DOB06/04/2026BOROUGH COMMISSIONER ORDER TO STOP WORK IMMEDIATELY DUE TO APPLICANT WITHDRAWAL OF APPLICATION #120296125 WAS ISSUED TO ENSURE THE SAFETY OF LIVES AND PROPERTIES.
DOB05/19/2026FTM BLDG WALL "S" & APPURTS. PARTIAL FACDE COLLPSE OCCURRED W/ ADDIT UNSF REMAININ ELEMNTS IDENTIFED. OWNER TO CMPLETE INSTALLTN OFENGINRS ENCLSURE SYSTEM ON REMAING ELEVT BY 5/29/26. REMDY:PROVDE 2XWEEKLY UP DTES DURING PRORITY 2 PHSE. PROVDE S/S RPRT UPDTES EVERY 2 WEEKS UNTIL ALL OUTSTANDG ITEMS ARE CMPLETE & SIGND OFF.MAINTAN PBLIC PRTCTN MEAS
DOB05/19/2026FTM BLDG WALL "S" & APPURTS. PARTIAL FACADE COLLPSE OCCURREDW/ ADDITN UNSF REMAINING ELEMNTS IDENTIFED. EMERGCY STABILIZTN EFFORTS & PBLIC SFTY MEAS PLACE SINCE INCIDENT IN SEPARATEPRORITY PHSES. REMDY: OWNR IS TO BE BEGIN PERMANET REPAIRS UNDR PERMIT BY 7/6/26. IN THEEVENT HZRDOUS CONDIT FOUND, IMMEDLY NOTIFY THE DEPT. MAINTS PBLIC SFTY MEAS
DOB05/08/2026PRTL COLLAPSE OCCUREDWTH ADD UNSAFE REMAINING ELE INDTFD. EMER SAFETY NETTING INSTALL/PROPOSED BUT NON-COMP WTH ANSI/ASSE A10.11 STANDARDS & SUS TO UV DEGR MAKING INSUFF FOR LONGTERM USE. REMEDY: COMPLY WTH COD E WITHIN 3 MONS OF INSTALL (NO LATER THAN 8/7/26) REPLACE NON-COMP NET AS MAND BY AOR FOR PMM FILING M01395684
DOB05/08/2026PARTIAL FACADE COLLAPRE OCCURIED WITH ADDITIONAL UNSAFE REMAINING ELEM ENTS IDENTIFIED. EMRGNCY SAFETY NETTING HAS BEEN INSTALLED/PROPOSED BUT NON-COMPLIANT WITH A10.11 STNRDS & SUSCEPTIBLE TO UV DEG INSUFF FOR LONG TERM. REMEDY: COMPLY WTH CODE IMMED RETAIN NYS PE TO INSPCT NETTING W/IN 4 WEEKS OF INSTALL EVERY 2 WEEKS AFTER. RPRT DUE 5/29/26
DOB05/05/2026ON 4/27/26 @ APRROX 6:15AM 30 LF OF TERRACOTTA & ASSOCIATD MASONRY. DE TATCHED FROM THE 15&16 FL SPANDERAL @ THE S.ELEV. DMAGE 5FL FACDE BREACH THE NETTING & SIDEWALK SHED & FELL INTO THE PBLIC RGHT OF WAY & STREET CAUSING PRPTY DMAGED & POSING AN IMMED PUBLIC SFTY. REMDY:OWNR SHALL:1.BY 5/11/26 SBMT NAMES&NYPE/RA LIC #S OF 3 INDPNDNT QEWI EXP IN
DOB04/27/2026ATOI OBSERVED A SECTIONED-OFF UNSAFE ZONE ON READE STREET FOLLOWING AN INCIDENT IN WHICH BRICKS FELL FROM THE 15TH FLOOR ONTO THE STREET. AS A RESULT, THE SECONDARY MEANS OF EGRESS FROM 291 BROADWAY IS CURRENTLY BLOCKED.
DOB04/27/2026EMERGENCY WORK. DETERIORATED FACADE AND STEEL HAS LED TO DESTABILIZED PORTIONS FALLING ONTO PUBLIC. SCAFFOLDING DAMAGED. PUBLIC HAZARD REMEDY/REQUIREMENTS: COMPLY WITH CODE. RETAIN RDP,CS,GC TO EVALUATE, SECURE, CLEANUP & STABILIZE SCAFFOLDING, SITE, FACADE. PROVIDE ASSESSMENT, DAILY REPORTS
DOB01/09/2026FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP3 WEST ELEV:MULTIPLE LINTELS ON SE VERAL FLOORS ARE MISSING AND APPEAR TO BE WORKED ON BUT NO ONE IS WORK ING AT THIS TIME.MISSING BRICKS AT UPPER FLOORS.AT THE ROOF BULKHEAD H AS CRACKS IN STUCCO.CRACKS IN PARAPET.REMEDY:REPAIR AND/OR REPLACE
ECB07/03/2024A.C.27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN EXI$6K due
ECB02/28/202327-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE$10K due
DOB02/17/2023CYCLE 9B UNSAFE REPORT FILED
ECB04/16/202127-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE O$10K due
DOB03/11/2021V-DOB VIOLATION - ACTIVE
DOB03/11/2021V-DOB VIOLATION - ACTIVE
DOB03/11/2021V-DOB VIOLATION - ACTIVE
DOB03/06/2020V-DOB VIOLATION - ACTIVE
DOB03/06/2020V-DOB VIOLATION - ACTIVE
DOB09/03/2019FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
DOB04/05/2019VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
DOB04/05/2019VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
DOB03/19/2019V-DOB VIOLATION - ACTIVE
DOB03/18/2019V-DOB VIOLATION - ACTIVE
DOB02/21/2019V-DOB VIOLATION - ACTIVE
DOB07/31/2018FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
DOB03/15/2018V-DOB VIOLATION - ACTIVE
DOB09/15/2017VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
DOB03/06/2017V-DOB VIOLATION - ACTIVE
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB12/01/2016VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB02/24/2016V-DOB VIOLATION - ACTIVE
DOB06/10/2015VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
DOB04/22/2015V-DOB VIOLATION - ACTIVE
DOB02/20/2015V-DOB VIOLATION - ACTIVE
DOB08/30/2013FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
ECB06/15/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTE: DOB VIOLATION NUMBER: 051926FA10101EM, DATED: 05/19/2026, REQUIRED THE OWNER TO INSTALL ENGINEERED SYSTEM AND REMAINING PRIORITY 2 ITEMS ON S/SHearing held — result not yet published$2K proposed
ECB12/17/2021SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE INNothing owed — awaiting certificate of correction
ECB04/21/2020SEC. 27-929.1 AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDGNothing owed — awaiting certificate of correction
ECB12/03/201927-929.1 A.C. 27-929-1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDINNothing owed — awaiting certificate of correction