← Back
Elevator cooperative
296 STERLING PLACE
BROOKLYN · BIN 3029326
💬 Discuss this project
1910Year Built
6Stories
D4Building Class
R8XZoning
29,724 sfGross Floor Area
22Units
LL97 CoveredRent Stabilized68 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 296 STERLING ARMS OWNERS CORP · 6,871 sf lot · 4.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 414p · 2 filings · 13 docs
Floor 3
Floor 2
Floor 1
Cellar4p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
296 STERLING ARMS OWNERS CORP.2703/22/2026
CONSTRUCTION SVC LL DARBY403/22/2026
JAL MANAGEMENT103/22/2026
J A L MANAGEMENT CORPO103/22/2026
OWNER OF 296 STERLING PL.103/22/2026
SHAREHOLDER103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1403/21/2026
KELLEY DESIGN203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREEN CONVERSIONS INCGeneral Contractor907/08/2026
DARBY CONSTRUCTION SVC LLGeneral Contractor507/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
ASPECT PLBNG&HTNG CO LLCPlumbing106/28/2026
GENESIS PLBG AND HTG CORPPlumbing107/08/2026
SHAW MECHANICAL INCPlumbing107/08/2026
BZJ CONSTRUCTION LLCGeneral Contractor107/08/2026
TESTERMAN PLBG & HTG INCPlumbing107/08/2026
GAUDIOSO CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004210/09/2024
TECNICO SPECIAL INSPECTIO5939504/22/2024
STEEL CORE ENGINEERING PL1098206/15/2022
RA ENGINEERING LLP6986103/23/2022
Building Lifecycle
All (167)Filed (19)Permit Issued (16)Signed Off (10)Violation (60)Inspection (11)Objection (28)Special Inspection (23)
05/05/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/05/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/05/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2025
Objection raised — Scope
11/10/2025
Filed — Alteration
REPLACE KITCHEN SINK, DW, CLOTHES WASHER, PRIMARY BATH LAVATORY, WC, & TUB AND RELOCATE GUEST BATH WC. REPLACE GAS RANGE.
B00843221-S1
10/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2025
Permit issued — Plumbing
B00843221-I1-PL
06/20/2025
Filed — Alteration
Kitchen remodel and wardrobe installation. PAA 1 adds a pre fabricated 2 hour UL rated box around the existing shower diverter to maintain plumbing chase rating.
B00974582-P1
06/05/2025
Permit issued — General Construction
B00974582-I1-GC
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Lockhart
01/19/2025
Objection resolved — Addressed
01/14/2025
Objection raised — Scope
01/10/2025
Filed — Alteration
REPLACE KITCHEN SINK, DW, CLOTHES WASHER, PRIMARY BATH LAVATORY, WC, & TUB AND RELOCATE GUEST BATH WC. REPLACE GAS RANGE.
B00843221-P1
12/06/2024
Signed off — Alteration
PLUMBING WORK ASSOCIATED WITH (OT) JOB # B00997680. RELOCATION OF 5 FIXTURES AND 3 NEW FIXTURES FOR BATHROOMS AND KITCHEN.
B00997687-I1
11/08/2024
Objection resolved — Addressed
11/07/2024
Objection raised — Admin
11/06/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH (OT) JOB # B00997680. RELOCATION OF 5 FIXTURES AND 3 NEW FIXTURES FOR BATHROOMS AND KITCHEN.
B00997687-P2
10/29/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH (OT) JOB # B00997680. RELOCATION OF 5 FIXTURES AND 3 NEW FIXTURES FOR BATHROOMS AND KITCHEN.
B00997687-P1
10/21/2024
Signed off — Alteration
RENOVATION OF EXISTING UNIT #15. REMOVE AND CONSTRUCT PARTITIONS. PLUMBING TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00997680-I1
10/17/2024
Special inspection requirement — Interior lighting power
ERIC BERLENT
10/17/2024
Special inspection requirement — Lighting in dwelling units
ERIC BERLENT
10/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
10/17/2024
Special inspection requirement — Final
JIWOO PARK
10/17/2024
Special inspection requirement — Lighting controls
ERIC BERLENT
10/09/2024
Filed — Alteration
RENOVATION OF EXISTING UNIT #15. REMOVE AND CONSTRUCT PARTITIONS. PLUMBING TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00997680-P1
08/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/26/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2024
Permit issued — Plumbing
B00997687-I1-PL
06/07/2024
Permit issued — General Construction
B00997680-I1-GC
04/22/2024
Filed — Alteration
REPLACE KITCHEN SINK, DW, CLOTHES WASHER, PRIMARY BATH LAVATORY, WC, & TUB AND RELOCATE GUEST BATH WC. REPLACE GAS RANGE.
B00843221-I1
04/16/2024
Signed off — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00730380-I1
04/12/2024
Objection resolved — Addressed
04/10/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/05/2024
Objection resolved — Addressed
04/05/2024
Objection resolved — Addressed
03/18/2024
Objection resolved — Addressed
03/11/2024
Objection raised — Other
03/11/2024
Objection raised — Scope
03/11/2024
Objection raised — Scope
03/11/2024
Objection raised — Scope
03/01/2024
Filed — Alteration
Kitchen remodel and wardrobe installation. PAA 1 adds a pre fabricated 2 hour UL rated box around the existing shower diverter to maintain plumbing chase rating.
B00974582-I1
02/28/2024
Objection resolved — Addressed
02/27/2024
Objection raised — Other
02/16/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH (OT) JOB # B00997680. RELOCATION OF 5 FIXTURES AND 3 NEW FIXTURES FOR BATHROOMS AND KITCHEN.
B00997687-I1
02/16/2024
Filed — Alteration
RENOVATION OF EXISTING UNIT #15. REMOVE AND CONSTRUCT PARTITIONS. PLUMBING TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00997680-I1
02/13/2024
Signed off — Alteration
B00730373-I1
02/13/2024
Signed off — Alteration
PROPOSE TO COMBINE APARTMENTS PURSUANT TPPN#3/97 FOR EXISTING DWELLING CELLAR & 1ST FL WITH INTERIOR RENOVATIONS WORK INCLUDES MINOR PARTITIONS & FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, & OCCUPANCY.
B00730348-I1
10/10/2023
Permit issued — Mechanical Systems
B00730373-I1-MS
09/21/2023
Permit issued — General Construction
B00730348-I1-GC
07/31/2023
Signed off — Alteration
PROPOSE STRUCTURAL WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00730362-I1
06/22/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2023
Permit issued — Plumbing
B00730380-I1-PL
05/09/2023
Signed off — Alteration
PROPOSE NEW SITE WORKS ON REAR YARD INCLUDE REPLACEMENT OF DAMAGED RETAINING WALL, NEW EXTERIOR STAIR, GUARD RAILING, FENCE, NEW NON-STRUCTURAL CONCRETE SLAB AS PER PLAN. NO WORK TO THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00687087-I1
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedASPECT PLBNG&HTNG CO LLC07/25/2025
DOB NOWGeneral ConstructionPermit IssuedGAUDIOSO CONTRACTING06/05/2025
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP07/11/2024
DOB NOWGeneral ConstructionSigned-offBZJ CONSTRUCTION LLC06/07/2024
DOB NOWMechanical SystemsSigned-offGREEN CONVERSIONS INC10/10/2023
DOB NOWGeneral ConstructionSigned-offGREEN CONVERSIONS INC09/21/2023
DOB NOWPlumbingSigned-offJAMES CRUZ05/24/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.11/17/2022
DOB NOWFoundationSigned-offDARBY CONSTRUCTION SVC LL11/02/2022
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC10/31/2022
DOB NOWMechanical SystemsSigned-offGREEN CONVERSIONS INC10/07/2022
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC10/05/2022
DOB NOWGeneral ConstructionSigned-offDARBY CONSTRUCTION SVC LL10/04/2022
DOB NOWSupport of ExcavationSigned-offDARBY CONSTRUCTION SVC LL10/04/2022
DOB NOWGeneral ConstructionSigned-offGREEN CONVERSIONS INC09/29/2022
DOB NOWStructuralSigned-offGREEN CONVERSIONS INC09/29/2022
BISPLISSUEDMETROTECH MECHANICAL CORP03/11/2022
BISOTISSUEDTIMOCON INTERIOR CONSTRUC02/04/2022
BISPLISSUEDWASOFF PLBG & UTILITY CO12/12/2017
BISOTISSUEDPENINSULA CONSTRUCTION IN11/02/2017
BISOTISSUEDGALLERY RESTORATION LTD07/17/2017
BISPLISSUEDVSP MECHANICAL INC06/28/2017
BISOTISSUEDGALLERY RESTORATION LTD05/19/2017
BISMHISSUEDGALLERY RESTORATION LTD05/19/2017
BISPLISSUEDORION PLUMBING & HTG CORP10/27/2016
BISOTRE-ISSUEDSMD CONSTRUCTION GROUP IN10/26/2016
BISOTISSUEDGEE BEE AND SONS LLC07/25/2016
BISOTISSUEDGEE BEE AND SONS LLC07/14/2016
BISOTISSUEDGEE BEE AND SONS LLC03/21/2016
BISEQISSUEDEVEREST SCAFFOLDING INC02/15/2016
BISEQISSUEDEVEREST SCAFFOLDING INC02/15/2016
BISOTISSUEDWM DORVILLIER & CO INC03/05/2010
BISPLISSUEDTRIPLE CROWN PLBG&HTG INC01/20/2010
BISOTISSUEDWM DORVILLIER & CO INC01/06/2010
BISPLISSUEDORBIT PLBG & HTG INC01/30/2009
BISOTISSUEDCENTRAL AIR CONDITIONING12/18/2008
BISPLISSUEDNEW YORK HEATING CORP12/03/2004
BISFSISSUEDNEW YORK HEATING CORP12/03/2004
1 project · most recent 11/10/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/10/2025Permit IssuedASPECT PLBNG&HTNG CO LLCGas, Water/Sanitary
4 projects · most recent 08/11/2025
General Wiring
FiledStatusContractorScope
08/11/2025Permit IssuedSUNBIRD ELECTRICAL CONTRGeneral Wiring
07/10/2024CompleteSUPER CHARGED ELEC. INC.General Wiring
05/21/2024CompleteACCURATE ELEC'L CORP.General Wiring
03/17/2023CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/22/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
01/21/2025Fire-Resistant Penetrations and JointsJose Lockhartspecial
10/17/2024Interior lighting powerERIC BERLENTenergy_progress
10/17/2024Lighting in dwelling unitsERIC BERLENTenergy_progress
10/17/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
10/17/2024FinalJIWOO PARKprogress
10/17/2024Lighting controlsERIC BERLENTenergy_progress
03/26/2023Fire-Resistant Penetrations and Joints—special
05/09/2022Fenestration and door U-factor and product ratingsYANNIK NEUFANGenergy_progress
05/09/2022Insulation placement and R valuesYANNIK NEUFANGenergy_progress
05/09/2022Protection of exposed foundation insulationYANNIK NEUFANGenergy_progress
05/09/2022Energy Code Compliance InspectionsYANNIK NEUFANGprogress
05/09/2022Lighting in dwelling unitsYANNIK NEUFANGenergy_progress
05/09/2022Fire-Resistance Rated ConstructionYANNIK NEUFANGprogress
05/03/2022FinalYANNIK NEUFANGprogress
03/10/2022Structural Steel - DetailsJose Lockhartspecial
03/10/2022Concrete - Cast-In-PlaceJose Lockhartspecial
03/10/2022Structural Stability – Alterations of existing buildingsJose Lockhartspecial
03/10/2022Structural Steel - WeldingJose Lockhartspecial
03/10/2022Subgrade InspectionsJose Lockhartspecial
03/10/2022Subsurface Conditions – Fill Placement & In-Place DensityJose Lockhartspecial
03/09/2022Footing and FoundationJose Lockhartprogress
03/09/2022FinalJose Lockhartprogress
03/09/2022FinalJose Lockhartprogress
▾Documents — 220 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/30/2026B00687087-I1Request digital key ↗
08/30/2026B00694525-I1Request digital key ↗
08/30/2026B00694529-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits35
▸BISWORK PERMIT APPLICATION17
03/17/2022321570215Open ↗
12/09/2021321570215Open ↗
12/12/2017340552565Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
03/21/2023321570215Open ↗
04/14/2022321570215Open ↗
04/13/2022321570215Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/01/2022321570215Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/20/2023321570215Open ↗
▸Seals & Professional Certifications62
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/29/2026B00730348-I1Open ↗
08/29/2026B00730373-I1Open ↗
08/29/2026B00730380-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
06/13/2018340552565Open ↗
06/30/2017340352665Open ↗
06/30/2017340352656Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00997680-I1Open ↗
09/01/2026B00997680-I1Open ↗
08/29/2026B00730348-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00997680-I1Open ↗
08/27/2026B00694525-I1Open ↗
08/27/2026B00694525-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/11/2017340552565Open ↗
02/12/2016340352665Open ↗
02/12/2016340352656Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/11/2017340552565Open ↗
02/12/2016340352665Open ↗
02/12/2016340352656Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/12/2016340352665Open ↗
02/12/2016340352656Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING6
04/14/2022321570215Open ↗
04/13/2022321570215Open ↗
12/22/2021321570215Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
05/20/2010320100421Open ↗
05/18/2010320100421Open ↗
03/26/2009310230274Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/09/2017321570215Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
10/11/2017340552565Open ↗
05/09/2017321570215Open ↗
▸BISSTREET TREE CHECKLIST1
05/09/2017321570215Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/29/2026B00730373-I1Open ↗
08/29/2026B00730380-I1Open ↗
08/26/2026B00997680-P1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/11/2017340552565Open ↗
02/12/2016340352665Open ↗
11/17/2015321270646Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/24/2009320100421Open ↗
11/14/2008310230274Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/09/2017321570215Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/01/2017321454797Open ↗
06/01/2017321454797Open ↗
05/19/2017321570215Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/21/2021321570215Open ↗
10/25/2017340552565Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/13/2018340552565Open ↗
06/01/2017321454797Open ↗
▸BISLIGHTING IN DWELLING UNITS2
04/18/2023321570215Open ↗
04/18/2023321570215Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/15/2026B00730348-I1Open ↗
08/13/2026B00730373-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/11/2017340552565Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/12/2016340352656Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/18/2023321570215Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/18/2023321570215Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/21/2021321570215Open ↗
10/11/2017340552565Open ↗
02/12/2016340352665Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
04/18/2023321570215Open ↗
04/18/2023321570215Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
04/20/2023321570215Open ↗
11/05/2018340552565Open ↗
06/13/2018340552565Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER4
03/17/2022321570215Open ↗
02/05/2022321570215Open ↗
02/01/2022321570215Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
11/17/2015321270646Open ↗
11/24/2009320100421Open ↗
11/14/2008310230274Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/01/2017321454797Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT11
12/21/2021321570215Open ↗
06/13/2018340552565Open ↗
10/11/2017340552565Open ↗
Showing 3 of 11 on file for this type
▸BISINSURANCE: WORKERS' COMPENSATION1
10/11/2017340552565Open ↗
▸BISINSURANCE: DISABILITY1
10/11/2017340552565Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/18/2023321570215Open ↗
▸BISINSURANCE: LIABILITY1
10/11/2017340552565Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET6
05/23/2017321570215Open ↗
05/09/2017321570215Open ↗
09/23/2016321454797Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
12/09/2021321570215Open ↗
11/05/2018340552565Open ↗
06/13/2018340552565Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
10/11/2017340552565Open ↗
02/12/2016340352665Open ↗
02/12/2016340352656Open ↗
▸BISADDITIONAL INFORMATION2
04/20/2023321570215Open ↗
04/19/2022321570215Open ↗
▸Other Documents5
▸DOB NOWDHCR Document3
08/29/2026B00730380-I1Open ↗
08/15/2026B00730348-I1Open ↗
08/13/2026B00730362-I1Open ↗
▸BISDHCR DOCUMENT1
02/01/2022321570215Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00694529-I1Open ↗