Elevator apt, fireproof without stores
Brevoort (NYCHA)
291 PATCHEN AVENUE · Bedford-Stuyvesant (East) · BIN 3325175
💬 Discuss this project
1980Year Built
7Stories
D3Building Class
R5Zoning
875,875 sfGross Floor Area
896Units
LL97 Covered14 Open Violations 1 unresolved · 13 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 747,200 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA2807/08/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYCHA 99103/22/2026
ZORIA HOUSING303/21/2026
OFFICE OF DESIGN-NYCHA203/21/2026
NYC HOUSING AUTHORITY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WESLER-COHEN ASSOCIATES411/14/2023
AK CONSULTING SERVICES, INC105/09/2022
BITOPI CONSULTANTS LLC205/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING403/21/2026
AK CONSULTING SERVICES603/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor507/08/2026
KORDUN CONSTRUCTION CORPGeneral Contractor407/08/2026
KORDUN CONSTRUCTION CORPPlumbing207/08/2026
RYBURN PHILLIPSElectrical203/21/2026
JEFF SKOWRONSKIElectrical103/21/2026
ACCORD POWER ELECTRIC LLCElectrical103/22/2026
SKOWRONSKI JEFFElectrical103/21/2026
H&F IRON WORKSElectrical103/21/2026
FOY, REMERElectrical103/21/2026
HYLAN DATACOM & ELECL LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA6902311/14/2023
BITOPI CONSULTANTS LLC7036105/04/2022
Building Lifecycle
All (63)Filed (8)Permit Issued (11)Signed Off (7)Facade (FISP) (10)Violation (11)Inspection (5)Special Inspection (11)
07/02/2026
Signed off — Alteration
B01155527-I1
06/30/2026
Permit issued — Suspended Scaffold
B01155527-I1-SC
04/16/2026
Signed off — Alteration
B00472833-I1
01/16/2026
Signed off — Alteration
B00484669-I1
11/14/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/12/2025
Signed off — Alteration
B00484687-I1
10/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2025
Permit issued — Structural
B00484687-I1-ST
04/10/2025
Permit issued — Plumbing
B00472833-I1-PL
04/10/2025
Permit issued — Mechanical Systems
B00484669-I1-MS
02/03/2025
Permit issued — Suspended Scaffold
B01155527-I1-SC
01/30/2025
Filed — Alteration
B01155527-I1
01/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/07/2024
Permit issued — Structural
B00484687-I1-ST
04/11/2024
Violation issued (ECB, open)
Local Law
04/10/2024
Permit issued — Plumbing
B00472833-I1-PL
04/10/2024
Permit issued — Mechanical Systems
B00484669-I1-MS
04/04/2024
Violation issued (FDNY_NOV, closed)
11/21/2023
Special inspection requirement — Final
IBRAHIM MOURAD
11/21/2023
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
11/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
11/21/2023
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
11/14/2023
Filed — Alteration
B00484687-P1
10/20/2023
Special inspection requirement — Final
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Sprayed fire-resistant materials
10/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/20/2023
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
03/17/2023
Signed off — Alteration
B00728564-I1
03/17/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 309 PATCHEN AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00728574-I1
03/17/2023
Signed off — Alteration
B00717376-I1
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/11/2022
Permit issued — Construction Fence
B00728574-I1-FN
05/09/2022
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 309 PATCHEN AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00728574-I1
05/05/2022
Permit issued — Supported Scaffold
B00728564-I1-SF
05/04/2022
Filed — Alteration
B00728564-I1
04/29/2022
Permit issued — Sidewalk Shed
B00717376-I1-SH
04/29/2022
Special inspection requirement — Post-installed Anchors
KAMRUL AHSAN
04/28/2022
Filed — Alteration
B00717376-I1
06/08/2021
Filed — Alteration
B00472833-I1
06/08/2021
Filed — Alteration
B00484669-I1
06/08/2021
Filed — Alteration
B00484687-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/06/2018
Cycle 8 facade report submitted
05/17/2018
Cycle 8 facade inspection completed
05/14/2018
Cycle 8 facade report signed — SWARMP
05/30/2014
Cycle 7 facade report submitted
08/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/13/2013
Cycle 7 facade report submitted
06/13/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2013
Cycle 7 facade report signed — UNSAFE
05/30/2013
Cycle 7 facade inspection completed
12/17/2008
Violation issued (ECB, closed)
Elevators
11/13/2008
Cycle 6 facade report submitted
10/31/2008
Cycle 6 facade report signed — SWARMP
11/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/30/2026
DOB NOWStructuralSigned-offKORDUN CONSTRUCTION CORP05/06/2025
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP04/10/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/10/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM02/03/2025
DOB NOWStructuralSigned-offKORDUN CONSTRUCTION CORP05/07/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP04/10/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/10/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/11/2022
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC05/05/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC04/29/2022
BISOTISSUEDROMA SCAFFOLDING INC02/21/2023
BISOTISSUEDROMA SCAFFOLDING INC08/18/2022
BISOTISSUEDROMA SCAFFOLDING INC07/19/2022
BISEQISSUEDVIKRANT CONTRACTING & BUILDER05/16/2014
BISEQISSUEDZORIA HOUSING, LLC03/20/2014
BISOTISSUEDZORIA HOUSING, LLC03/12/2014
BISEQISSUEDVIKRANT CONTRACTING & BUILDER02/18/2014
7 projects · most recent 12/17/2025
General Wiring
FiledStatusContractorScope
12/17/2025Permit IssuedACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
01/27/2025CompletePOLARIS ELEC'L CONST CORP—
01/27/2025CompletePOLARIS ELEC'L CONST CORP—
04/25/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
06/26/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
08/25/2022Permit IssuedHYLAN DATACOM & ELECL LLC—
06/18/2022Permit IssuedHYLAN DATACOM & ELECL LLC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/14/2025Pass-Final PL - UndergroundPassView ↗
10/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/21/2023FinalIBRAHIM MOURADprogress
11/21/2023Sprayed fire-resistant materialsIBRAHIM MOURADspecial
11/21/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
11/21/2023Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
11/21/2023Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
10/20/2023FinalIBRAHIM MOURADprogress
10/20/2023Sprayed fire-resistant materials—special
10/20/2023Structural Stability – Alterations of existing buildings—special
10/20/2023Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
10/20/2023Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
04/29/2022Post-installed AnchorsKAMRUL AHSANspecial
▾Documents — 163 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
09/01/2026B00484669-I1Request digital key ↗
08/29/2026B00717376-I1Request digital key ↗
08/29/2026B00728564-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00472833-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
12/28/2023340682862Open ↗
08/12/2022340668405Open ↗
09/10/2019340668405Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
08/18/2022340668405Open ↗
07/19/2022340671696Open ↗
03/20/2014340128597Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)2
07/15/2022340668405Open ↗
07/15/2022340671696Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)2
08/10/2022340668405Open ↗
07/19/2022340671696Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/10/2016340118438Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00472833-I1Open ↗
08/29/2026B00717376-I1Open ↗
08/29/2026B00728564-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00484687-P1Open ↗
08/28/2026B00484687-I1Open ↗
08/28/2026B00484687-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/20/2014340128597Open ↗
03/12/2014340118438Open ↗
02/14/2014340119507Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/22/2015340118438Open ↗
01/08/2015340119507Open ↗
01/08/2015340128597Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/20/2014340128597Open ↗
03/12/2014340118438Open ↗
02/14/2014340119507Open ↗
▸BISAPPLICANT OWNER SIGNATURE3
08/08/2019340682862Open ↗
05/29/2019340671696Open ↗
05/01/2019340668405Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/20/2014340128597Open ↗
03/12/2014340118438Open ↗
02/14/2014340119507Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00484687-P1Open ↗
08/28/2026B00484687-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/08/2019340682862Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
08/08/2019340682862Open ↗
05/29/2019340671696Open ↗
05/01/2019340668405Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
07/15/2022340668405Open ↗
07/15/2022340671696Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00472833-I1Open ↗
08/26/2026B00484687-I1Open ↗
08/13/2026B00484669-I1Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)2
07/15/2022340668405Open ↗
07/15/2022340671696Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1166BK222
06/24/2024340671696Open ↗
04/15/2024340668405Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/12/2014340118438Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
01/06/2022340668405Open ↗
05/27/2020340668405Open ↗
08/08/2019340682862Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/28/2023340671696Open ↗
12/28/2023340668405Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00472833-I1Open ↗
08/13/2026B00484669-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/14/2014340119507Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/28/2023340668405Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/12/2014340118438Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/28/2023340668405Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY11
07/19/2022340671696Open ↗
07/15/2022340671696Open ↗
01/06/2022340668405Open ↗
Showing 3 of 11 on file for this type
▸BISMASONRY1
12/28/2023340671696Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/28/2023340671696Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/28/2023340671696Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/28/2023340671696Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/15/2022340671696Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/28/2023340671696Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/15/2022340671696Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
12/28/2023340671696Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
12/28/2023340671696Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/28/2023340671696Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/28/2023340668405Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
08/26/2024340671696Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/01/2026B00472833-I1Open ↗
08/29/2026B00717376-I1Open ↗
08/29/2026B00728564-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/16/2024340671696Open ↗
02/18/2016340118438Open ↗
04/22/2015340118438Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/22/2015340118438Open ↗
01/08/2015340119507Open ↗
01/08/2015340128597Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/29/2026B00728564-I1Open ↗
08/13/2026B00717376-I1Open ↗
08/13/2026B00728574-I1Open ↗
▸BISFINAL2
12/28/2023340671696Open ↗
12/28/2023340668405Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT8
06/28/2024340671696Open ↗
06/18/2020340682862Open ↗
09/10/2019340668405Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/21/2024340671696Open ↗
04/14/2024340668405Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION17
08/15/2022340668405Open ↗
12/15/2020340671696Open ↗
12/15/2020340671696Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/08/2019340682862Open ↗
05/29/2019340671696Open ↗
05/01/2019340668405Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸BISSTRUCTURAL COLD-FORMED STEEL1
12/28/2023340671696Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01155527-I1Open ↗