City university
CUNY SC > BKC_402_Brooklyn College
2895 BEDFORD AVENUE · BIN 3327322
💬 Discuss this project
1900Year Built
5Stories
W5Building Class
R6Zoning
1,073,920 sfGross Floor Area
3Units
LL97 Covered54 Open Violations 53 unresolved · 1 paperwork only ▸FISP: No Report FiledFDNY Report ↗
City university · 720,000 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 10 docs
Floor 5Under Construction8p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1Under Construction11p · 1 filing · 20 docs
Basement3p · 2 filings · 20 docs
Sub-BasementUnder Construction10p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY3207/08/2026
NYC AGENCY PROPERTIES503/22/2026
DORMITORY AUTHORITY903/22/2026
CUNY 042103/22/2026
DORMITORY AUTHORITY STATE OF NY1203/22/2026
CUNY303/21/2026
DORMITORY AUTHORITY OF NYS103/21/2026
DDCM503/21/2026
DORMITORY AUTHORITY OF THE STATE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MITCHELL / GIURGOLA ARCHITECTS502/13/2026
KIRO ENGINEERING LLC201/22/2026
LORING CONSULTING ENGINEERS, INC.107/15/2025
RAMBOLL204/02/2025
LIZARDOS ENGINEERING409/14/2023
YSRAEL A. SEINUK, P.C.206/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES1203/21/2026
NYCCODE403/21/2026
CONVERSANO ASSOCIATES, INC.1203/21/2026
STEVEN DUBNER LANDSCAPING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC US, INCGeneral Contractor507/08/2026
GOHAR CONSTRUCTION CORPGeneral Contractor507/08/2026
STEVEN DUBNER LANDSCAPINGGeneral Contractor304/09/2026
INFINITI ESC PLUMBING CORPlumbing207/08/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
J.H. ELEC. OF NEW YORK INElectrical103/22/2026
MAR-SAL PLBG & HTG, INCPlumbing107/08/2026
CORE ELECTRIC MEP INDS LLElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983402/13/2026
FUTURE TECH CONSULTANTS O589407/14/2025
TECTONIC ENGINEERING CONS106102/01/2022
Building Lifecycle
All (147)Filed (16)Permit Issued (15)Signed Off (4)Violation (60)Inspection (16)Objection (12)Special Inspection (24)
09/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/16/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/09/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/26/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/18/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/14/2026
Objection raised — Admin
02/26/2026
Permit issued — Plumbing
B01235948-S3-PL
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2026
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
02/24/2026
Special inspection requirement — Concrete - Precast
MARISA HARTE
02/24/2026
Special inspection requirement — Subgrade Inspections
MARISA HARTE
02/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MARISA HARTE
02/24/2026
Special inspection requirement — Footing and Foundation
MARISA HARTE
02/24/2026
Special inspection requirement — Final
MARISA HARTE
02/24/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MARISA HARTE
02/13/2026
Filed — Alteration
site civil plumbing work
B01235948-P3
02/13/2026
Filed — Alteration
site civil plumbing work
B01235948-P2
02/12/2026
Objection raised — Admin
02/10/2026
Violation issued (FDNY_ORDER, closed)
01/22/2026
Filed — Alteration
site civil plumbing work
B01235948-S5
01/16/2026
Special inspection requirement — Subgrade Inspections
MARISA HARTE
01/16/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MARISA HARTE
01/16/2026
Special inspection requirement — Concrete - Precast
MARISA HARTE
01/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MARISA HARTE
01/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MARISA HARTE
01/12/2026
Permit issued — General Construction
B01235948-S4-GC
01/09/2026
Special inspection requirement — Final
MARISA HARTE
01/09/2026
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
01/09/2026
Special inspection requirement — Footing and Foundation
MARISA HARTE
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/15/2025
Filed — Alteration
site civil plumbing work
B01235948-S4
12/09/2025
Permit issued — Plumbing
B01235948-S1-PL
12/05/2025
Permit issued — Structural
B01235948-S2-GC-CX
12/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/24/2025
Special inspection requirement — Final
MINA MIKAEEL
11/19/2025
Permit issued — General Construction
B01235948-I1-GC
07/16/2025
Filed — Alteration
site civil plumbing work
B01235948-S2
07/15/2025
Filed — Alteration
site civil plumbing work
B01235948-S3
07/14/2025
Filed — Alteration
site civil plumbing work
B01235948-S1
07/14/2025
Filed — Alteration
site civil plumbing work
B01235948-I1
06/06/2025
Signed off — Alteration
B00573466-I1
05/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2025
Violation issued (FDNY_ORDER, closed)
04/09/2025
Violation issued (FDNY_ORDER, closed)
04/02/2025
Filed — Alteration
Mechanical work at the photography room in Boylan Hall, Brooklyn College. No change of use ,egress or occupancy.
B01124003-I1
12/09/2024
Inspection — Pass-Final House Connection
Pass
View inspection ↗
09/09/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/26/2024
Permit issued — Mechanical Systems
B00573466-I1-MS
06/26/2024
Permit issued — Mechanical Systems
B00573466-I1-MS
12/07/2023
Signed off — Alteration
Alterations of an existing plumbing system to include the removal/installation of domestic water piping, waste and vent piping, and relative functionality upgrades as per drawings. No change in use, egress, or occupancy.
B00654731-I1
11/09/2023
Signed off — Alteration
Minimal structural steel framing at new designated roof openings of BC Boylan Hall as per drawings. No change in use, egress, or occupancy.
B00654719-I1
11/09/2023
Signed off — Alteration
Mechanical alterations to an existing system entailing the removal/installation of ductwork and exhaust equipment, piping and related components, with joint operational enhancements as per drawings. No change in use, egress, or occupancy.
B00654727-I1
10/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Stephen Marchese
09/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Marchese
09/14/2023
Filed — Alteration
Alterations of an existing plumbing system to include the removal/installation of domestic water piping, waste and vent piping, and relative functionality upgrades as per drawings. No change in use, egress, or occupancy.
B00654731-P2
09/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Stephen Marchese
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/26/2026
DOB NOWGeneral ConstructionPermit IssuedSTEVEN DUBNER LANDSCAPING01/12/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR12/09/2025
DOB NOWStructuralPermit IssuedSTEVEN DUBNER LANDSCAPING12/05/2025
DOB NOWGeneral ConstructionPermit IssuedSTEVEN DUBNER LANDSCAPING11/19/2025
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC06/26/2024
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC06/26/2024
DOB NOWMechanical SystemsSigned-offGOHAR CONSTRUCTION CORP08/04/2023
DOB NOWStructuralSigned-offGOHAR CONSTRUCTION CORP08/04/2023
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC07/25/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI12/20/2022
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC10/06/2022
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC09/22/2022
DOB NOWMechanical SystemsSigned-offGOHAR CONSTRUCTION CORP09/02/2022
DOB NOWStructuralSigned-offGOHAR CONSTRUCTION CORP07/28/2022
BISOTISSUEDSKY HEIGHTS CONSTRUCTION02/22/2022
BISOTISSUEDLO SARDO GENERAL CONTRACTORS09/12/2019
BISMHISSUEDLO SARDO GENERAL CONTRACTORS04/23/2019
BISMHISSUEDJGM CONSTRUCTION DEVELOPMENT07/27/2018
BISOTISSUEDLO SARDO GENERAL CONTRACTORS10/05/2017
BISOTISSUEDLO SARDO GENERAL CONTRACTORS04/25/2017
BISOTISSUEDGEOMATRIX SERVICES INC11/21/2013
BISFPISSUEDFIREMASTERS04/13/2010
BISOTISSUEDSCORCIA & DIANA ASSOCS INC04/02/2004
BISOTISSUEDPLAZA CONST CORP10/01/2003
BISEQISSUEDGRAMERCY GROUP, INC07/18/2003
BISOTISSUEDGRAMERCY GROUP, INC06/25/2003
BISPLISSUEDALMAR PLUMBING & HEATING CORP .11/14/2002
BIS—ISSUEDPLATO GEN. CONST./EMCO TECH CONS06/19/2002
BISSPISSUEDMANENGEERING BUREAU INC04/11/2002
BISPLISSUEDALMAR PLBG & HTG CORP02/05/2002
BIS—ISSUEDPLATO GEN. CONST./EMCO TECH CONS05/31/2001
BISPLISSUEDALMAR PLUMBING & HEATING CORP .01/23/2001
BISPLISSUEDALMAR PLUMBING & HEATING CORP .02/07/2000
BIS—ISSUEDPLATO GENERAL. CONS. JOINT VENTU01/28/2000
BISPLISSUEDBYPASS MECHANICAL CORP07/31/1998
BISOTISSUEDMINCH CONSTRUCTION CORP04/28/1998
BISSDISSUEDM & J PLUMBING & MECHANICAL COMP10/25/1995
BISOTISSUEDROY KAY, INC.04/11/1995
BISBLISSUEDROY KAY, INC.03/29/1995
+ 7 more permits on file
1 project · most recent 04/02/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane TUHYE0723AN41AN 72,000 BTU · Condensing Unit ×1
Ventilation
Trane TPEFYP054MH142A 54,000 BTU · Fan Coil Indoor ×1
1 project · most recent 02/13/2026
Water/Sanitary
FiledStatusContractorScope
02/13/2026Signed-offINFINITI ESC PLUMBING CORWater/Sanitary
3 projects · most recent 08/10/2022
General Wiring Lighting
FiledStatusContractorScope
08/10/2022CompleteCORE ELECTRIC MEP INDS LLGeneral Wiring, Lighting
10/19/2020CompleteLABCO ELETRT CONTNG CORPGeneral Wiring
02/09/2018CompleteJ.H. ELEC. OF NEW YORK INGeneral Wiring
1 project · most recent 02/13/2026
FiledStatusContractorScope
02/13/2026Signed-offINFINITI ESC PLUMBING COR2 scope_items
1 project · most recent 02/13/2026
Earthwork
FiledStatusContractorScope
02/13/2026Signed-offINFINITI ESC PLUMBING COREarthwork
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
09/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2026Pass-Final PL - UndergroundPassView ↗
04/09/2026Pass-Final PL - UndergroundPassView ↗
03/18/2026Pass-Final PL - UndergroundPassView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2024Pass-Final House ConnectionPassView ↗
09/09/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
02/24/2026Concrete - Cast-In-PlaceMARISA HARTEspecial
02/24/2026Concrete - PrecastMARISA HARTEspecial
02/24/2026Subgrade InspectionsMARISA HARTEspecial
02/24/2026Excavations - Sheeting, Shoring, and BracingMARISA HARTEspecial
02/24/2026Footing and FoundationMARISA HARTEprogress
02/24/2026FinalMARISA HARTEprogress
02/24/2026Subsurface Conditions – Fill Placement & In-Place DensityMARISA HARTEspecial
01/16/2026Subgrade InspectionsMARISA HARTEspecial
01/16/2026Subsurface Conditions – Fill Placement & In-Place DensityMARISA HARTEspecial
01/16/2026Concrete - PrecastMARISA HARTEspecial
01/16/2026Excavations - Sheeting, Shoring, and BracingMARISA HARTEspecial
01/16/2026Excavations - Sheeting, Shoring, and BracingMARISA HARTEspecial
01/09/2026FinalMARISA HARTEprogress
01/09/2026Concrete - Cast-In-PlaceMARISA HARTEspecial
01/09/2026Footing and FoundationMARISA HARTEprogress
11/24/2025FinalMINA MIKAEELprogress
09/20/2023Energy Code Compliance InspectionsStephen Marcheseprogress
09/20/2023HVAC-R and service water piping design and insulationStephen Marcheseenergy_progress
09/14/2023Energy Code Compliance InspectionsStephen Marcheseprogress
09/14/2023HVAC-R and service water piping design and insulationStephen Marcheseenergy_progress
06/16/2023FinalGeorge Ozgaprogress
06/16/2023Structural Steel - WeldingStephen Marchesespecial
06/09/2023HVAC-R and service water piping design and insulationStephen Marcheseenergy_progress
06/09/2023Energy Code Compliance InspectionsStephen Marcheseprogress
▾Documents — 199 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/31/2026B00654719-P1Request digital key ↗
08/31/2026B00654731-I1Request digital key ↗
08/31/2026B00654731-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION11
06/25/2020340732372Open ↗
07/06/2018340606838Open ↗
01/02/2018321703108Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION8
02/22/2022340732372Open ↗
09/23/2019321203425Open ↗
07/27/2018340606838Open ↗
Showing 3 of 8 on file for this type
▸BISPLACE OF ASSEMBLY7
10/23/2019321472517Open ↗
10/23/2019321472517Open ↗
10/23/2019321472517Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/23/2019321472517Open ↗
08/07/2019321472508Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
02/10/2022340732372Open ↗
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/31/2026B00654719-I1Open ↗
08/31/2026B00654719-P1Open ↗
08/31/2026B00654731-P2Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
11/23/2019321203425Open ↗
11/23/2019321203425Open ↗
11/23/2019321203425Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026B00654731-P1Open ↗
09/02/2026B00654719-P1Open ↗
09/01/2026B01235948-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00654719-P1Open ↗
09/01/2026B01235948-P2Open ↗
08/27/2026B01235948-S5Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/25/2020340732372Open ↗
07/06/2018340606838Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/25/2020340732372Open ↗
07/06/2018340606838Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/25/2020340732372Open ↗
07/06/2018340606838Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/22/2013320758569Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/22/2013320758569Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
05/22/2013320758569Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/24/2017320957666Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026B00573466-I1Open ↗
08/19/2026B01235948-I1Open ↗
08/19/2026B01235948-S3Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/06/2018340606838Open ↗
09/03/2014320957666Open ↗
05/22/2013320758569Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/31/2026B00654731-I1Open ↗
08/15/2026B00654719-I1Open ↗
08/13/2026B00654727-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
02/10/2022340732372Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/01/2010320146374Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/03/2022340732372Open ↗
02/10/2022340732372Open ↗
06/25/2020340732372Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/23/2019321203425Open ↗
11/23/2019321203425Open ↗
12/28/2018340606838Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/25/2020340732372Open ↗
07/06/2018340606838Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/03/2022340732372Open ↗
11/23/2019321203425Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00654727-I1Open ↗
08/13/2026B00654731-I1Open ↗
▸BISNYCECC ANALYSIS1
06/25/2020340732372Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/03/2022340732372Open ↗
02/10/2022340732372Open ↗
06/25/2020340732372Open ↗
Showing 3 of 4 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
10/23/2019321472517Open ↗
08/07/2019321472508Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/10/2022340732372Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
12/28/2018340606838Open ↗
▸Approvals, Objections & Sign-offs29
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/31/2026B00654719-P1Open ↗
08/31/2026B00654731-P2Open ↗
08/31/2026B00654731-I1Open ↗
Showing 3 of 17 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/04/2022340732372Open ↗
11/23/2019321203425Open ↗
12/28/2018340606838Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
09/03/2014320957666Open ↗
05/23/2013320758569Open ↗
04/01/2010320146374Open ↗
▸DOB NOWDEP Variance (V5) letter3
08/31/2026B00654731-I1Open ↗
08/15/2026B00654719-I1Open ↗
08/13/2026B00654727-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/22/2022340732372Open ↗
09/03/2014320957666Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
03/03/2022340732372Open ↗
06/25/2020340732372Open ↗
11/23/2019321203425Open ↗
Showing 3 of 11 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
07/27/2018340606838Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET7
01/02/2018321703108Open ↗
08/19/2015321203425Open ↗
08/19/2015321203425Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/25/2020340732372Open ↗
07/06/2018340606838Open ↗
▸BISADDITIONAL INFORMATION2
05/01/2017321203425Open ↗
11/24/2015321203425Open ↗
▸BISBOROUGH INTAKE FORM2
11/23/2019321203425Open ↗
12/28/2018340606838Open ↗
▸Other Documents3
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01235948-S2Open ↗
08/13/2026B01235948-S5Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
01/02/2018321703108Open ↗