2 filings · 19 docs
Floor 8
Floor 71p · 1 filing · 20 docs
Floor 6Under Construction2p · 1 filing · 10 docs
Floor 5
Floor 41p · 2 filings · 20 docs
Floor 3
Floor 21p · 1 filing · 7 docs
Floor 1Under Construction6p · 3 filings · 20 docs
Cellar2p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
75 E END AVE OWNER1009/13/2026
NFS786407/08/2026
R A COHEN ASSOCIATES2707/08/2026
SIGNEXPO807/08/2026
PLATINUM SERVICES NY1007/08/2026
JUNO CONTRACTING503/22/2026
BROADWAY 111TH ST CONDOMINUIM903/22/2026
BROADWAY III STREET CONDO103/22/2026
BROADWAY-111THSTREETASSOCIATES4603/22/2026
BROADWAY 111 ST CONSTRUCT103/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VAI CONSTRUCTION INCGeneral Contractor903/21/2026
THE MANLYN DEVELOPMENT GROUPGeneral Contractor907/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor707/08/2026
ASA CORNER STONE BUILDERSGeneral Contractor607/08/2026
LMA GROUP INCGeneral Contractor607/08/2026
BENT MECHANICAL CORPPlumbing407/08/2026
JUNO CONTRACTING CORPGeneral Contractor307/08/2026
FM95NY LLCGeneral Contractor303/21/2026
VMC PLUMBING & HEATING INPlumbing207/08/2026
RITE WAY HEATING CORPPlumbing207/08/2026
HAMILTON AIR COMPANY, INC.General Contractor203/21/2026
FM95 NYScaffold207/08/2026
GOOD-WILL MECHANICAL CORP.General Contractor203/21/2026
TRISTRUX LLCGeneral Contractor203/21/2026
TOUGH STALLION LLCElectrical103/21/2026
VALENTIS ELECTRIC, INC.Electrical103/22/2026
ALBAN CONSTRUCTION LLCGeneral Contractor107/08/2026
EDI CONSTRUCTION INCGeneral Contractor106/28/2026
GREEN CITY BOX TRANS INCGeneral Contractor107/08/2026
ANDREW VASSElectrical103/21/2026
MELL RENOVATION SERVICESGeneral Contractor107/08/2026
MICHELLE KUO CORPGeneral Contractor104/09/2026
RAKA PAINTING INCGeneral Contractor107/08/2026
RENO DESIGN NY LLCGeneral Contractor108/26/2026
ADRIATIC PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665106/23/2026
GREAT WALL CONSULTANT P.E5633305/01/2026
HALO ARCHITECTURE PLLC8021202/05/2026
FRAMEWORK ENGINEERING PC82171410/23/2025
MESZAROS ENGINEERING PLLC963306/17/2024
GRANT ENGINEERING CONSULT3512101/30/2024
MIDTOWN PRESERVATION ARCH2634109/13/2023
JACK GREEN ASSOCIATES422108/18/2023
SPECIAL TESTING & CONSULT1688506/28/2023
NORMAN C. LOK818103/27/2023
Building Lifecycle
All (300)Filed (54)Permit Issued (55)Signed Off (36)Facade (FISP) (9)Violation (60)Inspection (40)Objection (16)Special Inspection (30)
08/21/2026
Signed off — Alteration
M01420901-I1
07/30/2026
Permit issued — General Construction
M01157983-I1-GC
07/06/2026
Permit issued — Suspended Scaffold
M01420901-I1-SC
06/23/2026
Filed — Alteration
M01420901-I1
05/01/2026
Filed — Alteration
Propose business accessory illuminate non-flashing signage for existing partial 1st floor commercial space as per plan. No change in use, egress, or occupancy
M01351609-S2
04/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2026
Permit issued — General Construction
M01157983-I1-GC
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2026
Signed off — Alteration
Interior renovation including minor partition alterations as per submitted plans. No change to use, egress, or occupancy.
M01027873-I1
03/16/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/06/2026
Permit issued — Plumbing
M01351609-S1-PL
02/24/2026
Permit issued — General Construction
M01351609-I1-GC
02/23/2026
Signed off — Alteration
Interior renovation including minor partition alterations as per submitted plans. No change to use, egress, or occupancy.
M00977646-I1
02/05/2026
Filed — Alteration
Propose business accessory illuminate non-flashing signage for existing partial 1st floor commercial space as per plan. No change in use, egress, or occupancy
M01351609-S1
02/05/2026
Filed — Alteration
Propose business accessory illuminate non-flashing signage for existing partial 1st floor commercial space as per plan. No change in use, egress, or occupancy
M01351609-I1
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
02/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Hanli Liu
02/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
Xiong Wei Wu
02/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
Xiong Wei Wu
02/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
02/04/2026
Special inspection requirement — Lighting controls
Hanli Liu
02/04/2026
Special inspection requirement — Interior lighting power
Hanli Liu
02/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
01/15/2026
Signed off — Alteration
M00746852-I1
01/12/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/23/2025
Filed — Alteration
Interior renovation including minor partition alterations as per submitted plans. No change to use, egress, or occupancy.
M01301253-I1
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Norman Cox
10/10/2025
Special inspection requirement — Lighting in dwelling units
Norman Cox
10/10/2025
Special inspection requirement — Final
Brynnemarie Lanciotti
10/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES NAPOLI
10/08/2025
Signed off — Alteration
M00808072-I1
06/16/2025
Signed off — Alteration
Dish - Installation of telecom antenna sectors, GPS and equipment cabinet on the roof. Installation of related conduits and service room connection in cellar as per plans. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
M08040118-I1
06/10/2025
Signed off — Alteration
Plumbing fixture replacement, relocation and new installation in connection with apartment renovation.
M00977651-I1
06/06/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/15/2025
Signed off — Alteration
REPLACEMENT OF GAS LINES FOR F-LINE APTS, (2) BOILER PILOTS, LAUNDRY RM DRYERS & APT 16G. REMOVAL OF INDIVIDUAL F-LINE APT METERS. INSTALL (1) NEW METER IN CEL FOR F-LINE RISER & (1) NEW METER FOR LAUNDRY RM & BOILER PILOTS. IN ASSOC W/ LAA#M01019795
M01020778-S1
04/14/2025
Signed off — Alteration
REPLACEMENT OF GAS LINES FOR F-LINE APTS, (2) BOILER PILOTS, LAUNDRY RM DRYERS & APT 16G. REMOVAL OF INDIVIDUAL F-LINE APT METERS. INSTALL (1) NEW METER IN CEL FOR F-LINE RISER & (1) NEW METER FOR LAUNDRY RM & BOILER PILOTS. IN ASSOC W/ LAA#M01019795
M01020778-I1
04/04/2025
Filed — Alteration
Filing plumbing modification at 6th floor apartment as per plans. No change in use, egress, or occupancy under this application.
M01157983-S1
04/04/2025
Filed — Alteration
Filing plumbing modification at 6th floor apartment as per plans. No change in use, egress, or occupancy under this application.
M01157983-I1
03/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Barry Holden
03/28/2025
Special inspection requirement — Lighting controls
Barry Holden
03/28/2025
Special inspection requirement — Lighting in dwelling units
Barry Holden
03/24/2025
Signed off — Alteration
Interior renovation including minor partition alterations as per submitted plans. No change to use, egress, or occupancy.
M00927482-I1
03/24/2025
Signed off — Alteration
Replace, relocate and install new plumbing fixtures associated with apartment renovation.
M00836293-I1
03/14/2025
Signed off — Alteration
Renovations to existing bathroom and installation of laundry closet. Plumbing scope to be filed under subsequent filing. No change in use, egress or occupancy.
M01111828-I1
03/06/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/06/2025
Signed off — Alteration
Plumbing fixture replacement, relocation and new installation in connection with apartment renovation.
M00977651-S1
02/03/2025
Filed — Alteration
M01166168-I1
02/03/2025
Filed — Alteration
M01166168-S1
01/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/15/2025
Signed off — Alteration
Replace, relocate and install new plumbing fixtures associated with apartment renovation.
M00836293-S1
01/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Norman Cox
01/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Norman Cox
01/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES NAPOLI
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRENO DESIGN NY LLC07/30/2026
DOB NOWSuspended ScaffoldSigned-offA W R GROUP INC07/06/2026
DOB NOWGeneral ConstructionPermit IssuedEDI CONSTRUCTION INC04/02/2026
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC03/06/2026
DOB NOWGeneral ConstructionPermit IssuedGREEN CITY BOX TRANS INC02/24/2026
DOB NOWGeneral ConstructionSigned-offJMI CONTRACTING CORP10/31/2024
DOB NOWAntennaSigned-offTRISTRUX LLC09/12/2024
DOB NOWGeneral ConstructionSigned-offVAI CONSTRUCTION INC08/27/2024
DOB NOWGeneral ConstructionSigned-offRAKA PAINTING INC06/25/2024
DOB NOWGeneral ConstructionSigned-offASA CORNER STONE BUILDERS06/13/2024
DOB NOWPlumbingSigned-offADRIATIC PLBG & HTG CORP06/12/2024
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP06/06/2024
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP06/06/2024
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP06/06/2024
DOB NOWGeneral ConstructionSigned-offASA CORNER STONE BUILDERS06/03/2024
DOB NOWGeneral ConstructionSigned-offASA CORNER STONE BUILDERS06/03/2024
DOB NOWGeneral ConstructionSigned-offMELL RENOVATION SERVICES05/08/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/09/2024
DOB NOWGeneral ConstructionSigned-offVAI CONSTRUCTION INC02/29/2024
DOB NOWPlumbingSigned-offLS PLUMBING CORP02/21/2024
DOB NOWGeneral ConstructionSigned-offALBAN CONSTRUCTION02/16/2024
DOB NOWPlumbingSigned-offLS PLUMBING CORP11/27/2023
DOB NOWGeneral ConstructionSigned-offVAI CONSTRUCTION INC10/26/2023
DOB NOWGeneral ConstructionSigned-offTHE MANLYN DEVELOPMENT GR10/13/2023
DOB NOWMechanical SystemsSigned-offTHE MANLYN DEVELOPMENT GR10/13/2023
DOB NOWSignSigned-offMAD SIGNS INC10/10/2023
DOB NOWMechanical SystemsSigned-offHAMILTON AIR COMPANY, INC.09/12/2023
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC08/24/2023
DOB NOWStructuralSigned-offTHE MANLYN DEVELOPMENT GR07/17/2023
DOB NOWMechanical SystemsSigned-offLMA GROUP INC06/08/2023
DOB NOWGeneral ConstructionSigned-offLMA GROUP INC06/08/2023
DOB NOWGeneral ConstructionSigned-offFM95NY LLC05/12/2023
DOB NOWGeneral ConstructionSigned-offTHE MANLYN DEVELOPMENT GR05/05/2023
DOB NOWMechanical SystemsSigned-offTHE MANLYN DEVELOPMENT GR05/04/2023
DOB NOWStructuralSigned-offTHE MANLYN DEVELOPMENT GR05/04/2023
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT04/18/2023
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT04/18/2023
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC03/08/2023
DOB NOWMechanical SystemsSigned-offTHE MANLYN DEVELOPMENT GR03/07/2023
DOB NOWStructuralSigned-offTHE MANLYN DEVELOPMENT GR03/07/2023
+ 60 more permits on file
2 projects · most recent 05/01/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/01/2026Signed-offXH&RC PLBG AND HTG INCWater/Sanitary
04/04/2025——Gas, Water/Sanitary
25 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
08/03/2026Pre-filing Pending PaymentJP & SON ELECTRIC CORP—
05/28/2026Permit IssuedINDY ELECTRIC CORP.General Wiring
05/22/2026CompleteMADISON ELECTRIC, INC—
11/08/2024CompletePK ELECTRIC INCGeneral Wiring
11/06/2024CompleteDAVEN ELECTRIC CORPGeneral Wiring
06/20/2024CompleteKEPLER ELECTRICAL CONT—
06/03/2024Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
05/07/2024CompleteEMPIRE LIC ELECL CONTRS—
02/23/2024CompleteKEPLER ELECTRICAL CONTGeneral Wiring
01/09/2024Permit IssuedJ.A. LEE ELEC SVCS LLC148 meters, 1 new_meters
12/07/2023CompleteMAUCERI ELECTRIC CORP.General Wiring
09/22/2023Permit IssuedA ELECTRICAL MAIN SVC INC—
08/28/2023CompleteASTER ELECTRIC, INC—
07/28/2023CompleteAE ELECTRIC INC—
1 project · most recent 09/27/2019
Fence
FiledStatusContractorScope
09/27/2019——Fence
▾Field Inspections (DOB CAP) — 40
DateTypeResultReport
04/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/16/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/12/2026Pass-Final General Construction Non-Directive 14PassView ↗
06/06/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/06/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
Latest 25 of 40.
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
02/04/2026HVAC-R and service water piping design and insulationHanli Liuenergy_progress
02/04/2026Lighting controlsHanli Liuenergy_progress
02/04/2026Interior lighting powerHanli Liuenergy_progress
02/04/2026Energy Code Compliance InspectionsHanli Liuprogress
02/04/2026Tenant Protection Plan ComplianceXiong Wei Wuspecial
02/04/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
02/04/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
02/04/2026Tenant Protection Plan ComplianceXiong Wei Wuspecial
02/04/2026Energy Code Compliance InspectionsHanli Liuprogress
10/10/2025Energy Code Compliance InspectionsNorman Coxprogress
10/10/2025FinalBrynnemarie Lanciottiprogress
10/10/2025Lighting in dwelling unitsNorman Coxenergy_progress
10/10/2025Tenant Protection Plan ComplianceJAMES NAPOLIspecial
03/28/2025Lighting in dwelling unitsBarry Holdenenergy_progress
03/28/2025Lighting controlsBarry Holdenenergy_progress
03/28/2025Energy Code Compliance InspectionsBarry Holdenprogress
02/25/2025Fire-Resistant Penetrations and Joints—special
01/15/2025HVAC-R and service water piping design and insulationNorman Coxenergy_progress
01/15/2025Energy Code Compliance InspectionsNorman Coxprogress
01/15/2025Tenant Protection Plan ComplianceJAMES NAPOLIspecial
01/13/2025Lighting in dwelling unitsNorman Coxenergy_progress
01/13/2025Energy Code Compliance InspectionsNorman Coxprogress
01/13/2025Tenant Protection Plan ComplianceJAMES NAPOLIspecial
01/06/2025HVAC-R and service water piping design and insulationNorman Coxenergy_progress
01/06/2025Energy Code Compliance InspectionsNorman Coxprogress
Latest 25 of 100.
▾Documents — 1,190 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch49
09/03/2026M00523149-I1Request digital key ↗
09/03/2026M00523153-P1Request digital key ↗
09/03/2026M00523153-I1Request digital key ↗
Showing 3 of 49 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00233335-I1Request digital key ↗
09/05/2026M00246455-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00406299-I1Request digital key ↗
08/15/2026M00406299-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00214824-I1Request digital key ↗
▸Applications & Permits227
▸BISPLAN / WORK APPROVAL APPLICATION92
06/09/2025102885193Open ↗
06/04/2025102885193Open ↗
06/03/2025102637078Open ↗
Showing 3 of 92 on file for this type
▸BISWORK PERMIT APPLICATION85
10/29/2020140953403Open ↗
03/13/2020123789043Open ↗
10/23/2019123884172Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWLPC Approval/Permit49
09/03/2026M00406299-I1Open ↗
09/03/2026M00523153-P1Open ↗
09/03/2026M00523153-I1Open ↗
Showing 3 of 49 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications278
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION105
03/06/2020123789043Open ↗
02/12/2020123789043Open ↗
12/09/2019123380493Open ↗
Showing 3 of 105 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature53
09/03/2026M00406299-P1Open ↗
09/03/2026M00406299-I1Open ↗
09/03/2026M00523153-P1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWProgress Inspector Seal & Signature52
09/07/2026M00406299-P1Open ↗
09/02/2026M00977651-I1Open ↗
09/02/2026M00977651-I1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/02/2026M00977651-I1Open ↗
09/02/2026M00920437-I1Open ↗
09/01/2026M00977651-S1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
09/18/2020140953403Open ↗
10/03/2019123884172Open ↗
06/28/2019123777092Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
10/03/2019123884172Open ↗
06/28/2019123777092Open ↗
Showing 2 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
09/18/2020140953403Open ↗
12/28/2018140824437Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
09/18/2020140953403Open ↗
12/28/2018140824437Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment96
▸BISSELF-CERT PLUMBING NOTICE32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE29
10/10/2019123777092Open ↗
06/28/2019123777092Open ↗
05/02/2019123380493Open ↗
Showing 3 of 29 on file for this type
▸BISSCHEDULE B - PLUMBING23
12/28/2018140824437Open ↗
Showing 1 of 23 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
05/22/2020123777092Open ↗
05/22/2020123777092Open ↗
04/30/2020123777092Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
05/22/2020123777092Open ↗
05/22/2020123777092Open ↗
04/30/2020123777092Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection24
▸BISTenant Protection Plan and Notes18
02/12/2020123789043Open ↗
10/03/2019123884172Open ↗
06/28/2019123777092Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWTenant Protection Plan5
09/03/2026M00406299-I1Open ↗
Showing 1 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos101
▸DOB NOWDEP ACP-5: Asbestos Assessment Report41
09/03/2026M00406299-I1Open ↗
09/03/2026M00406299-P1Open ↗
09/01/2026M00808072-I1Open ↗
Showing 3 of 41 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)37
09/18/2020140953403Open ↗
02/12/2020123789043Open ↗
10/03/2019123884172Open ↗
Showing 3 of 37 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00523153-I1Open ↗
08/29/2026M00836293-S1Open ↗
08/29/2026M00836293-I1Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance93
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS51
03/06/2020123789043Open ↗
02/12/2020123789043Open ↗
12/09/2019123380493Open ↗
Showing 3 of 51 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
04/09/2021140953403Open ↗
01/22/2021123789043Open ↗
04/30/2020123777092Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
04/09/2021140953403Open ↗
01/22/2021123789043Open ↗
09/18/2020140953403Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
09/18/2020140953403Open ↗
12/28/2018140824437Open ↗
Showing 2 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00523153-I1Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY CODE 2ND REVIEW1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
09/18/2020140953403Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY11
06/04/2025102885193Open ↗
04/09/2021140953403Open ↗
04/09/2021140953403Open ↗
Showing 3 of 11 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
06/10/2025102885193Open ↗
▸Approvals, Objections & Sign-offs97
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST46
06/11/2025102885193Open ↗
06/04/2025102637078Open ↗
04/09/2021140953403Open ↗
Showing 3 of 46 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISLANDMARKS APPROVAL15
10/20/2020140953403Open ↗
09/18/2020140953403Open ↗
02/12/2020123789043Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
03/06/2019123190457Open ↗
Showing 1 of 11 on file for this type
▸BISLANDMARKS SIGNOFF4
04/30/2020123777092Open ↗
03/07/2019123190457Open ↗
09/14/2018140711781Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWLandmark Approval1
08/13/2026M01351609-S2Open ↗
▸Cost, Insurance & Ownership98
▸BISCOST AFFIDAVIT90
04/09/2021140953403Open ↗
01/22/2021123789043Open ↗
10/20/2020140953403Open ↗
Showing 3 of 90 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT8
03/13/2020123789043Open ↗
Showing 1 of 8 on file for this type
▸Filing & Intake Forms95
▸BISEFILING COVER SHEET37
02/12/2020123789043Open ↗
10/03/2019123884172Open ↗
06/28/2019123777092Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION33
10/20/2020140953403Open ↗
01/23/2020123777092Open ↗
07/10/2019140824437Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM18
12/09/2019123380493Open ↗
10/10/2019123777092Open ↗
08/05/2019140824437Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
09/18/2020140953403Open ↗
12/28/2018140824437Open ↗
Showing 2 of 7 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026M00901888-I1Open ↗
08/13/2026M00920437-I1Open ↗
Showing 2 of 3 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLAA - Supporting Documentation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* FIRE STOPS 27-3451
06/10/2025102885193Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/30/2020123777092Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01420901-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01420901-I1Open ↗
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type