← Back
BuildNYC
Elevator apt, miscellaneous
2960 DECATUR AVENUE
BRONX · BIN 2016433
💬 Discuss this project
1967Year Built
6Stories
D9Building Class
R7AZoning
47,259 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized109 Active Violations 3 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Elevator apt, miscellaneous · Owner of record: HF Decabriggs · 12,000 sf lot · 3.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Sidewalk shed installation5p · 1 filing · 2 docs
Site & exteriorHeavy duty sidewalk shed installation5p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Decabriggs603/22/2026
2960 & 3029 LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Roger de Electric Co211/14/2023
Mohammad Ahead, PE106/02/2022
Haider Engineering, P.E111/14/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Salamon Engineering403/21/2026
Haider Engineering, P.E103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Z & Z Construction of NYGeneral Contractor603/21/2026
J & G Construction ServicesScaffold603/21/2026
RPJ ElectricElectrical103/21/2026
Torres IvanElectrical103/21/2026
HKS ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Salamon Engineering1264211/14/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
07/14/2026
Elevator Category 1 inspection report filed
06/17/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY,…
HPD violation · open
06/17/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WATERPROOF CAULKING AT BATHTUB IN THE BATHROOM LOCATED AT APT 4G,…
HPD violation · closed
06/17/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
222 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJ & G Construction Services05/04/2023
DOB NOWGeneral ConstructionSigned-offZ & Z Construction of NY01/26/2023
DOB NOWGeneral ConstructionSigned-offZ & Z Construction of NY09/13/2022
DOB NOWSidewalk ShedSigned-offJ & G Construction Services06/03/2022
DOB NOWSidewalk ShedSigned-offHKS Construction11/15/2017
BISOTISSUEDRose Contractor NY12/18/2017
BISEQISSUEDS S Bridging & Scaffoldin04/26/2013
BISOTISSUEDAll Care Contracting04/19/2013
BISFBISSUEDWasoff Plumbing & Utl Co12/21/1994
BISFBISSUEDHI-Tech Combustion03/23/1992
1 project · most recent 06/03/2022
FiledStatusContractorScope
06/03/2022CompleteRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/21/2023MasonryDavid Salamonspecial
11/21/2023FinalDavid Salamonprogress
11/09/2023MasonryDavid Salamonspecial
11/09/2023FinalDavid Salamonprogress
68 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account