| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01091719 ↗ | BIN 2131002 BRONX | New Building | Permit Issued | 08/20/2024 | 09/23/2026 | Contractor TRISTATE FIRE SPRINK INC Filer JM ZONING, LLC. | Support of excavation work for new 18 story mixed use building as per plans filed herewith |
| M00755303 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | New Building | Permit Issued | 11/02/2022 | 08/12/2026 | Owner Evenhar Development Corp Contractor SD BUILDERS AND CONSTRUCT Filer JM ZONING, LLC. | TEMP SD job in conjunction with the NB application filed to construct a new 13 story commercial building. Tax lots 57, 60, 62, 163 merged in… |
| M00903689 ↗ | 1708 BROADWAY MANHATTAN | New Building | Permit Issued | 09/22/2023 | 05/26/2026 | Design DAGHER ENGINEERING PLLC Owner BROADWAY PT 1710 LLC Contractor WBC SERVICES INC Filer JM ZONING, LLC. | Superstructure construction for a new building as indicated on the attached drawings. |
| X00980196 ↗ | 1387 UNIVERSITY AVENUE BRONX | New Building | Permit Issued | 12/26/2023 | 05/06/2026 | Contractor MEGA CONTRACTING GP LLC Filer CORE CONSULTANTS NYC | STRUCTURAL IN CONJUCTION WITH NEW BUILDING JOB NUMBER# X00980196-I1 |
| Q00763375 ↗ | 28-90 REVIEW AVENUE QUEENS | New Building | Permit Issued | 07/15/2022 | 04/03/2026 | Design KSS ARCHITECTS LLP Contractor LEEDING BUILDERS GROUP LL | The proposed project is a new industrial use high-rise building located at 28 90 Review Avenue The overall building will be five stories… |
| M01304500 ↗ | 510 5 AVENUE MANHATTAN | Alteration | Permit Issued | 10/28/2025 | 02/06/2026 | Owner COLLIERS Contractor METRO PARTNERS GROUP INC Filer PWF | STRUCTURAL MODIFICATIONS TO INCLUDE PROVISION OF NEW ELEVATOR PIT. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| Name | Projects together | Most recent |
|---|---|---|
| DESIMONE CONSULTING ENGINEERS | 6 | 08/05/2026 |
| GEA CONSULTING ENGINEERS | 3 | 06/19/2024 |
| GILSANZ MURRAY STEFICEK LLP | 3 | 01/24/2024 |
| LANGAN ENGINEERING | 3 | 07/20/2026 |
| DAGHER ENGINEERING PLLC | 2 | 08/19/2026 |
| EP ENGINEERING LLC | 2 | 04/21/2026 |
| GACE DPC | 2 | 08/19/2026 |
| MAGNUSSON ARCHITECTURE AND PLANNING | 2 | 08/19/2026 |
| MCNAMARA SALVIA | 2 | 08/06/2026 |
| AKRF, INC. | 1 | 08/19/2026 |
| BERG MOSS ARCHITECTS | 1 | 08/05/2026 |
| BROMLEY CALDARI ARCHITECTS | 1 | 10/09/2025 |
| DATTNER ARCHITECTS | 1 | 04/21/2026 |
| DE NARDIS ENGINEERING, LLC | 1 | 04/21/2026 |
| ETTINGER ENGINEERING ASSOCIATES | 1 | 07/20/2026 |
| EXDEM ENGINEERING SERVICES | 1 | 06/02/2026 |
| KSS ARCHITECTS LLP | 1 | 06/02/2026 |
| KUTNICKI BERNSTEIN ARCHITECTS | 1 | 08/06/2026 |
| LONG ISLAND CONCRETE | 1 | 11/17/2021 |
| MARVEL | 1 | 08/12/2022 |
| MARVEL ARCHITECTS | 1 | 05/23/2023 |
| ME ENGINEERS | 1 | 06/02/2026 |
| MEYERS+ ENGINEERS | 1 | 05/15/2026 |
| PILLORI ASSOCIATES | 1 | 10/09/2025 |
| PLUS GROUP CONSULTING ENGG, PLLC | 1 | 05/23/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| FORWARD MECHANICAL CORP | 3 | 08/05/2026 |
| BONDEE ENTERPRISES INC | 2 | 08/05/2026 |
| BROADWAY CONSTRUCTION GRO | 2 | 01/24/2024 |
| DARBY CONSTRUCTION SVC LL | 2 | 09/06/2024 |
| HEUER & COMPANY | 2 | 12/08/2022 |
| JRM CONSTRUCTION MGMT LLC | 2 | 04/17/2025 |
| KG SPRINKLER CORP | 2 | 06/19/2024 |
| LEEDING BUILDERS GROUP LL | 2 | 06/02/2026 |
| MILL BROOK FIRE PROTECTIO | 2 | 08/19/2026 |
| PRESS BUILDERS INC | 2 | 06/19/2024 |
| A & M WARSHAW PLBG & HTG | 1 | 08/06/2026 |
| B.R. FRIES & ASSOCIATES L | 1 | 04/28/2022 |
| BAUER STRUCTURES INC | 1 | 05/15/2026 |
| BLETSAS P&H CORP | 1 | 07/20/2026 |
| BLETSAS PLBNG & HTG CORP | 1 | 04/21/2026 |
| BROADWAY BUILDERS LLC | 1 | 04/21/2026 |
| CAULDWELL WINGATE CO LLC | 1 | 08/12/2022 |
| CELTIC SERVICES NYC INC | 1 | 03/28/2022 |
| COOK & KRUPA LLC | 1 | 10/09/2025 |
| DONATO PLUMBING, INC | 1 | 08/12/2022 |
| FIRST STANDARD CONSTRUCT* | 1 | 08/02/2022 |
| FRANKIE PLBG & HTG L.L.C | 1 | 09/06/2024 |
| HEADQUARTERS MECH INC | 1 | 08/05/2026 |
| HQ FIRE PROTECTION INC | 1 | 08/05/2026 |
| LONG ISLAND CONCRETE INC | 1 | 11/17/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| 59 MAIDEN LANE ASSOCIATES, LLC | 3 | 04/17/2025 |
| KIRAN NY LLC | 2 | 12/08/2022 |
| PREMIER THIRD AVENUE DE LLC | 2 | 06/19/2024 |
| Tavros | 2 | 01/24/2024 |
| 28-90 REVIEW AVE PROPERTY OWNER | 1 | 06/02/2026 |
| BENNETT PROPERTY OWNER LLC | 1 | 05/23/2023 |
| BROADWAY PT 1710 LLC | 1 | 08/05/2026 |
| COLLIERS | 1 | 12/04/2025 |
| EAST END CAPITAL LLC | 1 | 05/15/2026 |
| Evenhar Development Corp | 1 | 08/06/2026 |
| GINDI CAPITAL | 1 | 08/02/2022 |
| NEW YORK CITY HOUSING AUTHORITY | 1 | 07/20/2026 |
| NORTHWELL HEALTH | 1 | 11/17/2021 |
| PHILIPS INTERNATIONAL HOLDING CORP. | 1 | 09/06/2024 |
| SD BUILDERS AND CONSTRUCTION LLC | 1 | 08/06/2026 |
| SDF EAST 243RD STREET HDFC | 1 | 08/19/2026 |
| Silver skyline construction llc | 1 | 08/05/2026 |
| TIDAL REAL ESTATE PARTNERS LP | 1 | 08/24/2022 |
| W59TH SHELTER HDFC | 1 | 04/21/2026 |
| WERBER MANAGEMENT | 1 | 08/12/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| JM ZONING, LLC. | 8 | 08/06/2026 |
| A1 EXPEDITING SERVICE CORP. | 4 | 06/02/2026 |
| JAM CONSULTANTS, INC. | 2 | 06/19/2024 |
| OUTSOURCE CONSULTANTS, INC. | 2 | 08/24/2022 |
| PWF | 2 | 12/04/2025 |
| ADAM MAISER | 1 | 08/05/2026 |
| CORE CONSULTANTS NYC | 1 | 08/19/2026 |
| METROPOLIS GROUP INC | 1 | 03/28/2022 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 08/02/2022 |
| UPRIGHT EXPEDITERS, INC. | 1 | 11/17/2021 |
| WILLIAM VITACCO ASSOCIATES | 1 | 05/23/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01091719 ↗ | BIN 2131002 BRONX | New Building | Permit Issued | 08/20/2024 | 09/23/2026 | Contractor TRISTATE FIRE SPRINK INC Filer JM ZONING, LLC. | Support of excavation work for new 18 story mixed use building as per plans filed herewith |
| M00755303 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | New Building | Permit Issued | 11/02/2022 | 08/12/2026 | Owner Evenhar Development Corp Contractor SD BUILDERS AND CONSTRUCT Filer JM ZONING, LLC. | TEMP SD job in conjunction with the NB application filed to construct a new 13 story commercial building. Tax lots 57, 60, 62, 163 merged in… |
| M00903689 ↗ | 1708 BROADWAY MANHATTAN | New Building | Permit Issued | 09/22/2023 | 05/26/2026 | Design DAGHER ENGINEERING PLLC Owner BROADWAY PT 1710 LLC Contractor WBC SERVICES INC Filer JM ZONING, LLC. | Superstructure construction for a new building as indicated on the attached drawings. |
| X00980196 ↗ | 1387 UNIVERSITY AVENUE BRONX | New Building | Permit Issued | 12/26/2023 | 05/06/2026 | Contractor MEGA CONTRACTING GP LLC Filer CORE CONSULTANTS NYC | STRUCTURAL IN CONJUCTION WITH NEW BUILDING JOB NUMBER# X00980196-I1 |
| Q00763375 ↗ | 28-90 REVIEW AVENUE QUEENS | New Building | Permit Issued | 07/15/2022 | 04/03/2026 | Design KSS ARCHITECTS LLP Contractor LEEDING BUILDERS GROUP LL | The proposed project is a new industrial use high-rise building located at 28 90 Review Avenue The overall building will be five stories… |
| M01304500 ↗ | 510 5 AVENUE MANHATTAN | Alteration | Permit Issued | 10/28/2025 | 02/06/2026 | Owner COLLIERS Contractor METRO PARTNERS GROUP INC Filer PWF | STRUCTURAL MODIFICATIONS TO INCLUDE PROVISION OF NEW ELEVATOR PIT. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| M00550178 ↗ | 537 WEST 59 STREET MANHATTAN | New Building | Permit Issued | 07/07/2021 | 02/04/2026 | Design DATTNER ARCHITECTS Owner W59TH SHELTER HDFC Contractor BROADWAY BUILDERS LLC Filer JM ZONING, LLC. | Structural work as per plans filed. |
| Q00704893 ↗ | 48-02 48TH AVENUE QUEENS | New Building | Permit Issued | 04/19/2022 | 12/17/2025 | Design MEYERS+ ENGINEERS Owner EAST END CAPITAL LLC Contractor BAUER STRUCTURES INC Filer JM ZONING, LLC. | Underpinning Foundation work filed in conjunction with NB Q00704893-I1 |
| M00707725 ↗ | 1291 3 AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2022 | 07/10/2025 | Design RA ENGINEERING LLP Contractor H M SPRINKLER INC Filer JAM CONSULTANTS, INC. | Sprinkler work in conjunction with Alt I Enlargement (#121188339). |
| M00707906 ↗ | 1295 3 AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2022 | 07/10/2025 | Design RA ENGINEERING LLP Contractor H M SPRINKLER INC Filer JAM CONSULTANTS, INC. | SPRINKLER WORK IN CONJUNCTION WITH ALT I ENLARGEMENT. |
| M01015202 ↗ | 59 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 03/13/2024 | 03/07/2025 | Design RA ENGINEERING LLP Contractor JRM CONSTRUCTION MGMT LLC | Filing herewith for Support of Excavation work for elevator pit & Stair Addition. |
| M01015280 ↗ | 59 MAIDEN LANE MANHATTAN | Alteration | Signed-off | 03/13/2024 | 03/07/2025 | Design WSP Contractor JRM CONSTRUCTION MGMT LLC | Filing herewith for Foundation work as per plans filed herewith. |
| Q00587561 ↗ | 72-11 ROOSEVELT AVENUE QUEENS | New Building | Permit Issued | 10/08/2021 | 04/01/2024 | Design MARVEL Owner WERBER MANAGEMENT Contractor CAULDWELL WINGATE CO LLC Filer JM ZONING, LLC. | Support of excavation and underpinning as per plans filed |
| M00962407 ↗ | 360 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/13/2024 | 03/29/2024 | Design EP ENGINEERING LLC Contractor DARBY CONSTRUCTION SVC LL Filer PWF | STRUCTURAL WORK ASSOCIATED WITH TENANT BUILD OUT TO INCLUDE DEMOLITION FOR ELEVATOR SHAFT AND STAIRCASE OPENING. ADDITION OF ELEVATOR PIT AN… |
| M00950464 ↗ | 59 MAIDEN LANE MANHATTAN | Alteration | Filed — no permit on record | 11/22/2023 | — | Design RA ENGINEERING LLP | — |
| M00705505 ↗ | 538 THIRD AVENUE MANHATTAN | Alteration | Signed-off | 03/28/2022 | 06/07/2023 | Design RA ENGINEERING LLP Contractor CELTIC SERVICES NYC INC Filer METROPOLIS GROUP INC | SUPPORT OF EXCAVATION WORK IN CONJUNCTION WITH NB# 121207942 FOOTING INSTALLATION FOR 421 A VESTING. |
| X00503539 ↗ | 579 COURTLANDT AVENUE BRONX | Alteration CO | Permit Issued | 04/27/2021 | 04/18/2023 | Design BROMLEY CALDARI ARCHITECTS Contractor COOK & KRUPA LLC Filer JM ZONING, LLC. | Installation of a temporary construction fence as per plans filed herewith. |
| M00289867 ↗ | 351 WEST 14TH STREET MANHATTAN | Alteration | Signed-off | 04/29/2021 | 01/17/2023 | Design GILSANZ MURRAY STEFICEK LLP Owner Tavros Contractor BROADWAY CONSTRUCTION GRO | Structural work as shown on plans. |
| M00289855 ↗ | 351 WEST 14TH STREET MANHATTAN | Alteration | Permit Issued | 04/29/2021 | 01/12/2023 | Design GILSANZ MURRAY STEFICEK LLP Owner Tavros Contractor BROADWAY CONSTRUCTION GRO | Structural work as shown on plans. |
| Q00787746 ↗ | 37-53 72 STREET QUEENS | Alteration | Signed-off | 08/22/2022 | 12/16/2022 | Owner KIRAN NY LLC Contractor HEUER & COMPANY Filer JM ZONING, LLC. | Foundation for replacement of one story CMU wall. |
| Q00794302 ↗ | 37-53 72 STREET QUEENS | Alteration | Signed-off | 08/29/2022 | 12/14/2022 | Design RA ENGINEERING LLP Owner KIRAN NY LLC Contractor HEUER & COMPANY Filer JM ZONING, LLC. | Provide support of excavation including underpinning work per plans filed herewith |
| M00775662 ↗ | 524 FORT WASHINGTON AVENUE MANHATTAN | New Building | Filed — no permit on record | 10/20/2022 | — | Design MARVEL ARCHITECTS | — |
| B00694529 ↗ | 296 STERLING PLACE BROOKLYN | Alteration | Signed-off | 03/23/2022 | 10/04/2022 | Design RA ENGINEERING LLP Contractor DARBY CONSTRUCTION SVC LL | PROPOSE SUPPORT OF EXCAVATION WORKS FOR RETAIN WALL REPLACEMENT AT REAR YARD AS PER PLAN IN CONJUNCTION WITH GC & FO APPLICATIONS FILED UNDE… |
| X00722241 ↗ | 2511 MARION AVENUE BRONX | Alteration | Signed-off | 08/02/2022 | 09/27/2022 | Design RA ENGINEERING LLP Owner GINDI CAPITAL Contractor FIRST STANDARD CONSTR INC | PROVIDE SUPPORT OF EXCAVATION PER PLANS FILED HEREWITH. SOE WORK CONSISTS OF ROCK REMOVAL, LINE & CHANNEL ROCK DRILLING, AND ROCK BOLT/STABI… |
| M00770921 ↗ | 165 MERCER STREET MANHATTAN | Alteration | Signed-off | 08/16/2022 | 09/02/2022 | Design GILSANZ MURRAY STEFICEK LLP Contractor MICHILLI INC | Structural modifications as per plans. No change in use egress or occupancy, |
| B00672821 ↗ | 3201 KINGS HIGHWAY BROOKLYN | Alteration | Signed-off | 04/28/2022 | 05/10/2022 | Design RA ENGINEERING LLP Contractor B.R. FRIES & ASSOCIATES L | MOUNT SINAI - NEW MRI INSTALLATION - SUPPORT OF EXCAVATION SCOPE RELATED TO THE INSTALLATION OF THE NEW MRI UNIT FOR MOUNT SINAI BROOKLYN. N… |
| S00629174 ↗ | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 11/17/2021 | 01/19/2022 | Design LONG ISLAND CONCRETE Owner NORTHWELL HEALTH (SIUH) Contractor LONG ISLAND CONCRETE INC Filer UPRIGHT EXPEDITERS, INC. | Northwell Health: Staten Island University Hospital: installation of support of excavation to install elevator pit in conjunction with Cance… |
| Building | Filings | Most Recent |
|---|---|---|
| BIN 2131002 ↗ | 2 | 07/20/2026 |
| 510 5 AVENUE ↗ | 2 | 12/04/2025 |
| 1578 LEXINGTON AVENUE ↗ | 4 | 11/05/2025 |
| 1708 BROADWAY ↗ | 9 | 09/29/2025 |
| 537 WEST 59 STREET ↗ | 6 | 08/27/2025 |
| 48-02 48TH AVENUE ↗ | 2 | 07/04/2025 |
| 59 MAIDEN LANE ↗ | 7 | 04/17/2025 |
| 1295 3 AVENUE ↗ | 3 | 06/19/2024 |
| 1291 3 AVENUE ↗ | 3 | 06/19/2024 |
| 1387 UNIVERSITY AVENUE ↗ | 1 | 02/23/2024 |
| 360 AVENUE OF THE AMER ↗ | 1 | 02/14/2024 |
| 351 WEST 14TH STREET ↗ | 3 | 01/24/2024 |
| 351 WEST 14TH STREET ↗ | 3 | 01/24/2024 |
| 48-02 48TH AVENUE ↗ | 1 | 08/23/2023 |
| 37-53 72 STREET ↗ | 4 | 12/08/2022 |
| 524 FORT WASHINGTON AVENUE ↗ | 1 | 10/25/2022 |
| 28-90 REVIEW AVENUE ↗ | 1 | 09/20/2022 |
| 165 MERCER STREET ↗ | 2 | 08/24/2022 |
| 2511 MARION AVENUE ↗ | 1 | 08/02/2022 |
| 72-11 ROOSEVELT AVENUE ↗ | 3 | 07/25/2022 |
| 579 COURTLANDT AVENUE ↗ | 2 | 07/15/2022 |
| 3201 KINGS HIGHWAY ↗ | 1 | 04/28/2022 |
| 538 THIRD AVENUE ↗ | 1 | 03/28/2022 |
| 296 STERLING PLACE ↗ | 1 | 03/23/2022 |
| 475 SEAVIEW AVENUE ↗ | 1 | 11/17/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/30/2026 | Excavations - Sheeting, Shoring, and Bracing | BIN 2131002 | NIDAL ABISAAB | special |
| 07/15/2026 | Excavations - Sheeting, Shoring, and Bracing | BIN 2131002 | NIDAL ABISAAB | special |
| 12/01/2025 | Excavations - Sheeting, Shoring, and Bracing | 510 5 AVENUE | NIDAL ABISAAB | special |
| 12/01/2025 | Structural Stability – Alterations of existing buildings | 510 5 AVENUE | NIDAL ABISAAB | special |
| 10/22/2025 | Subgrade Inspections | 1578 LEXINGTON AVENUE | NIDAL ABISAAB | special |
| 10/22/2025 | Concrete - Cast-In-Place | 1578 LEXINGTON AVENUE | Ryan Dow | special |
| 10/22/2025 | Deep Foundation Elements | 1578 LEXINGTON AVENUE | NIDAL ABISAAB | special |
| 10/22/2025 | Post-installed Anchors | 1578 LEXINGTON AVENUE | Ryan Dow | special |
| 10/22/2025 | Prestressed Rock and Soil Anchors | 1578 LEXINGTON AVENUE | NIDAL ABISAAB | special |
| 10/22/2025 | Subsurface Conditions – Fill Placement & In-Place Density | 1578 LEXINGTON AVENUE | ALEXIS SCHLESSINGERMAN | special |
| 10/22/2025 | Subsurface Investigations (Borings/Test Pits) | 1578 LEXINGTON AVENUE | NIDAL ABISAAB | special |
| 10/22/2025 | Final | 1578 LEXINGTON AVENUE | Ryan Dow | progress |
| 10/22/2025 | Footing and Foundation | 1578 LEXINGTON AVENUE | Ryan Dow | progress |
| 10/21/2025 | Footing and Foundation | 1708 BROADWAY | NIDAL ABISAAB | progress |
| 10/21/2025 | Final | 1708 BROADWAY | NIDAL ABISAAB | progress |
| 10/21/2025 | Prestressed Rock and Soil Anchors | 1708 BROADWAY | NIDAL ABISAAB | special |
| 10/21/2025 | Underpinning | 1708 BROADWAY | NIDAL ABISAAB | special |
| 10/21/2025 | Excavations - Sheeting, Shoring, and Bracing | 1708 BROADWAY | NIDAL ABISAAB | special |
| 10/16/2025 | Excavations - Sheeting, Shoring, and Bracing | 1708 BROADWAY | NIDAL ABISAAB | special |
| 10/16/2025 | Prestressed Rock and Soil Anchors | 1708 BROADWAY | NIDAL ABISAAB | special |
| 10/16/2025 | Structural Steel - Welding | 1708 BROADWAY | AILANTO DANIEL MINAWI | special |
| 10/16/2025 | Concrete - Cast-In-Place | 1708 BROADWAY | AILANTO DANIEL MINAWI | special |
| 10/16/2025 | Structural Stability – Alterations of existing buildings | 1708 BROADWAY | NIDAL ABISAAB | special |
| 10/16/2025 | Subgrade Inspections | 1708 BROADWAY | NIDAL ABISAAB | special |
| 09/25/2025 | Structural Stability – Alterations of existing buildings | 537 WEST 59 STREET | JUAN GOMEZ | special |
| 09/25/2025 | Concrete - Cast-In-Place | 537 WEST 59 STREET | JUAN GOMEZ | special |
| 09/25/2025 | Subsurface Conditions – Fill Placement & In-Place Density | 537 WEST 59 STREET | JUAN GOMEZ | special |
| 09/25/2025 | Post-installed Anchors | 537 WEST 59 STREET | JUAN GOMEZ | special |
| 09/25/2025 | Excavations - Sheeting, Shoring, and Bracing | 537 WEST 59 STREET | NIDAL ABISAAB | special |
| 09/25/2025 | Subsurface Investigations (Borings/Test Pits) | 537 WEST 59 STREET | NIDAL ABISAAB | special |
| 09/25/2025 | Deep Foundation Elements | 537 WEST 59 STREET | NIDAL ABISAAB | special |
| 09/25/2025 | Footing and Foundation | 537 WEST 59 STREET | JUAN GOMEZ | progress |
| 09/25/2025 | Final | 537 WEST 59 STREET | JUAN GOMEZ | progress |
| 09/08/2025 | Concrete - Cast-In-Place | 1708 BROADWAY | AILANTO DANIEL MINAWI | special |
| 09/08/2025 | Excavations - Sheeting, Shoring, and Bracing | 1708 BROADWAY | NIDAL ABISAAB | special |
| 09/08/2025 | Prestressed Rock and Soil Anchors | 1708 BROADWAY | NIDAL ABISAAB | special |
| 09/08/2025 | Structural Stability – Alterations of existing buildings | 1708 BROADWAY | NIDAL ABISAAB | special |
| 09/08/2025 | Structural Steel - Welding | 1708 BROADWAY | AILANTO DANIEL MINAWI | special |
| 09/08/2025 | Subgrade Inspections | 1708 BROADWAY | NIDAL ABISAAB | special |
| 09/08/2025 | Excavations - Sheeting, Shoring, and Bracing | 1708 BROADWAY | NIDAL ABISAAB | special |
| 09/08/2025 | Prestressed Rock and Soil Anchors | 1708 BROADWAY | NIDAL ABISAAB | special |
| 09/08/2025 | Underpinning | 1708 BROADWAY | NIDAL ABISAAB | special |
| 09/08/2025 | Final | 1708 BROADWAY | NIDAL ABISAAB | progress |
| 09/08/2025 | Footing and Foundation | 1708 BROADWAY | NIDAL ABISAAB | progress |
| 08/21/2025 | Footing and Foundation | 537 WEST 59 STREET | JUAN GOMEZ | progress |
| 08/21/2025 | Final | 537 WEST 59 STREET | JUAN GOMEZ | progress |
| 08/21/2025 | Subsurface Investigations (Borings/Test Pits) | 537 WEST 59 STREET | NIDAL ABISAAB | special |
| 08/21/2025 | Subsurface Conditions – Fill Placement & In-Place Density | 537 WEST 59 STREET | JUAN GOMEZ | special |
| 08/21/2025 | Structural Stability – Alterations of existing buildings | 537 WEST 59 STREET | JUAN GOMEZ | special |
| 08/21/2025 | Post-installed Anchors | 537 WEST 59 STREET | JUAN GOMEZ | special |