← Back
Elevator apt, semi-fireproof with stores
1515 SURF AVENUE
BROOKLYN · BIN 3255289
💬 Discuss this project
2022Year Built
26Stories
D7Building Class
R7XZoning
276,483 sfGross Floor Area
327Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: SIRENA REALTY CORP. · 66,256 sf lot · 4.17 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Roof11p · 7 filings · 20 docs
Bulkhead5p · 4 filings · 20 docs
Floor 265p · 3 filings · 20 docs
Floor 254p · 3 filings · 20 docs
Floor 246p · 3 filings · 20 docs
Floor 233p · 2 filings · 20 docs
Floor 222p · 2 filings · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 202p · 2 filings · 20 docs
Floor 192p · 2 filings · 20 docs
Floor 182p · 2 filings · 20 docs
Floor 172p · 2 filings · 20 docs
Floor 162p · 2 filings · 20 docs
Floor 152p · 2 filings · 20 docs
Floor 142p · 2 filings · 20 docs
Floor 131p · 1 filing · 16 docs
Floor 121p · 1 filing · 16 docs
Floor 111p · 1 filing · 16 docs
Floor 101p · 1 filing · 16 docs
Floor 95p · 3 filings · 20 docs
Floor 86p · 3 filings · 20 docs
Floor 710p · 5 filings · 20 docs
Floor 69p · 4 filings · 20 docs
Floor 59p · 5 filings · 20 docs
Floor 410p · 5 filings · 20 docs
Floor 311p · 5 filings · 20 docs
Floor 217p · 7 filings · 20 docs
Floor 132p · 9 filings · 20 docs
Mezzanine1p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIK XS SERVICES2107/08/2026
PLATINUM SERVICES NY3307/08/2026
SIRENA REALTY303/22/2026
DA LUIGI RLTY CORP103/22/2026
LRC CONSTUCTION LLC4003/22/2026
ASF CONSTRUCTION EXCAVA203/22/2026
CONSTRUCTION LLC LRC103/22/2026
JASA NYC GROUP103/22/2026
AMF103/21/2026
SKYLITE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JME BUILDING CONSULTING, LLC403/21/2026
WILLIAM VITACCO ASSOCIATES1703/21/2026
KD DESIGNS303/21/2026
RIGGING CONSULTANTS203/21/2026
JAM CONSULTANTS, INC.1203/21/2026
JP EXPEDITE803/21/2026
DOMANI CONSULTING103/21/2026
GREEN STUDIO203/21/2026
HOWARD I SHAPIRO ASSOCIATES1003/21/2026
DIMO DESIGN303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LRC CONSTRUCTION LLCGeneral Contractor2807/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor2707/08/2026
VIK XS SERVICES INCGeneral Contractor1207/08/2026
TT MECHANICAL CORPPlumbing1007/08/2026
JASA NYC GROUP INCGeneral Contractor707/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing506/28/2026
TTM GROUP CORPFire Protection507/08/2026
LRC MAINTANENCE LLCGeneral Contractor303/21/2026
SIGNS CADScaffold307/08/2026
ASF CONSTRUCTION & EXCAVAGeneral Contractor203/21/2026
CARA PLUMBING GROUP INCPlumbing207/08/2026
ILLUMINOUS ELECTRIC CORP 002640General Contractor103/22/2026
GALAXY ELECTRIC CORPElectrical103/22/2026
MELVYN ZWEBNERElectrical103/21/2026
PAUL CILLIKElectrical103/21/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
DHS FRACO LLCGeneral Contractor107/08/2026
GALEANO ALEJANDROGeneral Contractor103/21/2026
CLIFTON WALDRONElectrical103/21/2026
SIGNS CADGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC69422402/05/2025
CITY-WIDE TESTING INC416111/12/2024
PCS ENGINEERING3745104/03/2024
MCNAMARA/SALVIA OF NEW YO4970203/08/2024
TOHFAZ UDDIN P.E.2001109/01/2022
JZN ENGINEERING, PC.363107/09/2021
Building Lifecycle
All (300)Filed (43)Permit Issued (59)Signed Off (28)Violation (60)Inspection (25)Objection (55)Special Inspection (30)
04/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2026
Violation issued (ECB, closed)
Elevators
02/18/2026
Signed off — Alteration
Plumbing work in conjunction with NB#321599141
B00441613-I1
02/05/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00685092-I1
01/20/2026
Signed off — Alteration
interior fitout for Market. no change to use, egress nor occupancy
B01140473-I1
12/11/2025
Signed off — Alteration
B01164100-I1
12/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2025
Special inspection requirement — Interior lighting power
ELIAS RASABI
11/25/2025
Special inspection requirement — Lighting controls
ELIAS RASABI
11/25/2025
Special inspection requirement — Final
ELIAS RASABI
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
11/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
11/19/2025
Permit issued — Mechanical Systems
B01164100-I1-MS
11/12/2025
Filed — Alteration
interior fitout for Market. no change to use, egress nor occupancy
B01140473-P3
11/11/2025
Special inspection requirement — Lighting controls
ELIAS RASABI
11/11/2025
Special inspection requirement — Interior lighting power
ELIAS RASABI
11/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/11/2025
Special inspection requirement — Energy Code Compliance Inspections
11/11/2025
Special inspection requirement — Final
ELIAS RASABI
09/23/2025
Signed off — Alteration
B00458042-I1
06/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/16/2025
Filed — Alteration
Proposing to install new commercial plumbing fixtures on first floor commercial space as per plans filed no change in use egress or occupancy
B01164098-P1
06/10/2025
Signed off — Alteration
Structural work in conjunction with NB#321599141
B00455577-I1
06/03/2025
Permit issued — Plumbing
B01164098-I1-PL
05/16/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/14/2025
Filed — Alteration
interior fitout for Market. no change to use, egress nor occupancy
B01140473-P2
05/14/2025
Special inspection requirement — Lighting controls
ELIAS RASABI
05/14/2025
Special inspection requirement — Interior lighting power
ELIAS RASABI
05/14/2025
Special inspection requirement — Final
ELIAS RASABI
05/06/2025
Signed off — Alteration
B01018172-I1
05/06/2025
Permit issued — Plumbing
B01164098-I1-PL
04/16/2025
Signed off — Alteration
Installation of new sprinkler/standpipe system in conjunction with NB#321599141
B00441625-I1
04/15/2025
Signed off — Alteration
Installation of temporary standpipe during construction. In conjunction with NB # 321599141
B00455578-I1
03/18/2025
Permit issued — General Construction
B01140473-I1-GC
02/25/2025
Signed off — Alteration
MINOR PLUMBING AND SPRINKLER SCOPE ASSOCIATED WITH BATHROOM BUILD OUT.
B01035014-S2
02/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/05/2025
Filed — Alteration
B01164100-I1
02/05/2025
Filed — Alteration
Proposing to install new commercial plumbing fixtures on first floor commercial space as per plans filed no change in use egress or occupancy
B01164098-I1
02/03/2025
Signed off — Alteration
Mechanical work in conjunction with NB#321599141
B00441692-I1
02/03/2025
Special inspection requirement — Maintenance information
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
AILANTO DANIEL MINAWI
01/30/2025
Objection resolved — Addressed
01/29/2025
Objection raised — Other
01/22/2025
Filed — Alteration
interior fitout for Market. no change to use, egress nor occupancy
B01140473-P1
01/22/2025
Special inspection requirement — Interior lighting power
01/22/2025
Special inspection requirement — Lighting controls
01/22/2025
Special inspection requirement — Final
01/10/2025
Signed off — Alteration
USE OF KCP 24-1 or KCP KB-M36R Placing Boom AT 2940 West 15th Street DURING MAJOR ALTERATION, FILED SEPARATELY UNDER 321599141
B00732475-I1
01/09/2025
Signed off — Alteration
B00489965-I1
01/08/2025
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
01/08/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJASA NYC GROUP INC11/19/2025
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP06/03/2025
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY05/06/2025
DOB NOWGeneral ConstructionSigned-offJASA NYC GROUP INC03/18/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC12/04/2024
DOB NOWGeneral ConstructionSigned-offJASA NYC GROUP INC11/27/2024
DOB NOWSprinklersSigned-offPRIME PLMBG & HTG OF NY09/10/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/29/2024
DOB NOWGeneral ConstructionSigned-offJASA NYC GROUP INC08/26/2024
DOB NOWMechanical SystemsSigned-offJASA NYC GROUP INC08/26/2024
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC07/22/2024
DOB NOWSignSigned-offSIGNS CAD CORP05/30/2024
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC04/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC04/19/2024
DOB NOWSuspended ScaffoldPermit IssuedEASI CAULKING INC04/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC04/18/2024
DOB NOWPlumbingSigned-offTT MECHANICAL CORP04/12/2024
DOB NOWGeneral ConstructionSigned-offLRC CONSTRUCTION LLC04/01/2024
DOB NOWCurb CutSigned-offLRC CONSTRUCTION LLC02/27/2024
DOB NOWGeneral ConstructionSigned-offLRC CONSTRUCTION LLC02/14/2024
DOB NOWSignSigned-offSIGNS CAD CORP01/31/2024
DOB NOWSignSigned-offSIGNS CAD CORP01/30/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC01/26/2024
DOB NOWSprinklersSigned-offTTM GROUP CORP01/18/2024
DOB NOWSprinklersSigned-offTT MECHANICAL CORP11/22/2023
DOB NOWStandpipeSigned-offTT MECHANICAL CORP11/16/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/17/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/17/2023
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC08/08/2023
DOB NOWStructuralSigned-offLRC CONSTRUCTION LLC07/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC04/18/2023
DOB NOWMechanical SystemsSigned-offLRC CONSTRUCTION LLC04/18/2023
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC04/18/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/13/2023
DOB NOWStandpipeSigned-offTTM GROUP CORP02/03/2023
DOB NOWPlumbingSigned-offTT MECHANICAL CORP01/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC01/06/2023
DOB NOWStandpipeSigned-offTTM GROUP CORP01/05/2023
DOB NOWSprinklersSigned-offTT MECHANICAL CORP12/09/2022
DOB NOWStandpipeSigned-offTT MECHANICAL CORP11/30/2022
+ 37 more permits on file
1 project · most recent 06/16/2025
Water/Sanitary
FiledStatusContractorScope
06/16/2025Permit IssuedA&H EXPRESS PLBG&HTG CORPWater/Sanitary
13 projects · most recent 10/24/2025
General Wiring
FiledStatusContractorScope
10/24/2025CompleteILLUMINOUS ELECTRIC CORP.—
09/15/2025Permit IssuedTITANIUM ELECTRICAL CORP2 meters, 2 new_meters
09/02/2025Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
02/24/2025CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
06/14/2024CompleteSIGNS CAD CORP—
03/25/2024CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
03/06/2023CompleteTOP SHELF ELECTRIC CORPGeneral Wiring
02/13/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
10/05/2022Permit IssuedTOP SHELF ELECTRIC CORP1 meters, 1 new_meters
09/23/2022Permit IssuedNEWBRIDGE ELECTL CONTNG—
02/22/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
01/28/2022Permit IssuedTOP SHELF ELECTRIC CORPGeneral Wiring
01/28/2022CancelledTOP SHELF ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/03/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/19/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
02/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/20/2023Pass-Final SD - Fire PumpPassView ↗
10/16/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/18/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/18/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/31/2022Pass-Final PL - UndergroundPassView ↗
05/06/2022Pass-Final PL - UndergroundPassView ↗
04/27/2022Pass-Final PL - UndergroundPassView ↗
03/09/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 139
DateRequirementInspectorRole
11/25/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
11/25/2025Fire-Resistance Rated ConstructionELIAS RASABIprogress
11/25/2025FinalELIAS RASABIprogress
11/25/2025Energy Code Compliance InspectionsELIAS RASABIprogress
11/25/2025Interior lighting powerELIAS RASABIenergy_progress
11/25/2025Lighting controlsELIAS RASABIenergy_progress
11/11/2025Fire-Resistance Rated Construction—progress
11/11/2025Lighting controlsELIAS RASABIenergy_progress
11/11/2025Interior lighting powerELIAS RASABIenergy_progress
11/11/2025Fire-Resistant Penetrations and Joints—special
11/11/2025FinalELIAS RASABIprogress
11/11/2025Energy Code Compliance Inspections—progress
05/14/2025FinalELIAS RASABIprogress
05/14/2025Interior lighting powerELIAS RASABIenergy_progress
05/14/2025Lighting controlsELIAS RASABIenergy_progress
02/03/2025HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
02/03/2025HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
02/03/2025Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
02/03/2025HVAC-R and service water heating equipmentAILANTO DANIEL MINAWIenergy_progress
02/03/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
02/03/2025Lighting controlsAILANTO DANIEL MINAWIenergy_progress
02/03/2025Maintenance informationAILANTO DANIEL MINAWIenergy_progress
01/22/2025Lighting controls—energy_progress
01/22/2025Final—progress
01/22/2025Interior lighting power—energy_progress
Latest 25 of 139.
▾Documents — 617 on file (BIS + DOB NOW)
▸Plans & Drawings57
▸DOB NOWPlans/Sketch42
09/01/2026B00489965-I1Request digital key ↗
09/01/2026B00547153-I1Request digital key ↗
09/01/2026B00555763-I1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/01/2026B00441625-I1Request digital key ↗
09/01/2026B00455578-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00441613-I1Request digital key ↗
09/01/2026B00441613-P2Request digital key ↗
09/01/2026B00441613-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/01/2026B00441692-P2Request digital key ↗
09/01/2026B00441692-P1Request digital key ↗
09/01/2026B00441692-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/01/2026B00441625-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/01/2026B00455577-P1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
09/01/2026B00458042-I1Request digital key ↗
▸Applications & Permits92
▸BISPLAN / WORK APPROVAL APPLICATION50
01/29/2026321599141Open ↗
01/28/2026321599141Open ↗
01/27/2026321599141Open ↗
Showing 3 of 50 on file for this type
▸BISWORK PERMIT APPLICATION38
11/13/2024321599141Open ↗
11/13/2024321599141Open ↗
09/25/2024321599141Open ↗
Showing 3 of 38 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
06/12/2023340802581Open ↗
Showing 1 of 2 on file for this type
▸BISDEP STORMWATER CONSTRUCTION PERMIT - 20K SQFT1
08/14/2023321599141Open ↗
▸BISDEP STORMWATER CONSTRUCTION PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
01/15/2025321599141Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFLOOD ZONE COMPLIANCE1
03/21/2024321599141Open ↗
▸BISVERIFY TAX LOT1
01/30/2026321599141Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
12/08/2021321599141Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications189
▸DOB NOWProgress Inspector Seal & Signature74
09/01/2026B01035014-P1Open ↗
09/01/2026B01140473-P2Open ↗
09/01/2026B01140473-P2Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature54
09/01/2026B00441613-P1Open ↗
09/01/2026B00441613-P2Open ↗
09/01/2026B00441613-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature46
09/01/2026B01035014-P1Open ↗
08/29/2026B00455577-I1Open ↗
08/29/2026B00455577-I1Open ↗
Showing 3 of 46 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment5
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
01/30/2025321599141Open ↗
08/14/2023321599141Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
01/30/2025321599141Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/26/2024321599141Open ↗
▸DOB NOWFDNY Fire Suppression1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos42
▸DOB NOWOER: Notice to Proceed24
09/01/2026B00441692-P1Open ↗
09/01/2026B00441692-I1Open ↗
Showing 2 of 24 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
09/01/2026B00441692-I1Open ↗
Showing 1 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/23/2024321599141Open ↗
▸BISOER LETTER OF NNO_PHASE21
07/17/2024321599141Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
03/18/2022321599141Open ↗
03/18/2022321599141Open ↗
Showing 2 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISENERGY COST BUDGET WORKSHEET2
04/25/2024321599141Open ↗
03/29/2022321599141Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00441692-I1Open ↗
Showing 1 of 2 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/12/2024321599141Open ↗
▸BISFENESTRATION AREAS1
07/12/2024321599141Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/12/2024321599141Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/26/2024321599141Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/26/2024321599141Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/03/2026321599141Open ↗
▸BISELECTRIC MOTORS1
03/21/2024321599141Open ↗
▸BISLIGHTING CONTROLS1
06/26/2024321599141Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY21
11/13/2023321599141Open ↗
11/07/2023321599141Open ↗
11/07/2023321599141Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/09/2026321599141Open ↗
Showing 1 of 2 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/12/2024321599141Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
12/22/2023321599141Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs42
▸BISSCHEDULE A - OCCUPANCY / USE30
01/29/2026321599141Open ↗
01/28/2026321599141Open ↗
01/27/2026321599141Open ↗
Showing 3 of 30 on file for this type
▸BISSUPERSEDING LETTER8
01/10/2024321599141Open ↗
01/10/2024321599141Open ↗
10/18/2022321599141Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
07/10/2023321599141Open ↗
07/10/2023321599141Open ↗
07/10/2023321599141Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership12
▸BISPROJECT-SPECIFIC GL INSURANCE5
09/25/2024321599141Open ↗
08/23/2024321599141Open ↗
03/14/2022321599141Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE4
08/23/2024321599141Open ↗
10/15/2021321599141Open ↗
Showing 2 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
08/23/2024321599141Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms54
▸BISADDITIONAL INFORMATION27
01/07/2026321599141Open ↗
11/14/2025321599141Open ↗
01/15/2025321599141Open ↗
Showing 3 of 27 on file for this type
▸BISBOROUGH INTAKE FORM23
11/13/2024321599141Open ↗
11/13/2024321599141Open ↗
08/23/2024321599141Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/25/2024321599141Open ↗
04/25/2024321599141Open ↗
04/25/2024321599141Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/12/2024321599141Open ↗
▸BISVESTIBULES1
06/26/2024321599141Open ↗
▸BISBPP: FILING REQUIRED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/21/2024321599141Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type