Elevator apt, fireproof with stores
2901 BROADWAY
MANHATTAN · BIN 1057350
💬 Discuss this project
1910Year Built
12Stories
D6Building Class
R8Zoning
178,897 sfGross Floor Area
141Units
LL97 CoveredRent Stabilized14 Open Violations 12 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: TRUSTEES OF COLUMBIA UNIVERSITY · 17,592 sf lot · 10.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof5p · 5 filings · 20 docs
Floor 124p · 8 filings · 20 docs
Cellar18p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GARAGE MANAGEMENT COMPANY407/08/2026
COLUMBIA RESIDENTIAL3807/08/2026
NEW ROC CONTRACTING1607/08/2026
HENRY RESTORATION LIMITED303/22/2026
OWNER OF 601 WEST 113 STR103/22/2026
COLUMBIA HARDWARE CO103/22/2026
OWNER OF 2911 BROADWAY103/22/2026
COLUMBIA203/22/2026
MBR CONTRACTING INC103/21/2026
MAMAIS CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHALAT ARCHITECTS P C603/21/2026
RICHARD LEWIS ARCHITECT103/21/2026
METROPOLIS GROUP INC3203/21/2026
LMS-ACE SERVICES203/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
PS ENGINEERS203/21/2026
HS DESIGN STUDIO403/21/2026
Enviornmental & Energy Solutions103/21/2026
RYBAK DEVELOPMENT203/21/2026
EA DESIGN GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor1407/08/2026
ALAFOGIANNIS PLBG & HTGPlumbing307/08/2026
NEW ROC CONTRACTING CORPGeneral Contractor307/08/2026
CRUGNALE, MICHAELElectrical303/21/2026
GO PRO FIRE PROTECTION CFire Protection307/08/2026
DIFUSCO, ALFONSOElectrical303/21/2026
DUNN, JEREMYElectrical303/21/2026
FIRE ZONE VENTILATION & SGeneral Contractor203/21/2026
PSI FIRE CORPPlumbing207/08/2026
DC BUILDING SERVICES INCFire Protection207/08/2026
MAMAIS CONTRACTING CORPGeneral Contractor203/21/2026
AMERICAN CONSTRUCTION MANGeneral Contractor207/08/2026
TSANG CONSTRUCTION, INCGeneral Contractor203/21/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor207/08/2026
WADE RAY & ASSOC CONST INGeneral Contractor203/21/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
AUTHORIZED PLBG&HTG SVCPlumbing107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
M&T PLBG AND HTG CO., INCPlumbing107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
WILLIAM C. GERAKARIS P&HPlumbing107/08/2026
CANAVAN, ANDREWElectrical103/21/2026
HESCOTT, CARDINALElectrical103/21/2026
JAROSLAW KURACHElectrical103/21/2026
JOSEPH BRAMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JEON CONSULTING5119909/24/2024
GEORGE J. XERAKIAS, PE1658106/25/2024
AA BUILDING & INSPECTION1519101/06/2023
EDG2578101/06/2023
MIRELLA BOSELLI R.A.6330110/31/2022
SOCOTEC, INC.301108/25/2022
COLE TECHNOLOGIES/CONTROL12901209/09/2021
SKYLINE ENGINEERING, PLLC267101/13/2020
ARCHITECTURAL ENGINEERING6111208/22/2019
SHALAT ARCHITECTS P.C.2036108/22/2019
Building Lifecycle
All (231)Filed (52)Permit Issued (39)Signed Off (22)Facade (FISP) (15)Violation (60)Inspection (11)Objection (2)Special Inspection (30)
06/26/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01236249-I1
12/17/2025
Cycle 10 facade inspection completed
12/17/2025
Cycle 10 facade report signed — SAFE
10/29/2025
Cycle 10 facade report submitted
10/07/2025
Signed off — Alteration
M00730917-I1
10/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01117591-I1
09/22/2025
Permit issued — Sidewalk Shed
M01117591-I1-SH
07/31/2025
Permit issued — Suspended Scaffold
M01236249-I1-SC
07/30/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01236249-I1
06/17/2025
Violation issued (HPD, open)
C
06/17/2025
Violation issued (HPD, open)
C
04/25/2025
Violation issued (HPD, open)
C
04/25/2025
Violation issued (HPD, open)
C
04/25/2025
Violation issued (HPD, open)
A
04/24/2025
Filed — No Work
M01100119-P2
03/13/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01060815-I1
03/13/2025
Permit issued — Suspended Scaffold
M01060815-I1-SC
12/18/2024
Filed — No Work
M01100119-P1
12/17/2024
Special inspection requirement — Public Assembly Emergency Lighting
Ari Kamo
12/12/2024
Signed off — Alteration
TO INSTALL KITCHEN DUCT AND FANS.
M08048255-I1
10/16/2024
Signed off — Alteration
TO INSTALL COOKING AND PLUMBING FIXTURES FOR A KITCHEN AT EATING AND DRINKING. WORK TO INSTALL (3) F/D, (11) SINK, (1) 3-COM SINK, (1) G/T, (1) COMBI OVEN, (1) TILT SKILLET, (2) FRYER, (1) WOK RANGE, (1) HWH. TO REPLACE 1-W/C & 1-LAV.
M08048191-I1
10/09/2024
Permit issued — Suspended Scaffold
M01117596-I1-SC
09/30/2024
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
M01117596-I1
09/26/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01117591-I1
09/26/2024
Permit issued — Sidewalk Shed
M01117591-I1-SH
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
BENJAMIN JEON
09/24/2024
Filed — Alteration
TO INSTALL COOKING AND PLUMBING FIXTURES FOR A KITCHEN AT EATING AND DRINKING. WORK TO INSTALL (3) F/D, (11) SINK, (1) 3-COM SINK, (1) G/T, (1) COMBI OVEN, (1) TILT SKILLET, (2) FRYER, (1) WOK RANGE, (1) HWH. TO REPLACE 1-W/C & 1-LAV.
M08048191-P5
08/30/2024
Objection resolved — Addressed
08/27/2024
Objection raised — Scope
08/22/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M08051953-I1
08/22/2024
Filed — No Work
M01100119-I1
08/22/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00921560-I1
08/14/2024
Permit issued — Supported Scaffold
M00921560-I1-SF
08/09/2024
Signed off — Alteration
M00980591-I1
07/11/2024
Cycle 9 facade report signed — SWARMP
06/25/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01060815-I1
06/24/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
06/14/2024
Special inspection requirement — Energy Code Compliance Inspections
BENJAMIN JEON
06/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
06/04/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
05/30/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00921560-P2
05/22/2024
Filed — Alteration
Register two AO Smith Hot Water Heaters (164190-03, 164190-04) and obtain inspection sign-off.
M00745319-I1
04/01/2024
Violation issued (HPD, closed)
A
02/21/2024
Cycle 9 facade report submitted
02/08/2024
Cycle 9 facade inspection completed
02/02/2024
Permit issued — General Construction
M00730917-I1-GC
01/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/10/2024
Permit issued — Suspended Scaffold
M00980591-I1-SC
12/21/2023
Filed — Alteration
M00980591-I1
12/08/2023
Permit issued — Sidewalk Shed
M08051953-I1-SH
10/27/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00921560-P1
10/27/2023
Filed — Alteration
TO INSTALL COOKING AND PLUMBING FIXTURES FOR A KITCHEN AT EATING AND DRINKING. WORK TO INSTALL (3) F/D, (11) SINK, (1) 3-COM SINK, (1) G/T, (1) COMBI OVEN, (1) TILT SKILLET, (2) FRYER, (1) WOK RANGE, (1) HWH. TO REPLACE 1-W/C & 1-LAV.
M08048191-P4
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
10/10/2023
Special inspection requirement — Energy Code Compliance Inspections
BENJAMIN JEON
08/22/2023
Permit issued — Supported Scaffold
M00921560-I1-SF
08/21/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00921560-I1
06/22/2023
Permit issued — General Construction
M08018261-I1-GC
06/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/22/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/31/2025
DOB NOWSuspended ScaffoldPermit IssuedNEW ROC CONTRACTING CORP03/13/2025
DOB NOWSuspended ScaffoldPermit IssuedJC SANTANA CONTRACTING CO10/09/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/26/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/14/2024
DOB NOWGeneral ConstructionSigned-offNEW ROC CONTRACTING CORP02/02/2024
DOB NOWSuspended ScaffoldSigned-offUNITED REST. AND DEV. COR01/10/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/08/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/22/2023
DOB NOWGeneral ConstructionPermit IssuedVANGUARD CONSTRUCTION AND06/22/2023
DOB NOWMechanical SystemsSigned-offFIRE ZONE VENTILATION S02/08/2023
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H02/07/2023
DOB NOWGeneral ConstructionSigned-offNEW ROC CONTRACTING CORP01/31/2023
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP01/20/2023
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP01/10/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/16/2022
DOB NOWGeneral ConstructionPermit IssuedVANGUARD CONSTRUCTION AND12/10/2022
DOB NOWGeneral ConstructionSigned-offNEW ROC CONTRACTING CORP10/27/2022
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG07/21/2022
DOB NOWGeneral ConstructionSigned-offMAMAIS CONTRACTING CORP07/11/2022
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG07/14/2021
DOB NOWSprinklersSigned-offDC BUILDING SERVICES INC06/02/2021
DOB NOWSprinklersSigned-offDC BUILDING SERVICES INC06/02/2021
DOB NOWMechanical SystemsSigned-offALL RENOVATION CONSTRUCT04/30/2021
DOB NOWMechanical SystemsSigned-offWADE RAY & ASSOC CONST IN04/14/2021
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG03/03/2021
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C12/01/2020
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C11/19/2020
DOB NOWMechanical SystemsPermit IssuedTSANG CONSTRUCTION, INC10/05/2020
DOB NOWPlumbingSigned-offAUTHORIZED PLBG&HTG SVC06/30/2020
DOB NOWPlumbingSigned-offPSI FIRE CORP03/19/2020
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C02/19/2020
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG01/27/2020
DOB NOWPlumbingSigned-offM&T PLBG AND HTG CO., INC01/27/2020
DOB NOWSprinklersSigned-offH.J. FLOOD INC.11/07/2019
DOB NOWPlumbingSigned-offPSI FIRE CORP09/05/2019
DOB NOWMechanical SystemsSigned-offAMERICAN CONSTRUCTION MAN08/23/2019
DOB NOWConstruction FenceSigned-offAMERICAN CONSTRUCTION MAN08/01/2019
BISOTISSUEDALL RENOVATION CONSTRUCT09/29/2020
+ 49 more permits on file
1 job · most recent 01/13/2020
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/13/2020Permit IssuedTSANG CONSTRUCTION, INCAir Conditioning Systems, Ventilation Systems
Cooling
Task TGC-103Z 122,400 BTU · Condensing Unit ×1
TGE-103 64,800 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck SQ-120-VG 1,000 CFM · Exhaust Fan ×1
SQ-130-A 500 CFM · Exhaust Fan ×1
SQ-70-G 70 CFM · Exhaust Fan ×1
1 job · most recent 01/13/2020
Water/Sanitary
FiledStatusContractorScope
01/13/2020Signed-offAUTHORIZED PLBG&HTG SVCWater/Sanitary
13 jobs · most recent 07/21/2023
General Wiring
FiledStatusContractorScope
07/21/2023CompleteZEREM ELECTRIC CORP.General Wiring
05/31/2023CompleteNEE ELECTRICAL, LLC—
12/28/2022CompleteBOROWIDE ELECT'L CONTR'S—
12/21/2022Permit IssuedL.E.A. ELECTRIC CORP.General Wiring
11/01/2022CompleteE & M ELECTRICAL NY CORPGeneral Wiring
11/12/2020Permit IssuedALSON ELEC'L CONTR. INCGeneral Wiring
10/20/2020CompleteKJK ELECTRIC INC1 meters
10/12/2020CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
05/06/2020CompleteE & M ELECTRICAL NY CORPGeneral Wiring
02/15/2020CompleteKJK ELECTRIC INCGeneral Wiring
08/12/2019CompletePAPPAS & FODERA ELECT'LGeneral Wiring
12/02/2018CompletePLATINUM ELEC'L SVC. INCGeneral Wiring
06/13/2018Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
2 jobs · most recent 07/30/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/30/2025Signed-offSTRUCTUAL PRESV SYSTEM—
09/30/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/17/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/14/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
12/17/2024Public Assembly Emergency LightingAri Kamoprogress
09/26/2024Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
09/26/2024Energy Code Compliance InspectionsBENJAMIN JEONprogress
06/24/2024Post-installed AnchorsGeorge Xerakiasspecial
06/14/2024Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
06/14/2024Energy Code Compliance InspectionsBENJAMIN JEONprogress
06/04/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
01/19/2024Tenant Protection Plan Compliance—special
10/10/2023Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
10/10/2023Energy Code Compliance InspectionsBENJAMIN JEONprogress
04/26/2023Duct leakage testing, insulation and designBENJAMIN JEONenergy_progress
04/26/2023FinalBENJAMIN JEONprogress
04/26/2023Energy Code Compliance InspectionsBENJAMIN JEONprogress
04/26/2023Mechanical SystemsBENJAMIN JEONspecial
04/14/2023FinalBENJAMIN JEONprogress
04/14/2023Energy Code Compliance InspectionsBENJAMIN JEONprogress
04/14/2023Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
04/14/2023Mechanical SystemsBENJAMIN JEONspecial
04/14/2023Duct leakage testing, insulation and designBENJAMIN JEONenergy_progress
04/14/2023Energy Code Compliance InspectionsBENJAMIN JEONprogress
01/25/2023Permanent certificatePeter Vottoenergy_progress
01/25/2023Energy Code Compliance InspectionsPeter Vottoprogress
01/23/2023FinalBENJAMIN JEONprogress
01/23/2023Energy Code Compliance InspectionsBENJAMIN JEONprogress
01/23/2023Mechanical SystemsBENJAMIN JEONspecial
Latest 25 of 75.
▾Documents — 1,079 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch23
09/02/2026M00730917-I1Request digital key ↗
09/01/2026M08018261-I1Request digital key ↗
09/01/2026M08048255-P1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler9
09/05/2026M00200084-I1Request digital key ↗
09/05/2026M00283159-I1Request digital key ↗
09/03/2026M00255650-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00200067-I1Request digital key ↗
09/05/2026M00276996-I1Request digital key ↗
09/05/2026M00282965-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00200076-I1Request digital key ↗
09/05/2026M00277054-I1Request digital key ↗
09/05/2026M00283081-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/26/2026M01100119-P1Request digital key ↗
08/26/2026M01100119-P2Request digital key ↗
08/26/2026M01100119-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00198808-I1Request digital key ↗
▸Applications & Permits193
▸BISWORK PERMIT APPLICATION98
10/08/2020123845045Open ↗
06/30/2020140918309Open ↗
06/29/2020140918309Open ↗
Showing 3 of 98 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION93
09/18/2024123845045Open ↗
09/13/2024123845045Open ↗
04/29/2024123845045Open ↗
Showing 3 of 93 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications259
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION106
09/30/2020123845045Open ↗
02/05/2020123798444Open ↗
01/24/2020123801243Open ↗
Showing 3 of 106 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature45
09/05/2026M00200067-I1Open ↗
09/05/2026M00277054-I1Open ↗
09/05/2026M00276996-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
09/07/2026M08048191-P5Open ↗
09/01/2026M00198808-I1Open ↗
09/01/2026M00200067-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/07/2026M08048191-P5Open ↗
09/02/2026M00255650-P3Open ↗
09/02/2026M00283016-P1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
01/31/2020123845045Open ↗
01/16/2020123798444Open ↗
01/06/2020123728591Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
10/05/2020140959915Open ↗
06/26/2020140918309Open ↗
01/31/2020123845045Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/05/2020140959915Open ↗
06/26/2020140918309Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/05/2020140959915Open ↗
06/26/2020140918309Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment75
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSIGN HANGER CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/22/2023122203098Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/22/2023122203098Open ↗
▸Safety & Tenant Protection34
▸DOB NOWTenant Protection Plan22
09/05/2026M00200067-I1Open ↗
09/05/2026M00277054-I1Open ↗
09/03/2026M00250884-P2Open ↗
Showing 3 of 22 on file for this type
▸BISTenant Protection Plan and Notes11
01/31/2020123845045Open ↗
01/16/2020123798444Open ↗
01/06/2020123728591Open ↗
Showing 3 of 11 on file for this type
▸BISSTREET TREE CHECKLIST1
01/31/2020123845045Open ↗
▸Environmental & Asbestos77
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
06/26/2020140918309Open ↗
01/31/2020123845045Open ↗
12/31/2019123816415Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/05/2026M00200067-I1Open ↗
09/05/2026M00282965-I1Open ↗
09/05/2026M00283159-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/05/2026M00277054-I1Open ↗
09/05/2026M00276996-I1Open ↗
09/03/2026M00250884-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
02/05/2020123798444Open ↗
01/16/2020123798444Open ↗
01/06/2020123728591Open ↗
▸Energy Compliance105
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS56
02/05/2020123798444Open ↗
02/05/2020123798444Open ↗
01/31/2020123845045Open ↗
Showing 3 of 56 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
09/22/2020123816415Open ↗
01/10/2020123801243Open ↗
01/08/2020123759815Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)10
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
07/21/2021123728591Open ↗
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISELECTRIC MOTORS3
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
▸BISLIGHTING CONTROLS3
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/05/2020140959915Open ↗
09/22/2020123816415Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/05/2020140959915Open ↗
06/26/2020140918309Open ↗
▸BIS* HVAC INSULATION AND SEALING2
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION2
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00250884-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY8
07/21/2021123728591Open ↗
10/05/2020140959915Open ↗
09/22/2020123816415Open ↗
Showing 3 of 8 on file for this type
▸BIS* EXIT SIGNS2
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
▸BISMECHANICAL SYSTEMS1
05/22/2023122203098Open ↗
▸Approvals, Objections & Sign-offs74
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST34
10/05/2023122203098Open ↗
06/27/2023122203089Open ↗
07/27/2021140918309Open ↗
Showing 3 of 34 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
09/13/2024123845045Open ↗
04/29/2024123845045Open ↗
04/26/2024123845045Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL3
08/21/2023122203098Open ↗
05/15/2023122203089Open ↗
07/21/2021140918309Open ↗
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership94
▸BISCOST AFFIDAVIT76
10/05/2020140959915Open ↗
09/22/2020123816415Open ↗
06/26/2020140918309Open ↗
Showing 3 of 76 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
06/12/2023122203098Open ↗
06/12/2023122203098Open ↗
06/12/2023122203089Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)2
07/21/2021140918309Open ↗
07/21/2021123728591Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
03/12/2025123845045Open ↗
08/02/2024123845045Open ↗
▸Filing & Intake Forms81
▸BISEFILING COVER SHEET40
01/31/2020123845045Open ↗
01/16/2020123798444Open ↗
01/16/2020123798444Open ↗
Showing 3 of 40 on file for this type
▸BISADDITIONAL INFORMATION24
12/02/2020123728591Open ↗
10/05/2020140959915Open ↗
08/20/2020123816415Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM14
01/24/2020123801243Open ↗
01/22/2020123801243Open ↗
01/10/2020123801243Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/05/2020140959915Open ↗
06/26/2020140918309Open ↗
Showing 2 of 3 on file for this type
▸Other Documents17
▸DOB NOWDHCR Document4
09/03/2026M00255650-P3Open ↗
09/03/2026M00255650-P2Open ↗
08/13/2026M00250810-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01060815-I1Open ↗
08/13/2026M00980591-I1Open ↗
08/13/2026M01117596-I1Open ↗
▸DOB NOWCalculations3
08/13/2026M01060815-I1Open ↗
08/13/2026M00980591-I1Open ↗
08/13/2026M01117596-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHUTOFF DAMPERS2
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
▸BISMAINTENANCE INFORMATION2
05/22/2023122203098Open ↗
05/22/2023122203098Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01236249-I1Open ↗