Elevator apt, fireproof without stores
Cooper Park (NYCHA)
290 FROST STREET · BIN 3327829
💬 Discuss this project
1950Year Built
8Stories
D3Building Class
R6Zoning
611,340 sfGross Floor Area
700Units
LL97 Covered11 Active Violations 7 unresolved · 4 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 510,960 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFISP Inspection using Industrial Rope Access1p · 1 filing · 4 docs
Floor 1State Phase II a Boiler Replacement and Hot Water HeatersUnder Construction3p · 1 filing · 20 docs
CellarState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction114p · 2 filings · 20 docs
Site & exteriorState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction52p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5907/08/2026
City of NY Cooper Park103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering1410/23/2025
Ismael Leyva Architect's410/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tarek M. Zeid, P.E803/21/2026
JMV Assosiates103/21/2026
Smep Design & Consultation203/21/2026
Tarek M Zeid P E803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic USGeneral Contractor1807/08/2026
Dynamic ContractingPlumbing807/08/2026
M & M Elect'l ContractingElectrical203/21/2026
Skyline P & HPlumbing203/22/2026
Waschitz NElectrical103/21/2026
HY-Lee Electric CoElectrical103/21/2026
Alliance Elevator CompanyElectrical103/21/2026
Polaris Electrical ConstructionElectrical103/21/2026
Stasi/Dallas Electrical ContElectrical103/21/2026
Polaris Electrical ConstructionElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Distinct Engineering Solu26411510/23/2025
Building Lifecycle
All (128)Filed (19)Permit Issued (21)Signed Off (1)Facade (FISP) (14)Violation (26)Inspection (5)Objection (12)Special Inspection (30)
06/22/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01129633-I1
06/09/2026
Permit issued — Suspended Scaffold
B01129633-I1-SC
05/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Permit issued — Structural
B00443693-S1-ST
03/16/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/04/2026
Permit issued — General Construction
B00443693-S4-GC
01/08/2026
Permit issued — Mechanical Systems
B00443693-I1-MS
01/08/2026
Permit issued — Mechanical Systems
B00443693-I1-MS
01/05/2026
Permit issued — Plumbing
B00444062-I1-PL
12/24/2025
Special inspection requirement — Energy Code Compliance Inspections
YAZAN YANES
12/24/2025
Special inspection requirement — Mechanical Systems
YAZAN YANES
12/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
12/24/2025
Special inspection requirement — HVAC insulation and sealing
Ramnarayan Tirumala
12/24/2025
Special inspection requirement — Heating Systems
YAZAN YANES
12/24/2025
Special inspection requirement — Final
YAZAN YANES
12/24/2025
Special inspection requirement — HVAC and service water heating equipment
Ramnarayan Tirumala
12/24/2025
Special inspection requirement — Chimneys and vents
YAZAN YANES
12/24/2025
Special inspection requirement — HVAC and service water heating system controls
Ramnarayan Tirumala
12/09/2025
Objection resolved — Addressed
12/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/27/2025
Objection raised — Other
10/23/2025
Filed — Alteration
NYCHA BOILER- Bldg 4- Natural Gas piping will be run underground from gas meter room and domestic hot water heater rooms
B00443693-P9
10/04/2025
Violation issued (FDNY_NOV, closed)
10/03/2025
Special inspection requirement — Final
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Mechanical Systems
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Heating Systems
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — Chimneys and vents
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — HVAC and service water heating system controls
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — HVAC and service water heating equipment
Ramnarayan Tirumala
10/03/2025
Special inspection requirement — HVAC insulation and sealing
Ramnarayan Tirumala
04/23/2025
Permit issued — Plumbing
B00443693-S2-PL
04/11/2025
Permit issued — Structural
B00443693-S1-ST
03/06/2025
Permit issued — General Construction
B00443693-S4-GC
02/04/2025
Permit issued — Plumbing
B00444062-I1-PL
12/06/2024
Permit issued — Suspended Scaffold
B01129633-I1-SC
11/29/2024
Objection raised — Other
11/29/2024
Objection resolved — Addressed
11/19/2024
Filed — Alteration
NYCHA BOILER- Bldg 4- Natural Gas piping will be run underground from gas meter room and domestic hot water heater rooms
B00443693-P8
11/18/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01129633-I1
10/25/2024
Permit issued — Mechanical Systems
B00443693-I1-MS
10/23/2024
Filed — Alteration
NYCHA BOILER- Bldg 4- Natural Gas piping will be run underground from gas meter room and domestic hot water heater rooms
B00443693-P7
09/04/2024
Special inspection requirement — Masonry
Ramnarayan Tirumala
09/04/2024
Special inspection requirement — Concrete - Cast-In-Place
Ramnarayan Tirumala
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
09/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ramnarayan Tirumala
05/31/2024
Filed — Alteration
Building #4-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans
B00444062-P3
05/22/2024
Special inspection requirement — Post-installed Anchors
05/17/2024
Permit issued — Plumbing
B00443693-S2-PL
04/30/2024
Filed — Alteration
NYCHA BOILER- Bldg 4- Natural Gas piping will be run underground from gas meter room and domestic hot water heater rooms
B00443693-P6
04/08/2024
Permit issued — Structural
B00443693-S1-ST
04/05/2024
Permit issued — General Construction
B00443693-S4-GC
03/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
01/10/2024
Permit issued — Plumbing
B00444062-I1-PL
10/24/2023
Permit issued — Mechanical Systems
B00443693-I1-MS
08/25/2023
Violation issued (FDNY_NOV, closed)
08/18/2023
Permit issued — General Construction
B00443693-S3-GC
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/09/2026
DOB NOWStructuralPermit IssuedDynamic US04/17/2026
DOB NOWGeneral ConstructionPermit IssuedDynamic US02/04/2026
DOB NOWMechanical SystemsPermit IssuedDynamic US01/08/2026
DOB NOWMechanical SystemsPermit IssuedDynamic US01/08/2026
DOB NOWPlumbingSigned-offDynamic Contracting01/05/2026
DOB NOWPlumbingPermit IssuedDynamic Contracting04/23/2025
DOB NOWStructuralPermit IssuedDynamic US04/11/2025
DOB NOWGeneral ConstructionPermit IssuedDynamic US03/06/2025
DOB NOWPlumbingSigned-offDynamic Contracting02/04/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/06/2024
DOB NOWMechanical SystemsPermit IssuedDynamic US10/25/2024
DOB NOWPlumbingPermit IssuedDynamic Contracting05/17/2024
DOB NOWStructuralPermit IssuedDynamic US04/08/2024
DOB NOWGeneral ConstructionPermit IssuedDynamic US04/05/2024
DOB NOWPlumbingSigned-offDynamic Contracting01/10/2024
DOB NOWMechanical SystemsPermit IssuedDynamic US10/24/2023
DOB NOWGeneral ConstructionPermit IssuedDynamic US08/18/2023
DOB NOWPlumbingPermit IssuedDynamic Contracting06/15/2023
DOB NOWGeneral ConstructionPermit IssuedDynamic US05/05/2023
DOB NOWStructuralPermit IssuedDynamic US05/03/2023
BISOTISSUEDM.S.T. General Contracting03/05/2015
BISOTISSUEDM.S.T. General Contracting03/05/2015
BISOTISSUEDM.S.T. General Contracting10/20/2014
BISOTISSUEDM.S.T. General Contracting07/31/2014
BISEQISSUEDM.S.T. General Contracting05/02/2014
BISEQISSUEDM.S.T. General Contracting04/29/2014
BISFPISSUEDAllied Fire Control Services01/22/2014
BISEQISSUEDMetropolitan Enterprises05/07/2013
BISEQISSUEDMetropolitan Enterprises05/07/2012
BISEQISSUEDMetropolitan Enterprises05/20/2011
BISEQISSUEDMetropolitan Enterprises05/27/2010
BISEQISSUEDMetropolitan Enterprises11/23/2009
BISEQISSUEDNavtech Construction02/12/2007
BISEQISSUEDLilly Construction Co04/18/2003
BISSPISSUEDAxiom Plumbing and Heating06/05/1995
BISOTISSUEDAha General Construction03/07/1995
BISSPISSUEDAxiom Plumbing and Heating01/20/1995
BISPLISSUEDAllocca Mechanical Plumbing & Heating04/29/1991
BISFPISSUEDFire Command Co03/08/1991
1 project · most recent 10/23/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/23/2025Permit IssuedDynamic USHeating Systems
Heating
Us Draft TRV-8 205 CFM · Exhaust Fan ×2
2 projects · most recent 10/23/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/23/2025Permit IssuedDynamic ContractingGas
05/31/2024Signed-offDynamic ContractingGas, Water/Sanitary
6 projects · most recent 04/09/2025
General Wiring
FiledStatusContractorScope
04/09/2025CompletePolaris Electrical Construction—
02/14/2025CompletePolaris Electrical ConstructionGeneral Wiring
12/31/2024CancelledDynamic Electric SystemGeneral Wiring
02/22/2023CompleteTru-Val ElectricGeneral Wiring
10/08/2020CompleteJemco Electric Contractors—
09/10/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
1 project · most recent 10/23/2025
Steel Concrete Masonry
FiledStatusContractorScope
10/23/2025Permit IssuedDynamic USSteel, Concrete, Masonry
1 project · most recent 11/18/2024
FiledStatusContractorScope
11/18/2024Signed-offStructural Preservation System—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
12/24/2025Energy Code Compliance InspectionsYAZAN YANESprogress
12/24/2025Mechanical SystemsYAZAN YANESspecial
12/24/2025Fire-Resistant Penetrations and JointsYAZAN YANESspecial
12/24/2025HVAC insulation and sealing Ramnarayan Tirumalaenergy_progress
12/24/2025Heating SystemsYAZAN YANESspecial
12/24/2025FinalYAZAN YANESprogress
12/24/2025HVAC and service water heating equipment Ramnarayan Tirumalaenergy_progress
12/24/2025Chimneys and ventsYAZAN YANESspecial
12/24/2025HVAC and service water heating system controls Ramnarayan Tirumalaenergy_progress
10/03/2025FinalRamnarayan Tirumalaprogress
10/03/2025Energy Code Compliance InspectionsRamnarayan Tirumalaprogress
10/03/2025Mechanical SystemsRamnarayan Tirumalaspecial
10/03/2025Heating SystemsRamnarayan Tirumalaspecial
10/03/2025Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
10/03/2025Chimneys and ventsRamnarayan Tirumalaspecial
10/03/2025HVAC and service water heating system controls Ramnarayan Tirumalaenergy_progress
10/03/2025HVAC and service water heating equipment Ramnarayan Tirumalaenergy_progress
10/03/2025HVAC insulation and sealing Ramnarayan Tirumalaenergy_progress
09/04/2024MasonryRamnarayan Tirumalaspecial
09/04/2024Concrete - Cast-In-PlaceRamnarayan Tirumalaspecial
09/04/2024Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
09/04/2024Fire-Resistance Rated ConstructionRamnarayan Tirumalaprogress
05/22/2024Post-installed Anchors—special
03/26/2024Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
04/12/2023Structural Stability – Alterations of existing buildingsYAZAN YANESspecial
Latest 25 of 48.
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch11
08/27/2026B00443693-S3Request digital key ↗
08/27/2026B00443693-S2Request digital key ↗
08/27/2026B00443693-P6Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026B00444062-P1Request digital key ↗
09/01/2026B00444062-P3Request digital key ↗
09/01/2026B00444062-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/27/2026B00443693-I1Request digital key ↗
08/27/2026B00443693-P8Request digital key ↗
08/15/2026B00443693-P5Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION10
08/01/2014320831150Open ↗
05/01/2014340136739Open ↗
04/29/2014340136757Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
09/18/2014320831150Open ↗
05/01/2014340136739Open ↗
04/29/2014340136757Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications61
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
05/08/2015320831150Open ↗
05/08/2015320831150Open ↗
04/07/2015320831150Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/01/2026B00444062-P2Open ↗
09/01/2026B00444062-P1Open ↗
09/01/2026B00444062-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/27/2026B00443693-S1Open ↗
08/28/2026B00443693-I1Open ↗
08/28/2026B00443693-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/27/2026B00443693-S1Open ↗
09/23/2026B00444062-P3Open ↗
08/30/2026B00443693-S3Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/01/2014340136739Open ↗
04/29/2014340136757Open ↗
04/29/2014340136748Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/01/2014340136739Open ↗
04/29/2014340136757Open ↗
04/29/2014340136748Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/01/2014340136739Open ↗
04/29/2014340136757Open ↗
04/29/2014340136748Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/23/2009320097863Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/23/2009320097863Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
05/02/2014320816364Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan7
08/13/2026B00443693-P8Open ↗
08/13/2026B00443693-P9Open ↗
08/13/2026B00444062-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/01/2026B00444062-I1Open ↗
09/01/2026B00444062-P3Open ↗
09/01/2026B00444062-P2Open ↗
Showing 3 of 17 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/08/2015320831150Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/23/2009320097863Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/28/2013320816364Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/08/2015320831150Open ↗
04/07/2015320831150Open ↗
12/12/2013320831150Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/08/2015320831150Open ↗
04/07/2015320831150Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/29/2014340136757Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/25/2014320831150Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/01/2014340136739Open ↗
04/29/2014340136757Open ↗
04/29/2014340136748Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/24/2014320816364Open ↗
01/10/2014320097863Open ↗
▸Approvals, Objections & Sign-offs54
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/01/2026B00444062-P2Open ↗
09/01/2026B00444062-P1Open ↗
09/01/2026B00444062-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)18
08/13/2026B00443693-P4Open ↗
08/13/2026B00444062-I1Open ↗
08/13/2026B00444062-P1Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/08/2015320831150Open ↗
04/07/2015320831150Open ↗
03/04/2015340136739Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
12/28/2013320816364Open ↗
08/21/2013320831150Open ↗
11/23/2009320097863Open ↗
▸DOB NOWDEP Variance (V5) letter3
08/27/2026B00443693-S3Open ↗
08/27/2026B00443693-S2Open ↗
08/27/2026B00443693-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00443693-S3Open ↗
08/13/2026B00443693-S2Open ↗
08/13/2026B00443693-S4Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/01/2014320831150Open ↗
05/02/2014320816364Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
05/08/2015320831150Open ↗
04/07/2015320831150Open ↗
05/02/2014320816364Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET3
12/28/2013320816364Open ↗
08/24/2013320831150Open ↗
11/23/2009320097863Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
05/01/2014340136739Open ↗
04/29/2014340136757Open ↗
04/29/2014340136748Open ↗
▸BISADDITIONAL INFORMATION2
10/24/2014320831150Open ↗
09/18/2014320831150Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01129633-I1Open ↗