← Back
BuildNYC
BROOKLYN
286 1ST STREET
BROOKLYN · Park Slope · BIN 3020768
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized4 Active Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof286 1st St LLC93p · 1 filing · 20 docs
Penthouse286 1st St LLC95p · 1 filing · 20 docs
Floor 3286 1st St LLC94p · 1 filing · 20 docs
Floor 2286 1st St LLC89p · 1 filing · 20 docs
Floor 1286 1st St LLC90p · 1 filing · 20 docs
Cellar286 1st St LLC99p · 1 filing · 20 docs
Site & exteriorInstallation of construction fence2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
286 1st St4607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/17/2023$2.7M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Opera Studio Architecture1109/19/2025
Elr Morgan502/05/2024
Mohammad Ahead, PE101/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
The Vilnits Group603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ugb ConstructionGeneral Contractor1307/08/2026
Ugb ConstructionScaffold207/08/2026
Plumbing-It MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161609/19/2025
Building Lifecycle
All (159)Filed (17)Permit Issued (10)Signed Off (5)Violation (17)Inspection (7)Objection (73)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
10/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/16/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/16/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
10/16/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
10/16/2025
Special inspection requirement — Metering
FAHAD FATEH
10/16/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
10/16/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
10/16/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
10/16/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/19/2025
Filed — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-A2
09/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/19/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/19/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
09/19/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/19/2025
Special inspection requirement — Metering
FAHAD FATEH
09/19/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
09/19/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/19/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/19/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/20/2025
Filed — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-A1
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/19/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/01/2025
Filed — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-P9
06/05/2025
Violation issued (HPD, open)
A
05/07/2025
Objection raised — Other
04/10/2025
Filed — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-P8
03/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/08/2025
Signed off — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-S1
03/08/2025
Signed off — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-S2
03/07/2025
Signed off — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-S4
03/07/2025
Signed off — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-S3
02/11/2025
Filed — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-P7
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/10/2025
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE. AS PER PLAN.
B00995742-I1
11/26/2024
Violation issued (HPD, closed)
I
10/02/2024
Permit issued — General Construction
B00830412-I1-GC
09/24/2024
Permit issued — Construction Fence
B00995742-I1-FN
09/24/2024
Permit issued — Mechanical Systems
B00830412-S2-MS
07/02/2024
Filed — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-P5
07/02/2024
Filed — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-P6
06/27/2024
Filed — Alteration CO
MODERATE INTERIOR RENOVATION OF PARTITIONS,GWB, & COSMETIC FINISHES THROUGHOUT. EXTERIOR WORK HORIZONTAL AND VERTICAL EXTENSION FOR PENTHOUSE LEVEL, REAR YD STEEL DECK,WINDOW REPLACEMENT,FACADE WORK FOR THREE FAMILY RESIDENCE.
B00830412-P4
06/05/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2024
Violation issued (HPD, open)
A
03/23/2024
Violation issued (ECB, closed)
Unknown
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUgb Construction10/02/2024
DOB NOWConstruction FenceSigned-offUgb Construction09/24/2024
DOB NOWMechanical SystemsSigned-offUgb Construction09/24/2024
DOB NOWMechanical SystemsSigned-offUgb Construction03/21/2024
DOB NOWPlumbingSigned-offJVR Plumbing and Heating03/21/2024
DOB NOWConstruction FenceSigned-offUgb Construction01/29/2024
DOB NOWGeneral ConstructionPermit IssuedUgb Construction11/15/2023
DOB NOWStructuralSigned-offUgb Construction10/02/2023
DOB NOWGeneral ConstructionPermit IssuedUgb Construction09/25/2023
DOB NOWFoundationSigned-offUgb Construction09/25/2023
BISOTISSUEDMitchell Iron Work's04/18/2007
BISOTISSUEDMitchell Iron Work's04/18/2007
1 project · most recent 09/19/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2025Permit IssuedUgb ConstructionHeating and Air Conditioning Systems
Heat / Cool
Lg ARUM036GSS5 3 tons · Vrf Outdoor ×1
ARUM048GSS5 4 tons · Vrf Outdoor ×1
ARUN060GSS4 5 tons · Vrf Outdoor ×1
1 project · most recent 09/19/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
09/19/2025Signed-offPlumbing-It MechanicalPlumbing-Sprinkler, Storm, Water/Sanitary
3 projects · most recent 07/24/2024
General Wiring
FiledStatusContractorScope
07/24/2024CompleteK.A.B. Electric—
05/28/2024CancelledK.A.B. Electric—
01/13/2024CompleteK.A.B. ElectricGeneral Wiring
1 project · most recent 09/19/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/19/2025Permit IssuedUgb ConstructionSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 124
DateRequirementInspectorRole
10/16/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/16/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/16/2025MeteringFAHAD FATEHenergy_progress
10/16/2025Permanent certificateFAHAD FATEHenergy_progress
10/16/2025Interior lighting powerFAHAD FATEHenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/16/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/16/2025Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
10/16/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/16/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
10/16/2025Fenestration air leakageFAHAD FATEHenergy_progress
10/16/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
10/16/2025Fenestration areasFAHAD FATEHenergy_progress
09/19/2025Fenestration air leakageFAHAD FATEHenergy_progress
09/19/2025Interior lighting powerFAHAD FATEHenergy_progress
09/19/2025Permanent certificateFAHAD FATEHenergy_progress
09/19/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
09/19/2025Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
09/19/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/19/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/19/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/19/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/19/2025MeteringFAHAD FATEHenergy_progress
09/19/2025Fenestration areasFAHAD FATEHenergy_progress
09/19/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
Latest 25 of 124.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/26/2026B00995742-I1Request digital key ↗
08/20/2026B00830412-P7Request digital key ↗
08/20/2026B00830412-P9Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/29/2025322051097Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram7
08/20/2026B00830412-P4Open ↗
08/20/2026B00830412-P7Open ↗
08/15/2026B00830412-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/20/2026B00830412-P7Open ↗
08/20/2026B00830412-P4Open ↗
08/15/2026B00830412-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B00830412-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature22
10/03/2026B00830412-P5Open ↗
10/03/2026B00830412-P5Open ↗
09/26/2026B00830412-P7Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/26/2026B00995742-I1Open ↗
08/20/2026B00830412-P3Open ↗
08/20/2026B00830412-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
10/03/2026B00830412-P5Open ↗
09/26/2026B00830412-P7Open ↗
09/06/2026B00830412-S4Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist7
08/20/2026B00830412-P4Open ↗
08/20/2026B00830412-A2Open ↗
08/20/2026B00830412-A1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/15/2026B00830412-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/20/2026B00830412-S1Open ↗
08/20/2026B00830412-S2Open ↗
08/15/2026B00830412-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/15/2026B00830412-S4Open ↗
08/13/2026B00830412-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B00830412-S4Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/29/2025322051097Open ↗
▸Other Documents24
▸DOB NOWPlot Diagram9
08/20/2026B00830412-P7Open ↗
08/20/2026B00830412-P4Open ↗
08/15/2026B00830412-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial7
08/20/2026B00830412-P4Open ↗
08/20/2026B00830412-P7Open ↗
08/15/2026B00830412-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/20/2026B00830412-P4Open ↗
08/20/2026B00830412-P7Open ↗
08/15/2026B00830412-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFinal Survey1
08/15/2026B00830412-I1Open ↗