← Back
Elevator apt, fireproof without stores
Parkside (NYCHA)
2945 WHITE PLAINS ROAD · BIN 2101748
💬 Discuss this project
1950Year Built
14Stories
D3Building Class
R6Zoning
791,000 sfGross Floor Area
9,669Units
LL97 Covered2 Open Violations ▸FISP: No Report Filed
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 397,864 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA406/27/2026
NYC HOUSING AUTHORITY703/21/2026
NEW YORK CITY HOUSING AUTHORITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC HOUSING AUTHORITY107/30/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VINCENT SPINAElectrical203/21/2026
EUGENE FITZGERALDElectrical103/21/2026
CSI SECURITY AND ELECTRICGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA6902107/30/2025
Building Lifecycle
All (31)Filed (1)Permit Issued (1)Facade (FISP) (12)Violation (6)Objection (4)Special Inspection (7)
06/25/2026
Permit issued — General Construction
X01262674-I1-GC
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Zoning
08/12/2025
Objection raised — Admin
07/30/2025
Filed — Alteration
Application to be reviewed with the Development HUB. Site yard work and new 8'-0" high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.
X01262674-I1
07/29/2025
Special inspection requirement — Structural Steel - Details
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Structural Steel - High Strength Bolting
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
07/28/2025
Special inspection requirement — Final
IBRAHIM MOURAD
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2017
Cycle 8 facade report submitted
08/30/2017
Cycle 8 facade report signed — SAFE
08/29/2017
Cycle 8 facade inspection completed
07/21/2017
Cycle 7 facade report submitted
07/19/2017
Cycle 7 facade report signed — SAFE
07/14/2017
Cycle 7 facade inspection completed
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/09/2013
Cycle 7 facade report signed — UNSAFE
11/04/2013
Cycle 7 facade inspection completed
02/07/2013
Cycle 7 facade report submitted
02/07/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/26/2008
Cycle 6 facade report submitted
09/23/2008
Cycle 6 facade report signed — SWARMP
09/06/2007
Cycle 6 facade inspection completed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCSI SECURITY AND ELECTRIC06/25/2026
BISOTISSUEDNAVILLUS TILE INC05/18/2017
BISOTISSUEDNAVILLUS TILE INC05/18/2017
BISEQISSUEDNAVILLUS TILE INC03/28/2017
BISEQISSUEDNAVILLUS TILE INC12/13/2016
BISEQISSUEDNAVILLUS TILE INC12/07/2016
BISOTISSUEDNAVILLUS TILE INC11/07/2016
BISEQISSUEDNAVILLUS TILE INC03/10/2016
BISEQISSUEDNAVILLUS TILE INC01/22/2016
BISEQISSUEDNAVILLUS TILE INC12/14/2015
BISPLISSUEDOLYMPIA MECHANICAL02/12/2003
BISPLISSUEDBLUEPRINT PLUMBING CORP.05/07/1990
2 projects · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026Permit IssuedCSI SEC & ELECTRIC INCGeneral Wiring
04/28/2026CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
1 project · most recent 07/30/2025
Steel Concrete
FiledStatusContractorScope
07/30/2025Permit IssuedCSI SECURITY AND ELECTRICSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/29/2025Structural Steel - DetailsIBRAHIM MOURADspecial
07/29/2025Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
07/29/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
07/29/2025Post-installed AnchorsIBRAHIM MOURADspecial
07/29/2025Structural Steel - High Strength BoltingIBRAHIM MOURADspecial
07/29/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
07/28/2025FinalIBRAHIM MOURADprogress
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026X01262674-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
12/06/2016240118396Open ↗
12/06/2016240118403Open ↗
03/09/2016240133878Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
12/23/2016240118396Open ↗
11/07/2016220471941Open ↗
03/09/2016240133878Open ↗
Showing 3 of 5 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
12/28/2016220471941Open ↗
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
08/10/2017220471941Open ↗
08/10/2017220471941Open ↗
08/10/2017220471941Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/06/2016240118396Open ↗
12/06/2016240118403Open ↗
03/09/2016240133878Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/09/2016240133878Open ↗
12/13/2015240118403Open ↗
12/13/2015240118396Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/06/2016240118396Open ↗
12/06/2016240118403Open ↗
09/09/2015220471941Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/09/2016240133878Open ↗
12/13/2015240118403Open ↗
12/13/2015240118396Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026X01262674-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026X01262674-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026X01262674-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
08/10/2017220471941Open ↗
11/07/2016220471941Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
08/10/2017220471941Open ↗
08/10/2017220471941Open ↗
08/10/2017220471941Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/10/2017220471941Open ↗
08/10/2017220471941Open ↗
08/10/2017220471941Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/13/2015240118396Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/09/2016240133878Open ↗
12/13/2015240118403Open ↗
12/13/2015240118396Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/10/2017220471941Open ↗
08/10/2017240133878Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/23/2016240118396Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X01262674-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/10/2017220471941Open ↗
08/10/2017220471941Open ↗
09/09/2015220471941Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
08/08/2017220471941Open ↗
11/23/2015220471941Open ↗
11/10/2015220471941Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
03/09/2016240133878Open ↗
12/13/2015240118403Open ↗
12/13/2015240118396Open ↗
▸BISBOROUGH INTAKE FORM1
08/15/2017220471941Open ↗
▸BISEFILING COVER SHEET1
09/09/2015220471941Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/14/2016240118396Open ↗