← Back
Miscellaneous asylum / home
288 JACKSON STREET
BROOKLYN · BIN 3338304
💬 Discuss this project
1910Year Built
4Stories
N9Building Class
R7-2Zoning
42,224 sfGross Floor Area
1Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Miscellaneous asylum / home · Owner of record: GREENPOINT HOSPITAL SHELTER HDFC · 24,405 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 41p · 1 filing · 16 docs
Floor 31p · 1 filing · 16 docs
Floor 22p · 2 filings · 19 docs
Floor 1Under Construction119p · 4 filings · 20 docs
CellarUnder Construction2 filings · 13 docs
Basement117p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP807/08/2026
MASPETH B2 OWNER707/08/2026
GREENPOINT HOSPITAL SHELTER HDFC2407/08/2026
CELTIC SERVICES NYC INC903/22/2026
BROADWAY BUILDERS203/22/2026
DHS-HOMELESS SERVICES203/22/2026
DCAS 856303/22/2026
DCAS 996103/22/2026
DEPARTMENT OF HOMELESS SE1203/22/2026
ST.NICHOLAS N.P.C.803/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1803/21/2026
LEWSAN CONSULTING403/21/2026
ARCHI PRO GROUP303/21/2026
KD DESIGNS303/21/2026
AE DESIGN SOLUTION603/21/2026
Rigid Structural Design, LLC1303/21/2026
DOMANI CONSULTING103/21/2026
HS DESIGN STUDIO403/21/2026
CONSTRUCTION LAB203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROADWAY BUILDERS LLCGeneral Contractor2307/08/2026
DHS FRACO LLCGeneral Contractor1207/08/2026
DYNAMIC HOISTING SCAFF INGeneral Contractor1107/08/2026
BLETSAS PLBNG & HTG CORPFire Protection607/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor407/08/2026
BLETSAS PLBNG & HTG CORPPlumbing407/08/2026
FISHER INSTALLATIONS INCGeneral Contractor407/08/2026
FLINT MECHANICAL CORPPlumbing307/08/2026
AURA PLUMBING INCFire Protection307/08/2026
FLINT MECHANICAL CORPFire Protection307/08/2026
CRESCENT CONTRACTING CORPPlumbing307/08/2026
CELTIC SERVICES NYC INCGeneral Contractor303/21/2026
PANILI PLUMBING & HTG LLCPlumbing207/08/2026
T.R.PIPE INCElectrical103/21/2026
SIGMA ELECTRIC INC.Electrical103/22/2026
LATERZA, MICHAELElectrical103/21/2026
HAZRAT ALLYElectrical103/21/2026
DUNN, JEREMYElectrical103/21/2026
DIFUSCO, ALFONSOElectrical103/21/2026
LET IT GROW, INCORPORATEDGeneral Contractor104/09/2026
SC PRIME ENERGY LTDGeneral Contractor104/09/2026
BLETSAS P HPlumbing103/22/2026
CRUGNALE, MICHAELElectrical103/21/2026
CLIFTON WALDRONElectrical103/21/2026
CARL WEISSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LOMBARDO PROF ENGINEERING8566306/16/2026
DOMANI INSPECTION SERVICE8431803/25/2026
GEODESIGN, INC., P.C.627111/15/2021
GREGORY V. PEROTTO, P.E.947203/12/2020
Building Lifecycle
All (300)Filed (41)Permit Issued (62)Signed Off (21)Violation (45)Inspection (21)Objection (80)Special Inspection (30)
09/14/2026
Violation issued (ECB, open)
Construction
08/24/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
B01284049-I1
08/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. NO CHANGES TO THE EXISTING MEANS OF EGRESS.
B01411627-I1
08/14/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01066169-I1
08/14/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY BARRICADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01077222-I1
07/28/2026
Violation issued (ECB, open)
Construction
07/28/2026
Violation issued (ECB, open)
Construction
07/28/2026
Violation issued (ECB, open)
Cranes and Derricks
06/22/2026
Signed off — Alteration
B00622689-I1
06/19/2026
Signed off — Alteration
B08044342-I1
06/17/2026
Permit issued — Suspended Scaffold
B01411627-I1-SC
06/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. NO CHANGES TO THE EXISTING MEANS OF EGRESS.
B01411627-I1
06/10/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
05/29/2026
Signed off — Alteration CO
Filing to convert existing building from nurse residences to a 200 bed shelter. Also filing to enlarge building horizontally at basement. HUB consultation accepted on 8/17/2021 (125 Maspeth Avenue)..
B00587567-S3
05/13/2026
Signed off — Alteration CO
Filing to convert existing building from nurse residences to a 200 bed shelter. Also filing to enlarge building horizontally at basement. HUB consultation accepted on 8/17/2021 (125 Maspeth Avenue)..
B00587567-S7
05/05/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/13/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND SYSTEM STAIR SCAFFOLD AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B08039060-I1
04/01/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND OVERHEAD PROTECTION SHED AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B08039059-I1
03/25/2026
Filed — Alteration CO
Filing to convert existing building from nurse residences to a 200 bed shelter. Also filing to enlarge building horizontally at basement. HUB consultation accepted on 8/17/2021 (125 Maspeth Avenue)..
B00587567-A2
03/25/2026
Signed off — Alteration
Installation of a temporarily supported scaffold and system scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01049524-I1
03/25/2026
Signed off — Alteration
Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
B01150398-I1
03/25/2026
Signed off — Alteration
FILING TEMP WET STANDPIPE IN CONJUNCTION WITH ALT-CO APPLICATION B00587567-I1, AS SHOWN PER PLAN.
B00883543-I1
03/25/2026
Signed off — Alteration
Installation and use of the temporary Debris Chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
B01059304-I1
03/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Metering
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Protection of exposed foundation insulation
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Vestibules
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Masonry
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
03/03/2026
Signed off — Alteration CO
Filing to convert existing building from nurse residences to a 200 bed shelter. Also filing to enlarge building horizontally at basement. HUB consultation accepted on 8/17/2021 (125 Maspeth Avenue)..
B00587567-S4
03/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
02/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
B01284049-P1
02/11/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
01/22/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/19/2026
Permit issued — Sprinklers
B00622689-I1-EW-SD
01/13/2026
Signed off — Alteration CO
Filing to convert existing building from nurse residences to a 200 bed shelter. Also filing to enlarge building horizontally at basement. HUB consultation accepted on 8/17/2021 (125 Maspeth Avenue)..
B00587567-S6
01/12/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2026
Signed off — Alteration CO
Filing to convert existing building from nurse residences to a 200 bed shelter. Also filing to enlarge building horizontally at basement. HUB consultation accepted on 8/17/2021 (125 Maspeth Avenue)..
B00587567-Z3
01/08/2026
Filed — Alteration CO
Filing to convert existing building from nurse residences to a 200 bed shelter. Also filing to enlarge building horizontally at basement. HUB consultation accepted on 8/17/2021 (125 Maspeth Avenue)..
B00587567-A3
01/07/2026
Permit issued — Standpipe
B00883543-I1-EW-SD
01/06/2026
Permit issued — Plumbing
B00587567-S4-PL
01/06/2026
Permit issued — Standpipe
B00622689-I1-EW-SP
01/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offELM SUSPENSION SYSTEMS06/17/2026
DOB NOWSprinklersSigned-offBLETSAS P&H CORP01/19/2026
DOB NOWStandpipeSigned-offBLETSAS P&H CORP01/07/2026
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP01/06/2026
DOB NOWStandpipeSigned-offBLETSAS P&H CORP01/06/2026
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC12/16/2025
DOB NOWCurb CutSigned-offLET IT GROW, INCORPORATED11/06/2025
DOB NOWBoiler EquipmentSigned-offABILENE, INC10/02/2025
DOB NOWSuspended ScaffoldSigned-offELM SUSPENSION SYSTEMS09/25/2025
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/11/2025
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC08/11/2025
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC07/11/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/11/2025
DOB NOWSupported ScaffoldSigned-offDHS FRACO05/29/2025
DOB NOWSidewalk ShedSigned-offDHS FRACO05/29/2025
DOB NOWStandpipeSigned-offAURA PLUMBING INC12/31/2024
DOB NOWSprinklersSigned-offAURA PLUMBING INC12/31/2024
DOB NOWSprinklersSigned-offAURA PLUMBING INC12/31/2024
DOB NOWPlumbingSigned-offPANILI PLUMBING & HTG LLC12/30/2024
DOB NOWPlumbingSigned-offPANILI PLUMBING & HTG LLC12/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offDYNAMIC HOISTING SCAFF IN12/09/2024
DOB NOWMechanical SystemsSigned-offSC PRIME ENERGY LTD11/22/2024
DOB NOWPlumbingSigned-offBLETSAS PLBNG & HTG CORP11/14/2024
DOB NOWPlumbingSigned-offBLETSAS PLBNG & HTG CORP11/14/2024
DOB NOWConstruction FencePermit IssuedFISHER INSTALLATIONS10/07/2024
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC08/13/2024
DOB NOWStructuralSigned-offBROADWAY BUILDERS LLC08/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offDYNAMIC HOISTING SCAFF IN08/06/2024
DOB NOWSupported ScaffoldSigned-offDYNAMIC HOISTING SCAFF IN08/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/18/2024
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC07/15/2024
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP07/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offDYNAMIC HOISTING SCAFF IN06/03/2024
DOB NOWSupported ScaffoldSigned-offDYNAMIC HOISTING SCAFF IN06/03/2024
DOB NOWSidewalk ShedSigned-offDHS FRACO05/29/2024
DOB NOWSupported ScaffoldSigned-offDHS FRACO05/28/2024
DOB NOWMechanical SystemsSigned-offBROADWAY BUILDERS LLC05/07/2024
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP01/04/2024
DOB NOWSprinklersSigned-offBLETSAS PLBNG & HTG CORP01/04/2024
DOB NOWConstruction FenceSigned-offFISHER INSTALLATIONS12/05/2023
+ 29 more permits on file
1 project · most recent 03/25/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Permit IssuedBROADWAY BUILDERS LLCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric TURYP0723AN40AN 72,000 BTU · Condensing Unit ×17
TRUZH0241HA10NA 24,000 BTU · Vrf Indoor ×4
TURYP1203AN40AN 120,000 BTU · Vrf Outdoor ×4
NTXMSM48A182AA 48,000 BTU · Vrf Outdoor ×2
TURYP0963AN40AN 96,000 BTU · Vrf Outdoor ×2
TURYP1443AN40AN 264,000 BTU · Vrf Outdoor ×2
— TURYP0723AN40AN 72,000 BTU · Condensing Unit ×1
Heat / Cool
Lg ARUM072BTE5 72,000 BTU · Vrf Outdoor ×4
ARUM121BTE5 119,000 BTU · Vrf Outdoor ×2
ARUM144BTE5 144,000 BTU · Vrf Outdoor ×2
Ventilation
Energywall U-ERV-2400 2,305 CFM · Doas ×6
Lg ARND203DCR4 1,800 CFM · Vrf Indoor ×2
1 project · most recent 03/25/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/25/2026Signed-offBLETSAS P&H CORPStorm, Water/Sanitary
6 projects · most recent 03/25/2026
General Wiring
FiledStatusContractorScope
03/25/2026CancelledSIGMA ELECTRIC INC.General Wiring
02/27/2026CompleteEASTERN ELEC'L CONST INC—
05/24/2024CompleteNYCOM ELECTRICAL CORP—
03/27/2024CompleteSIGMA ELECTRIC INC.General Wiring
01/03/2023CompleteNASH ELECTRIC SERVICES IN—
10/07/2021CompleteP & M ELECT'L CONTR. CORPGeneral Wiring
1 project · most recent 03/25/2026
FiledStatusContractorScope
03/25/2026Signed-offBLETSAS P&H CORP1 scope_items
1 project · most recent 08/15/2024
Fence
FiledStatusContractorScope
08/15/2024Signed-offCORE SCAFFOLD SYSTEMS INCFence
2 projects · most recent 06/16/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/16/2026Signed-offELM SUSPENSION SYSTEMSSuspended Scaffold (SC)
02/27/2026Signed-offELM SUSPENSION SYSTEMSSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
05/05/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/22/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2026Pass-Final Boiler Equipment InspectionPassView ↗
12/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/18/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
11/14/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 117
DateRequirementInspectorRole
06/10/2026Post-installed AnchorsMichael Lombardospecial
03/11/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
03/11/2026Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
03/11/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
03/11/2026Protection of exposed foundation insulationJOHN MCMONAGLEenergy_progress
03/11/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
03/11/2026Fenestration areasJOHN MCMONAGLEenergy_progress
03/11/2026VestibulesJOHN MCMONAGLEenergy_progress
03/11/2026MeteringJOHN MCMONAGLEenergy_progress
03/11/2026Maintenance informationJOHN MCMONAGLEenergy_progress
03/11/2026Lighting controlsJOHN MCMONAGLEenergy_progress
03/11/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
03/11/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
03/11/2026Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
03/11/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
03/11/2026Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
03/11/2026MasonryJOHN MCMONAGLEspecial
03/11/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/11/2026Exterior Insulation and Finish Systems (EIFS)JOHN MCMONAGLEspecial
03/11/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
03/02/2026Post-installed AnchorsMichael Lombardospecial
01/20/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
01/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
01/06/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
Latest 25 of 117.
▾Documents — 322 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch39
08/29/2026B00587567-P7Request digital key ↗
08/29/2026B00587567-S6Request digital key ↗
08/29/2026B00587567-A2Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/30/2026B00665237-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00280905-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00280875-I1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION9
09/17/2011320287729Open ↗
09/17/2009310087312Open ↗
09/16/2009310087312Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
02/13/2026340830809Open ↗
02/11/2026340830809Open ↗
10/30/2025340830809Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
11/12/2025340830809Open ↗
12/29/2021340830809Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram5
08/29/2026B00587567-A3Open ↗
08/29/2026B00587567-I1Open ↗
08/29/2026B00587567-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/29/2026B00587567-A3Open ↗
08/29/2026B00587567-I1Open ↗
08/29/2026B00587567-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/29/2026B00587567-P1Open ↗
08/29/2026B00587567-S4Open ↗
08/29/2026B00587567-P8Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/01/2026B00587567-S5Open ↗
08/31/2026B00587567-P7Open ↗
08/28/2026B00587567-S3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/25/2026B08021590-P2Open ↗
08/31/2026B00587567-P7Open ↗
08/31/2026B00587567-P7Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/15/2008310197177Open ↗
02/01/2008310087321Open ↗
02/01/2008310087312Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/15/2008310197177Open ↗
02/01/2008310087321Open ↗
02/01/2008310087312Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/15/2008310197177Open ↗
02/01/2008310087321Open ↗
02/01/2008310087312Open ↗
▸BISPC FULL REPORT2
02/01/2008310087321Open ↗
02/01/2008310087312Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/29/2021340830809Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/29/2021340830809Open ↗
▸Trade Schedules & Equipment9
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/29/2026B00587567-P1Open ↗
08/29/2026B00587567-A3Open ↗
08/29/2026B00587567-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
03/11/2009310197177Open ↗
03/11/2009310197177Open ↗
▸BISSCHEDULE B - PLUMBING1
09/15/2008310197177Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
03/11/2009310197177Open ↗
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist5
08/29/2026B00587567-I1Open ↗
08/29/2026B00587567-A3Open ↗
08/29/2026B00587567-P1Open ↗
Showing 3 of 5 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
09/17/2011320287729Open ↗
09/17/2011320287729Open ↗
▸BISSTREET TREE CHECKLIST2
02/20/2026340830809Open ↗
03/06/2023340830809Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00280875-I1Open ↗
08/13/2026B00280905-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/29/2021340830809Open ↗
▸BISSTREET TREES SITE PLAN1
02/19/2026340830809Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/18/2011320287729Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/18/2011320287729Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos37
▸DOB NOWOER: Notice to Proceed14
08/29/2026B00587567-I1Open ↗
08/29/2026B00587567-S4Open ↗
08/15/2026B00587567-S3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
08/29/2026B00587567-S4Open ↗
08/13/2026B00587567-S3Open ↗
08/13/2026B00587567-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/28/2026B08021590-I1Open ↗
08/13/2026B00587567-S1Open ↗
08/13/2026B00587567-S4Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/01/2008310087321Open ↗
02/01/2008310087312Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRODENT CONTROL1
09/17/2011320287729Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/15/2008310197177Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026B00587567-S3Open ↗
▸Inspections & Test Reports4
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
03/06/2023340830809Open ↗
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs49
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)18
08/29/2026B00587567-S4Open ↗
08/29/2026B00587567-P8Open ↗
08/29/2026B00587567-A3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/23/2026B01150398-I1Open ↗
08/13/2026B01077222-I1Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWDEP Variance (V5) letter10
08/13/2026B00587567-Z3Open ↗
08/13/2026B00587567-S1Open ↗
Showing 2 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
09/15/2008310197177Open ↗
02/01/2008310087321Open ↗
02/01/2008310087312Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/20/2026340830809Open ↗
10/13/2011320287729Open ↗
08/04/2011320287729Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B08021590-I1Open ↗
Showing 1 of 2 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
03/06/2023340830809Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/15/2008310197177Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION6
02/20/2026340830809Open ↗
11/12/2025340830809Open ↗
11/05/2025340830809Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/29/2021340830809Open ↗
▸Other Documents37
▸DOB NOWPlot Diagram7
08/29/2026B00587567-P1Open ↗
08/29/2026B00587567-I1Open ↗
08/29/2026B00587567-A3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification5
08/29/2026B00587567-I1Open ↗
08/29/2026B00587567-P1Open ↗
08/29/2026B00587567-A3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/29/2026B00587567-I1Open ↗
08/29/2026B00587567-P1Open ↗
08/29/2026B00587567-A3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/29/2026B00587567-P1Open ↗
08/29/2026B00587567-I1Open ↗
08/29/2026B00587567-A3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations3
08/20/2026B01284049-I1Open ↗
08/16/2026B01411627-I1Open ↗
08/13/2026B01284049-P1Open ↗
▸DOB NOWManufacturer's Specifications3
08/20/2026B01284049-I1Open ↗
08/16/2026B01411627-I1Open ↗
Showing 2 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
11/10/2025340830809Open ↗
12/29/2021340830809Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/13/2011320287729Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/06/2023340830809Open ↗
▸DOB NOWAlternate Plan 21
08/30/2026B00665237-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00587567-S5Open ↗
▸DOB NOWFinal Survey1
08/29/2026B00587567-I1Open ↗
▸DOB NOWAlternate Plan 11
08/30/2026B00665237-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00587567-I1Open ↗