← Back
Elevator apt, fireproof without stores
Brevoort (NYCHA)
291 PATCHEN AVENUE · BIN 3325174
💬 Discuss this project
1980Year Built
7Stories
D3Building Class
R5Zoning
875,875 sfGross Floor Area
896Units
LL97 Covered14 Open Violations 1 unresolved · 13 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 747,200 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof6p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3407/08/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYCHA 99103/22/2026
NYC HOUSING AUTHORITY403/21/2026
ZORIA HOUSING803/21/2026
OFFICE OF DESIGN-NYCHA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING403/21/2026
AK CONSULTING SERVICES1003/21/2026
PURCELL EVERETT ARCHITECTS803/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor607/08/2026
KORDUN CONSTRUCTION CORPGeneral Contractor607/08/2026
KORDUN CONSTRUCTION CORPPlumbing207/08/2026
H&F IRON WORKSElectrical203/21/2026
RYBURN PHILLIPSElectrical203/21/2026
FOY, REMERElectrical203/21/2026
HYLAN DATACOM & ELECL LLCElectrical103/22/2026
SKOWRONSKI JEFFElectrical103/21/2026
STANTON, TElectrical103/21/2026
JEFF SKOWRONSKIElectrical103/21/2026
POLARIS ELEC'L CONST CORPElectrical103/22/2026
RIVERA, EDWARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423403/07/2023
BITOPI CONSULTANTS LLC7036101/18/2023
BUREAU VERITAS NA6902204/20/2021
Building Lifecycle
All (90)Filed (14)Permit Issued (14)Signed Off (7)Facade (FISP) (10)Violation (12)Inspection (3)Special Inspection (30)
07/02/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01155504-I1
06/30/2026
Permit issued — Suspended Scaffold
B01155504-I1-SC
04/17/2026
Signed off — Alteration
B00482728-I1
04/16/2026
Signed off — Alteration
HEREBY FILING FOR THE REPLACEMENT OF HOT WATER HEATERS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00472617-I1
01/26/2026
Signed off — Alteration
HEREBY FILING FOR STRUCTURAL WORK - CONCRETE PAD. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00482730-I1
10/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Permit issued — Mechanical Systems
B00482728-I1-MS
04/09/2025
Permit issued — Structural
B00482730-I1-ST
02/04/2025
Permit issued — Suspended Scaffold
B01155504-I1-SC
01/31/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01155504-I1
01/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2025
Permit issued — Plumbing
B00472617-I1-PL
08/28/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/11/2024
Violation issued (ECB, open)
Local Law
04/08/2024
Permit issued — Mechanical Systems
B00482728-I1-MS
04/08/2024
Permit issued — Structural
B00482730-I1-ST
01/09/2024
Permit issued — Structural
B00482730-I1-ST
01/08/2024
Permit issued — Plumbing
B00472617-I1-PL
01/08/2024
Permit issued — Mechanical Systems
B00482728-I1-MS
11/14/2023
Special inspection requirement — Final
IBRAHIM MOURAD
11/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
11/14/2023
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
11/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
11/14/2023
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
11/09/2023
Filed — Alteration
HEREBY FILING FOR STRUCTURAL WORK - CONCRETE PAD. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00482730-P1
09/04/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 1853 FULTON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00814222-I1
09/04/2023
Signed off — Alteration
B08045627-I1
08/31/2023
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 1853 FULTON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08045625-I1
05/15/2023
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 1853 FULTON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08045625-P2
04/25/2023
Violation issued (FDNY_NOV, closed)
04/25/2023
Violation issued (FDNY_NOV, closed)
03/08/2023
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 1853 FULTON STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08045625-P1
03/08/2023
Special inspection requirement — Structural Steel - Welding
Young Suh
03/08/2023
Special inspection requirement — Structural Steel - Details
Young Suh
03/08/2023
Special inspection requirement — Masonry
Young Suh
03/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
03/08/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Young Suh
03/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
03/08/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
03/08/2023
Special inspection requirement — Final
Young Suh
03/08/2023
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
03/08/2023
Special inspection requirement — Structural Cold-Formed Steel
Young Suh
03/08/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Young Suh
03/08/2023
Special inspection requirement — Post-installed Anchors
Young Suh
03/07/2023
Filed — Alteration
BLDG #2 ROOFING REPLACEMENT AND RAILING REMOVAL WITH ASSOCIATED BULKHEAD ALTERATIONS. ALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08053368-P1
02/28/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Young Suh
02/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
02/28/2023
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
02/28/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Young Suh
02/28/2023
Special inspection requirement — Masonry
Young Suh
02/28/2023
Special inspection requirement — Post-installed Anchors
Young Suh
02/28/2023
Special inspection requirement — Structural Cold-Formed Steel
Young Suh
02/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
02/28/2023
Special inspection requirement — Structural Steel - Details
Young Suh
02/28/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
02/28/2023
Special inspection requirement — Structural Steel - Welding
Young Suh
02/28/2023
Special inspection requirement — Final
Young Suh
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2023
Permit issued — General Construction
B08053368-I1-GC
01/19/2023
Permit issued — Supported Scaffold
B00814222-I1-SF
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/30/2026
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/09/2025
DOB NOWStructuralSigned-offKORDUN CONSTRUCTION CORP04/09/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM02/04/2025
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP01/15/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/08/2024
DOB NOWStructuralSigned-offKORDUN CONSTRUCTION CORP04/08/2024
DOB NOWStructuralSigned-offKORDUN CONSTRUCTION CORP01/09/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP01/08/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP01/08/2024
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC02/13/2023
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/19/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/28/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC12/28/2022
BISEQISSUEDVIKRANT CONTRACTING & BUILDER05/16/2014
BISOTISSUEDZORIA HOUSING, LLC12/10/2013
BISEQISSUEDZORIA HOUSING, LLC12/03/2013
BISEQISSUEDVIKRANT CONTRACTING & BUILDER12/03/2013
BISEQISSUEDZORIA HOUSING, LLC12/02/2013
BISEQISSUEDVIKRANT CONTRACTING & BUILDER12/02/2013
BISPLISSUEDD & S PLG07/25/1994
BISOTISSUEDD & S PLG07/25/1994
6 projects · most recent 12/17/2025
General Wiring
FiledStatusContractorScope
12/17/2025Permit IssuedACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
12/16/2024CompletePOLARIS ELEC'L CONST CORP—
12/16/2024CompletePOLARIS ELEC'L CONST CORP—
04/25/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
01/01/2024CompleteHYLAN DATACOM & ELECL LLC—
12/31/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
1 project · most recent 03/07/2023
Steel Concrete Masonry
FiledStatusContractorScope
03/07/2023Signed-offROMA SCAFFOLDING INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/28/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
11/14/2023FinalIBRAHIM MOURADprogress
11/14/2023Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
11/14/2023Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
11/14/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
11/14/2023Sprayed fire-resistant materialsIBRAHIM MOURADspecial
03/08/2023Structural Steel - WeldingYoung Suhspecial
03/08/2023Structural Steel - DetailsYoung Suhspecial
03/08/2023MasonryYoung Suhspecial
03/08/2023Tenant Protection Plan ComplianceYoung Suhspecial
03/08/2023Construction Operations Influencing Adjacent StructuresYoung Suhspecial
03/08/2023Structural Stability – Alterations of existing buildingsYoung Suhspecial
03/08/2023Structural Steel - High Strength BoltingYoung Suhspecial
03/08/2023FinalYoung Suhprogress
03/08/2023Concrete - Cast-In-PlaceYoung Suhspecial
03/08/2023Structural Cold-Formed SteelYoung Suhspecial
03/08/2023Mastic and Intumescent Fire-resistant CoatingsYoung Suhspecial
03/08/2023Post-installed AnchorsYoung Suhspecial
02/28/2023Mastic and Intumescent Fire-resistant CoatingsYoung Suhspecial
02/28/2023Tenant Protection Plan Compliance—special
02/28/2023Concrete - Cast-In-PlaceYoung Suhspecial
02/28/2023Construction Operations Influencing Adjacent StructuresYoung Suhspecial
02/28/2023MasonryYoung Suhspecial
02/28/2023Post-installed AnchorsYoung Suhspecial
02/28/2023Structural Cold-Formed SteelYoung Suhspecial
02/28/2023Structural Stability – Alterations of existing buildingsYoung Suhspecial
Latest 25 of 35.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
09/01/2026B00482728-I1Request digital key ↗
08/28/2026B08053368-P1Request digital key ↗
08/28/2026B08053368-S2Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00472617-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION12
12/27/2023340682773Open ↗
07/10/2020340682773Open ↗
09/01/2019340668325Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION6
07/10/2014340103649Open ↗
12/10/2013340102294Open ↗
12/03/2013340103685Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00482728-I1Open ↗
08/28/2026B08053368-I1Open ↗
08/28/2026B08053368-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B08053368-P1Open ↗
08/26/2026B08053368-S1Open ↗
08/26/2026B08053368-S2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
12/10/2013340102294Open ↗
12/03/2013340103685Open ↗
12/03/2013340103649Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
12/10/2013340102294Open ↗
12/03/2013340103685Open ↗
12/03/2013340103649Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
12/10/2013340102294Open ↗
12/03/2013340103685Open ↗
12/03/2013340103649Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B08053368-P1Open ↗
08/26/2026B08053368-S2Open ↗
08/25/2026B00472617-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION4
01/05/2015340102560Open ↗
01/05/2015340103649Open ↗
01/05/2015340103685Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
08/05/2019340682773Open ↗
05/29/2019340671767Open ↗
05/03/2019340668325Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/05/2019340682773Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
08/05/2019340682773Open ↗
05/29/2019340671767Open ↗
05/03/2019340668325Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00482728-I1Open ↗
08/28/2026B08053368-S2Open ↗
08/28/2026B08053368-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/10/2013340102294Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/06/2022340668325Open ↗
03/31/2020340682773Open ↗
09/13/2019340668325Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING3
12/03/2013340103649Open ↗
12/02/2013340102506Open ↗
12/02/2013340102560Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00482728-I1Open ↗
08/13/2026B00472617-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY11
10/12/2022340671767Open ↗
01/06/2022340668325Open ↗
07/14/2020340682773Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/01/2026B00482728-I1Open ↗
08/28/2026B08045627-I1Open ↗
08/27/2026B08045625-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST4
01/05/2015340102560Open ↗
01/05/2015340103649Open ↗
01/05/2015340103685Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/05/2015340102560Open ↗
01/05/2015340103649Open ↗
01/05/2015340103685Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
04/02/2020340682773Open ↗
05/29/2019340671767Open ↗
05/03/2019340668325Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION14
10/14/2020340671767Open ↗
10/14/2020340671767Open ↗
07/14/2020340682773Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
08/05/2019340682773Open ↗
05/29/2019340671767Open ↗
05/03/2019340668325Open ↗
Showing 3 of 8 on file for this type
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01155504-I1Open ↗