← Back
Design Firm
YHL ARCHITECT PLLC
Design
MANHATTAN · 2
1 building
5
Total Filings
2
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month2 projects all-time
0112Aug '21 · 1Oct '21 · 1Aug '21Sep '21Oct '21
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
291 BROADWAYMANHATTAN · latest 11/30/2021
2 projects
Key relationships
Everyone →
Filing representatives
YU-HWA LINlatest 04/29/2022
4 filings
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00562171 ↗291 BROADWAY
MANHATTAN
AlterationSigned-off10/19/202111/30/2021INTERIOR CONSTRUCTION OF NON-LOAD BEARING PARTITIONS AND FINISHES FOR CHILDREN'S PRESCHOOL AT CELLAR FLOOR. ALL OTHER REQUIRED WORK TYPES SH…
M00553022 ↗291 BROADWAY
MANHATTAN
AlterationSigned-off08/09/202108/18/2021MINOR INTERIOR DEMOLITION WORK AT CELLAR FLOOR, INCLUDING REMOVAL OF NON-LOAD BEARING PARTITIONS AND FINISHES AS PER DRAWINGS. ALL OTHER REQ…
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
YU-HWA LIN404/29/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
GOOD-WILL MECHANICAL CORP105/02/2022
UNIVERSAL CONSTRUCTION AN108/09/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DISTINCT ENTERPRISES, INC.205/02/2022
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00562171 ↗291 BROADWAY
MANHATTAN
AlterationSigned-off10/19/202111/30/2021INTERIOR CONSTRUCTION OF NON-LOAD BEARING PARTITIONS AND FINISHES FOR CHILDREN'S PRESCHOOL AT CELLAR FLOOR. ALL OTHER REQUIRED WORK TYPES SH…
M00553022 ↗291 BROADWAY
MANHATTAN
AlterationSigned-off08/09/202108/18/2021MINOR INTERIOR DEMOLITION WORK AT CELLAR FLOOR, INCLUDING REMOVAL OF NON-LOAD BEARING PARTITIONS AND FINISHES AS PER DRAWINGS. ALL OTHER REQ…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
291 BROADWAY ↗504/29/2022
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00553022-I1 · 291 BROADWAYRequest digital key ↗
09/02/2026M00562171-P1 · 291 BROADWAYRequest digital key ↗
09/02/2026M00562171-I1 · 291 BROADWAYRequest digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026M00562171-P1 · 291 BROADWAYOpen ↗
09/02/2026M00562171-P1 · 291 BROADWAYOpen ↗
09/02/2026M00562171-P1 · 291 BROADWAYOpen ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026M00553022-I1 · 291 BROADWAYOpen ↗
Showing 1 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026M00562171-P1 · 291 BROADWAYOpen ↗
08/30/2026M00562171-I1 · 291 BROADWAYOpen ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026M00553022-I1 · 291 BROADWAYOpen ↗
Showing 1 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type