← Back
BuildNYC
Elevator apt, semi-fireproof with stores
2940 WEST 15TH STREET
BROOKLYN · BIN 3255289
💬 Discuss this project
2022Year Built
26Stories
D7Building Class
R7XZoning
276,483 sfGross Floor Area
327Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: Sirena Realty · 66,256 sf lot · 4.17 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsSurf Avenue L/cal LLC7 filings
RoofSidewalk shed, plywood fence, and roof protection3p · 4 filings · 10 docs
BulkheadOutrigger beam configuration1p · 1 filing · 3 docs
Floor 26Surf Avenue L/cal LLC1 filing · 2 docs
Floor 25Surf Avenue L/cal LLC1 filing · 2 docs
Floor 24Surf Avenue L/cal LLC1 filing · 2 docs
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Surf Avenue L/cal LLC2p · 1 filing
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Surf Avenue L/cal LLC2p · 1 filing
Floor 1Milk and Honey15p · 8 filings · 20 docs
MezzanineMilk and Honey1p · 2 filings · 20 docs
CellarSurf Avenue L/cal LLC2 filings
Site & exteriorSurf Avenue L/cal LLC7 filings · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Surf Avenue L/Cal15807/08/2026
Sirena Realty203/22/2026
AMF103/21/2026
Skylite103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edifice Drafting and Services411/12/2025
Adl Engineering306/16/2025
Arketekcher211/27/2024
MG Engineering1411/26/2024
Zenith Home Inspections406/26/2024
Ashraf704/18/2024
Studio V Architecture103/27/2024
McNamara Salvia203/08/2024
Gga Studios102/06/2024
Ospino Engineering412/14/2022
Howard I Shapiro & Associates511/09/2022
Tohfaz Uddin PE109/01/2022
Bronzino Engineering207/09/2022
Michael Schultz107/23/2021
CDM Smith NY107/13/2021
JZN Engineering107/09/2021
Philip Habib & Associates102/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Evangelista403/21/2026
William Vitacco Associates1703/21/2026
KD Designs303/21/2026
Rigging Consultants203/21/2026
J.A.M. Associates1203/21/2026
JP Expedite803/21/2026
Domani Consulting103/21/2026
Green Studio203/21/2026
Howard I Shapiro Associates1003/21/2026
Dimo Design303/21/2026
Yona Love Consulting Services803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LRC ConstructionGeneral Contractor2807/08/2026
Platinum Services NYScaffold2707/08/2026
Vik XS ServicesScaffold1207/08/2026
TT MechanicalPlumbing1007/08/2026
Jasa NYC GroupGeneral Contractor707/08/2026
A&H Express Plumbing & HeatingPlumbing506/28/2026
TTM GroupFire Protection507/08/2026
Signs CadSign hanger307/08/2026
LRC MaintanenceGeneral Contractor303/21/2026
Cara Plumbing GroupPlumbing207/08/2026
Asf Construction & ExcavaScaffold203/21/2026
Arsenal ScaffoldScaffold107/08/2026
Galaxy ElectricElectrical103/22/2026
Illuminous ElectricElectrical103/21/2026
Prudent ElectricElectrical103/21/2026
Galeano AlejandroGeneral Contractor103/21/2026
Illuminous ElectricGeneral Contractor103/22/2026
Signs CadGeneral Contractor103/21/2026
Walliccan Electrical ContractingElectrical103/21/2026
DHS FracoScaffold107/08/2026
Arco Plumbing and HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fenagh69422402/05/2025
City-Wide Testing416111/12/2024
PCS Engineering3745104/03/2024
McNamara/Salvia of New YO4970203/08/2024
Tohfaz Uddin P.E2001109/01/2022
JZN Engineering363107/09/2021
Building Lifecycle
All (300)Filed (43)Permit Issued (60)Signed Off (28)Violation (60)Inspection (23)Objection (56)Special Inspection (30)
02/24/2026
Violation issued (ECB, closed)
Elevators
02/18/2026
Signed off — Alteration
Plumbing work in conjunction with NB#321599141
B00441613-I1
02/05/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00685092-I1
01/20/2026
Signed off — Alteration
interior fitout for Market. no change to use, egress nor occupancy
B01140473-I1
12/11/2025
Signed off — Alteration
B01164100-I1
12/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2025
Special inspection requirement — Interior lighting power
ELIAS RASABI
11/25/2025
Special inspection requirement — Lighting controls
ELIAS RASABI
11/25/2025
Special inspection requirement — Final
ELIAS RASABI
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
11/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
11/19/2025
Permit issued — Mechanical Systems
B01164100-I1-MS
11/12/2025
Filed — Alteration
interior fitout for Market. no change to use, egress nor occupancy
B01140473-P3
11/11/2025
Special inspection requirement — Lighting controls
ELIAS RASABI
11/11/2025
Special inspection requirement — Interior lighting power
ELIAS RASABI
11/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/11/2025
Special inspection requirement — Energy Code Compliance Inspections
11/11/2025
Special inspection requirement — Final
ELIAS RASABI
09/23/2025
Signed off — Alteration
B00458042-I1
06/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/16/2025
Filed — Alteration
Proposing to install new commercial plumbing fixtures on first floor commercial space as per plans filed no change in use egress or occupancy
B01164098-P1
06/10/2025
Signed off — Alteration
Structural work in conjunction with NB#321599141
B00455577-I1
06/03/2025
Permit issued — Plumbing
B01164098-I1-PL
05/16/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/14/2025
Filed — Alteration
interior fitout for Market. no change to use, egress nor occupancy
B01140473-P2
05/14/2025
Special inspection requirement — Lighting controls
ELIAS RASABI
05/14/2025
Special inspection requirement — Interior lighting power
ELIAS RASABI
05/14/2025
Special inspection requirement — Final
ELIAS RASABI
05/06/2025
Signed off — Alteration
B01018172-I1
05/06/2025
Permit issued — Plumbing
B01164098-I1-PL
04/16/2025
Signed off — Alteration
Installation of new sprinkler/standpipe system in conjunction with NB#321599141
B00441625-I1
04/15/2025
Signed off — Alteration
Installation of temporary standpipe during construction. In conjunction with NB # 321599141
B00455578-I1
03/18/2025
Permit issued — General Construction
B01140473-I1-GC
02/25/2025
Signed off — Alteration
MINOR PLUMBING AND SPRINKLER SCOPE ASSOCIATED WITH BATHROOM BUILD OUT.
B01035014-S2
02/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/05/2025
Filed — Alteration
B01164100-I1
02/05/2025
Filed — Alteration
Proposing to install new commercial plumbing fixtures on first floor commercial space as per plans filed no change in use egress or occupancy
B01164098-I1
02/03/2025
Signed off — Alteration
Mechanical work in conjunction with NB#321599141
B00441692-I1
02/03/2025
Special inspection requirement — Maintenance information
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
02/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
AILANTO DANIEL MINAWI
01/30/2025
Objection resolved — Addressed
01/29/2025
Objection raised — Other
01/22/2025
Filed — Alteration
interior fitout for Market. no change to use, egress nor occupancy
B01140473-P1
01/22/2025
Special inspection requirement — Interior lighting power
01/22/2025
Special inspection requirement — Lighting controls
01/22/2025
Special inspection requirement — Final
01/10/2025
Signed off — Alteration
USE OF KCP 24-1 or KCP KB-M36R Placing Boom AT 2940 West 15th Street DURING MAJOR ALTERATION, FILED SEPARATELY UNDER 321599141
B00732475-I1
01/09/2025
Signed off — Alteration
B00489965-I1
01/08/2025
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
01/08/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
12/13/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/12/2024
Signed off — Alteration
MINOR PLUMBING AND SPRINKLER SCOPE ASSOCIATED WITH BATHROOM BUILD OUT.
B01035014-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJasa NYC Group11/19/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating06/03/2025
DOB NOWPlumbingPermit IssuedPrime Plumbing & Heating of NY05/06/2025
DOB NOWGeneral ConstructionSigned-offJasa NYC Group03/18/2025
DOB NOWSprinklersSigned-offArco Plumbing and Heating12/04/2024
DOB NOWGeneral ConstructionSigned-offJasa NYC Group11/27/2024
DOB NOWPlumbingSigned-offPrime Plumbing & Heating of NY09/10/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY08/29/2024
DOB NOWMechanical SystemsSigned-offJasa NYC Group08/26/2024
DOB NOWGeneral ConstructionSigned-offJasa NYC Group08/26/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/22/2024
DOB NOWSignSigned-offSigns Cad05/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services04/19/2024
DOB NOWSuspended ScaffoldPermit IssuedEasi Caulking04/19/2024
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold04/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services04/18/2024
DOB NOWPlumbingSigned-offTT Mechanical04/12/2024
DOB NOWGeneral ConstructionSigned-offLRC Construction04/01/2024
DOB NOWCurb CutSigned-offLRC Construction02/27/2024
DOB NOWGeneral ConstructionSigned-offLRC Construction02/14/2024
DOB NOWSignSigned-offSigns Cad01/31/2024
DOB NOWSignSigned-offSigns Cad01/30/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY01/26/2024
DOB NOWSprinklersSigned-offTTM Group01/18/2024
DOB NOWStandpipeSigned-offTT Mechanical11/22/2023
DOB NOWStandpipeSigned-offTT Mechanical11/16/2023
DOB NOWConstruction FenceSigned-offPlatinum Services NY08/17/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY08/17/2023
DOB NOWConstruction FenceSigned-offPlatinum Services NY08/08/2023
DOB NOWStructuralSigned-offLRC Construction07/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services04/18/2023
DOB NOWMechanical SystemsSigned-offLRC Construction04/18/2023
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services04/18/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/13/2023
DOB NOWSprinklersSigned-offTTM Group02/03/2023
DOB NOWPlumbingSigned-offTT Mechanical01/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services01/06/2023
DOB NOWSprinklersSigned-offTTM Group01/05/2023
DOB NOWStandpipeSigned-offTT Mechanical12/09/2022
DOB NOWStandpipeSigned-offTT Mechanical11/30/2022
+ 37 more permits on file
1 project · most recent 06/16/2025
Water/Sanitary
FiledStatusContractorScope
06/16/2025Permit IssuedA&H Express Plumbing & HeatingWater/Sanitary
13 projects · most recent 10/24/2025
General Wiring
FiledStatusContractorScope
10/24/2025CompleteIlluminous Electric—
09/15/2025Permit IssuedTitanium Electrical2 meters, 2 new_meters
09/02/2025Permit IssuedGalaxy ElectricGeneral Wiring
02/24/2025CompleteOptimal ElectricGeneral Wiring
06/14/2024CompleteSigns Cad—
03/25/2024CompleteOptimal ElectricGeneral Wiring
03/06/2023CompleteTop Shelf ElectricGeneral Wiring
02/13/2023CompleteIlluminous ElectricGeneral Wiring
10/05/2022Permit IssuedTop Shelf Electric1 meters, 1 new_meters
09/23/2022Permit IssuedNewbridge Electl Contng—
02/22/2022CompleteIlluminous ElectricGeneral Wiring
01/28/2022CancelledTop Shelf ElectricGeneral Wiring
01/28/2022Permit IssuedTop Shelf ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
12/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/03/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/19/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
02/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/20/2023Pass-Final SD - Fire PumpPassView ↗
10/16/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/18/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/18/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/31/2022Pass-Final PL - UndergroundPassView ↗
05/06/2022Pass-Final PL - UndergroundPassView ↗
04/27/2022Pass-Final PL - UndergroundPassView ↗
03/09/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 139
DateRequirementInspectorRole
11/25/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
11/25/2025Fire-Resistance Rated ConstructionELIAS RASABIprogress
11/25/2025FinalELIAS RASABIprogress
11/25/2025Energy Code Compliance InspectionsELIAS RASABIprogress
11/25/2025Interior lighting powerELIAS RASABIenergy_progress
11/25/2025Lighting controlsELIAS RASABIenergy_progress
11/11/2025Fire-Resistance Rated Construction—progress
11/11/2025Lighting controlsELIAS RASABIenergy_progress
11/11/2025Interior lighting powerELIAS RASABIenergy_progress
11/11/2025Fire-Resistant Penetrations and Joints—special
11/11/2025FinalELIAS RASABIprogress
11/11/2025Energy Code Compliance Inspections—progress
05/14/2025FinalELIAS RASABIprogress
05/14/2025Interior lighting powerELIAS RASABIenergy_progress
05/14/2025Lighting controlsELIAS RASABIenergy_progress
02/03/2025HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
02/03/2025HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
02/03/2025Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
02/03/2025HVAC-R and service water heating equipmentAILANTO DANIEL MINAWIenergy_progress
02/03/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
02/03/2025Lighting controlsAILANTO DANIEL MINAWIenergy_progress
02/03/2025Maintenance informationAILANTO DANIEL MINAWIenergy_progress
01/22/2025Lighting controls—energy_progress
01/22/2025Final—progress
01/22/2025Interior lighting power—energy_progress
Latest 25 of 139.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Milk and HoneyRestaurant / Food ServiceFloor 1, Mezzanine
Project B01140473 Alteration · LOC Issued · 11/12/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 617 on file (BIS + DOB NOW)
▸Plans & Drawings57
▸DOB NOWPlans/Sketch42
09/01/2026B00489965-I1Request digital key ↗
09/01/2026B00547153-I1Request digital key ↗
09/01/2026B00555763-I1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/01/2026B00441625-I1Request digital key ↗
09/01/2026B00455578-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00441613-I1Request digital key ↗
09/01/2026B00441613-P1Request digital key ↗
09/01/2026B00441613-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/01/2026B00441692-I1Request digital key ↗
09/01/2026B00441692-P2Request digital key ↗
09/01/2026B00441692-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/01/2026B00441625-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/01/2026B00455577-P1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
09/01/2026B00458042-I1Request digital key ↗
▸Applications & Permits92
▸BISPLAN / WORK APPROVAL APPLICATION50
01/29/2026321599141Open ↗
01/28/2026321599141Open ↗
01/27/2026321599141Open ↗
Showing 3 of 50 on file for this type
▸BISWORK PERMIT APPLICATION38
11/13/2024321599141Open ↗
11/13/2024321599141Open ↗
09/25/2024321599141Open ↗
Showing 3 of 38 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
06/12/2023340802581Open ↗
Showing 1 of 2 on file for this type
▸BISDEP STORMWATER CONSTRUCTION PERMIT - 20K SQFT1
08/14/2023321599141Open ↗
▸BISDEP STORMWATER CONSTRUCTION PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
01/15/2025321599141Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFLOOD ZONE COMPLIANCE1
03/21/2024321599141Open ↗
▸BISVERIFY TAX LOT1
01/30/2026321599141Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
12/08/2021321599141Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications189
▸DOB NOWProgress Inspector Seal & Signature74
09/01/2026B01035014-P1Open ↗
09/01/2026B01140473-P2Open ↗
09/01/2026B01140473-P2Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature54
09/01/2026B00441613-P2Open ↗
09/01/2026B00441613-I1Open ↗
09/01/2026B00441613-P1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature46
09/01/2026B01035014-P1Open ↗
08/29/2026B00455577-I1Open ↗
08/29/2026B00455577-I1Open ↗
Showing 3 of 46 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment5
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
01/30/2025321599141Open ↗
08/14/2023321599141Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
01/30/2025321599141Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/26/2024321599141Open ↗
▸DOB NOWFDNY Fire Suppression1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos42
▸DOB NOWOER: Notice to Proceed24
09/01/2026B00441692-P1Open ↗
09/01/2026B00441692-I1Open ↗
Showing 2 of 24 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
09/01/2026B00441692-I1Open ↗
Showing 1 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/23/2024321599141Open ↗
▸BISOER LETTER OF NNO_PHASE21
07/17/2024321599141Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
03/18/2022321599141Open ↗
03/18/2022321599141Open ↗
Showing 2 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISENERGY COST BUDGET WORKSHEET2
04/25/2024321599141Open ↗
03/29/2022321599141Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00441692-I1Open ↗
Showing 1 of 2 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/12/2024321599141Open ↗
▸BISFENESTRATION AREAS1
07/12/2024321599141Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/12/2024321599141Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/26/2024321599141Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/26/2024321599141Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/03/2026321599141Open ↗
▸BISELECTRIC MOTORS1
03/21/2024321599141Open ↗
▸BISLIGHTING CONTROLS1
06/26/2024321599141Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY21
11/13/2023321599141Open ↗
11/07/2023321599141Open ↗
11/07/2023321599141Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/09/2026321599141Open ↗
Showing 1 of 2 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/12/2024321599141Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
12/22/2023321599141Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs42
▸BISSCHEDULE A - OCCUPANCY / USE30
01/29/2026321599141Open ↗
01/28/2026321599141Open ↗
01/27/2026321599141Open ↗
Showing 3 of 30 on file for this type
▸BISSUPERSEDING LETTER8
01/10/2024321599141Open ↗
01/10/2024321599141Open ↗
10/18/2022321599141Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
07/10/2023321599141Open ↗
07/10/2023321599141Open ↗
07/10/2023321599141Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership12
▸BISPROJECT-SPECIFIC GL INSURANCE5
09/25/2024321599141Open ↗
08/23/2024321599141Open ↗
03/14/2022321599141Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE4
08/23/2024321599141Open ↗
10/15/2021321599141Open ↗
Showing 2 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
08/23/2024321599141Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms54
▸BISADDITIONAL INFORMATION27
01/07/2026321599141Open ↗
11/14/2025321599141Open ↗
01/15/2025321599141Open ↗
Showing 3 of 27 on file for this type
▸BISBOROUGH INTAKE FORM23
11/13/2024321599141Open ↗
11/13/2024321599141Open ↗
08/23/2024321599141Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/25/2024321599141Open ↗
04/25/2024321599141Open ↗
04/25/2024321599141Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/12/2024321599141Open ↗
▸BISVESTIBULES1
06/26/2024321599141Open ↗
▸BISBPP: FILING REQUIRED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/21/2024321599141Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type