Two family converted from one family
295 DECATUR STREET
BROOKLYN · BIN 3047099
💬 Discuss this project
1890Year Built
3Stories
B3Building Class
R6BZoning
2,560 sfGross Floor Area
2Units
Two family converted from one family · 1,867 sf lot · 1.37 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Gas piping replacement17p · 3 filings · 20 docs
Floor 2Gas piping replacement16p · 1 filing · 20 docs
Floor 1Gas piping replacement13p · 1 filing · 20 docs
BasementGas piping replacement6p · 2 filings · 20 docs
Sub-BasementGas piping replacement18p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Real Creative Motion Engineering SE702/27/2023
Professional Solutions Group512/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Light Expediting2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNA Plumbing Contractorsspecialty_contractor707/08/2026
Kodra ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Professional Solutions GR1756802/27/2023
Building Lifecycle
05/24/2023
Signed off — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-I1
05/24/2023
Signed off — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-S1
04/27/2023
Signed off — Alteration
Various new plumbing fixtures & relocations.
B00474311-I1
04/26/2023
Signed off — Alteration
B00474275-I1
02/27/2023
Filed — Alteration
Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on submitted plans. Test new gas piping. No change in use or egress.
B00610064-P5
68 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDNA Plumbing Contractors04/20/2022
DOB NOWPlumbingSigned-offDNA Plumbing Contractors02/24/2022
DOB NOWPlumbingSigned-offDNA Plumbing Contractors12/10/2021
DOB NOWGeneral ConstructionSigned-offKodra Construction10/19/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
02/15/2023HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
02/15/2023HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
02/15/2023HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
02/15/2023Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
02/15/2023Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
10/28/2022Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
10/28/2022Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
10/28/2022HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
10/28/2022HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
10/28/2022HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
05/12/2022Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
05/12/2022Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
05/12/2022HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
05/12/2022HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
05/12/2022HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
01/06/2022Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
01/06/2022Fire-Resistance Rated ConstructionSAMER ABOU-GHAIDAprogress
01/06/2022Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
01/06/2022FinalSAMER ABOU-GHAIDAprogress
01/06/2022Maintenance informationSAMER ABOU-GHAIDAenergy_progress
12/15/2021HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
12/15/2021Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
12/15/2021Mechanical SystemsSAMER ABOU-GHAIDAspecial
12/15/2021FinalSAMER ABOU-GHAIDAprogress
12/15/2021Maintenance informationSAMER ABOU-GHAIDAenergy_progress
Latest 25 of 31.
78 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account