Reid Hall
2961 BROADWAY · Morningside Heights · BIN 1082347
💬 Discuss this project
1901Year Built
14Stories
W6Building Class
R8Zoning
698,122 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Other college and university · Owner of record: Barnard College · 151,100 sf lot · 4.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofColumbia University Barnard CollegeUnder Construction1p · 4 filings · 19 docs
Floor 19Columbia University Barnard College1 filing · 15 docs
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarColumbia University Barnard College2 filings · 16 docs
Sub-BasementColumbia University Barnard College1 filing · 6 docs
Site & exteriorColumbia University Barnard CollegeUnder Construction12p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Barnard College3410/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs109/04/2026
Silman108/25/2026
George J. Xerakias, PE108/10/2026
Socotec107/30/2026
Loring Consulting Engineers507/28/2026
Integrated Design Group207/27/2026
Applied Design Initiative103/17/2021
James H. Fahey104/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec203/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Comcell ConstructionGeneral Contractor203/21/2026
Kings Group NYScaffold210/04/2026
Ics BuildersGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983608/25/2026
Socotec301107/30/2026
Atlantic Engineeringlabor1381103/17/2021
Building Lifecycle
All (81)Filed (14)Permit Issued (6)Signed Off (3)Facade (FISP) (15)Violation (5)Objection (8)Special Inspection (30)
09/04/2026
Filed — Alteration
EXTERIOR FACADE REPAIRS ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01418961-S1
09/04/2026
Permit issued — Supported Scaffold
M01418961-S1-SH
09/04/2026
Permit issued — Sidewalk Shed
M01418961-S1-SF
09/04/2026
Special inspection requirement — Post-installed Anchors
Navkiran Cheema
08/26/2026
Objection resolved — Resolved
08/25/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-S6
08/21/2026
Cycle 10 facade report signed — SWARMP
08/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND FACADE REPAIRS.
M01420863-I1
08/10/2026
Permit issued — Suspended Scaffold
M01420863-I1-SC
08/07/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
08/06/2026
Objection resolved — Resolved
08/06/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Scope
07/31/2026
Objection raised — Structural
07/30/2026
Filed — Alteration
EXTERIOR FACADE REPAIRS ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01418961-I1
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Scope
07/28/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-S5
07/28/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-S4
07/28/2026
Filed — Alteration
APPLICATION FILED FOR GENERAL CONSTRUCTION WORK TO PROTECT ALL MEP/BOILER EQUIPMENT AND SERVICES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399530-S1
07/28/2026
Filed — Alteration
APPLICATION FILED FOR GENERAL CONSTRUCTION WORK TO PROTECT ALL MEP/BOILER EQUIPMENT AND SERVICES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399530-S2
07/28/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-S2
07/27/2026
Filed — Alteration
APPLICATION FILED FOR GENERAL CONSTRUCTION WORK TO PROTECT ALL MEP/BOILER EQUIPMENT AND SERVICES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399530-I1
07/27/2026
Filed — Alteration
FILING FOR NEW STEEL DUNNAGE AT EXISTING ROOF TO SUPPORT NEW MEP ROUTING AS NOTED ON PLANS. NO CHANGE TO USE, EGRESS AND OCCUPANY.
M01399509-I1
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
07/17/2026
Cycle 10 facade report submitted
06/30/2026
Signed off — Alteration
M01369121-I1
06/28/2026
Cycle 10 facade inspection completed
06/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/23/2026
Special inspection requirement — Masonry
Jesse Rushworth
06/23/2026
Special inspection requirement — Post-installed Anchors
Jesse Rushworth
06/18/2026
Special inspection requirement — Final
Jesse Rushworth
06/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/09/2026
Special inspection requirement — Heating Systems
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/09/2026
Special inspection requirement — Maintenance information
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
06/05/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
06/05/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MARISA HARTE
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
06/01/2026
Special inspection requirement — Chimneys and vents
MARISA HARTE
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
06/01/2026
Special inspection requirement — Heating Systems
MARISA HARTE
06/01/2026
Special inspection requirement — Maintenance information
MARISA HARTE
06/01/2026
Special inspection requirement — Shutoff dampers
MARISA HARTE
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
06/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
MARISA HARTE
03/20/2026
Permit issued — Suspended Scaffold
M01369121-I1-SC
03/17/2026
Filed — Alteration
M01369121-I1
03/29/2023
Violation issued (HPD, closed)
A
09/30/2022
Cycle 9 facade report signed — SAFE
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedKings Group NY09/04/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/04/2026
DOB NOWSuspended ScaffoldPermit IssuedNew Roc Contracting08/10/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System03/20/2026
DOB NOWGeneral ConstructionSigned-offIcs Builders04/29/2021
DOB NOWAntennaSigned-offComcell Construction07/01/2019
BISOTISSUEDB & A Restoration Contracting03/14/2019
BISOTISSUEDB & A Restoration Contracting04/27/2018
BISOTISSUEDB & A Restoration Contracting11/06/2017
BISOTISSUEDB & A Restoration Contracting03/23/2017
BISOTISSUEDRC3 Electric06/09/2016
BISOTISSUEDRC3 Electric06/28/2013
BISOTISSUEDChampion Contruction06/21/2010
BIS—ISSUEDBerger Signs03/25/2008
BISOTISSUEDA. Best Contracting01/09/2007
BISSPISSUEDTaggart Associates07/09/2004
BISPLISSUEDTaggart Associates06/03/2004
BISMHISSUEDLendlease (US) Construction06/02/2004
BISOTISSUEDLendlease (US) Construction06/02/2004
BISPLISSUEDTaggart Associates06/10/2002
BISOTISSUEDCaldwell & Walsh Building Construction12/13/2001
BISPLISSUEDSatellite Plumbing11/28/2000
BISPLISSUEDBrennan Brothers Co01/25/1999
BISOTISSUEDA.W. & S. Construction Co09/29/1998
BISMHISSUEDWireless Development05/19/1998
BIS—ISSUEDCauldwell Wingate01/12/1998
BIS—ISSUEDCauldwell Wingate06/04/1997
BIS—ISSUEDTishman Construction Corp of NY01/11/1994
2 projects · most recent 08/25/2026
Others Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2026——Air Conditioning Systems, Heating Systems, Others, Ventilation Systems
Cooling
Mitsubishi Electric PKA-AK24NL 24,500 BTU · Split System ×2
PUY-AH24NL 24,500 BTU · Condensing Unit ×2
Heating
Aerco BMK-5000N 5,000 BTU · Boiler ×3
Markel 5100 400 CFM · Electric Heater ×1
Ventilation
Greenheck SQ-16-M2-VG 1,750 CFM · Exhaust Fan ×3
SQ-100VG 1,050 CFM · Exhaust Fan ×1
Other
Bell & Gossett 2.5AC Pump ×3
B300 ×1
RL-8F ×1
ap110-127-XL Heat Exchanger ×1
Neptune FTF-2CL ×1
07/28/2026——Others—
1 project · most recent 08/25/2026
FiledStatusContractorScope
08/25/2026———
2 projects · most recent 08/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/25/2026——Gas, Water/Sanitary
07/28/2026——Gas, Water/Sanitary
1 project · most recent 09/02/2026
FiledStatusContractorScope
09/02/2026Permit IssuedHigh Quality Electric of NYC—
2 projects · most recent 08/25/2026
Steel
FiledStatusContractorScope
08/25/2026——Steel
08/10/2026Permit IssuedNew Roc Contracting1 scope_items
1 project · most recent 09/04/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/04/2026Permit IssuedKings Group NYScaffold, Sidewalk Shed
1 project · most recent 08/10/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/10/2026Permit IssuedNew Roc ContractingSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
09/04/2026Post-installed AnchorsNavkiran Cheemaspecial
08/07/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
07/21/2026Energy Code Compliance Inspections—progress
07/21/2026Fire-Resistant Penetrations and Joints—special
07/21/2026Energy Code Compliance Inspections—progress
06/23/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/23/2026MasonryJesse Rushworthspecial
06/23/2026Post-installed AnchorsJesse Rushworthspecial
06/18/2026FinalJesse Rushworthprogress
06/09/2026Duct leakage testing, insulation and design—energy_progress
06/09/2026Heating Systems—special
06/09/2026HVAC-R and service water heating system controls—energy_progress
06/09/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026HVAC-R and service water heating equipment—energy_progress
06/09/2026Maintenance information—energy_progress
06/09/2026HVAC-R and service water heating system controls—energy_progress
06/09/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026Fire-Resistant Penetrations and Joints—special
06/08/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
06/05/2026Post-installed AnchorsMARISA HARTEspecial
06/05/2026Structural Steel - DetailsMARISA HARTEspecial
06/05/2026Structural Stability – Alterations of existing buildingsMARISA HARTEspecial
06/01/2026HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
06/01/2026Chimneys and ventsMARISA HARTEspecial
06/01/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
Latest 25 of 48.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Columbia University Barnard CollegeEducationEntire building
Project M01420863 Alteration · Permit Entire · 08/10/2026
Project M01418961 Alteration · Permit Entire · 07/30/2026
Project M01399509 Alteration · Approved · 07/27/2026
Project M01399530 Alteration · Approved · 07/27/2026
Project M01369121 Alteration · LOC Issued · 03/17/2026
Project M00480616 Alteration · LOC Issued · 03/17/2021
Project M00058618 Alteration · LOC Issued · 04/17/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/05/2026M00058618-I1Request digital key ↗
09/04/2026M00480616-I1Request digital key ↗
08/18/2026M01369121-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
09/12/2019123000199Open ↗
04/27/2018123000199Open ↗
11/09/2017123000199Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
09/14/2021103032861Open ↗
08/14/2017123000199Open ↗
08/10/2017123000199Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/05/2026M01418961-S1Open ↗
09/05/2026M00058618-I1Open ↗
08/16/2026M01399509-S5Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/07/2026M01399509-S2Open ↗
10/05/2026M01418961-S1Open ↗
09/01/2026M01418961-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/30/2020123000199Open ↗
03/26/2020123000199Open ↗
03/26/2020123000199Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
10/07/2026M01399509-S2Open ↗
10/07/2026M01399509-S2Open ↗
09/01/2026M01418961-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/01/2017123000199Open ↗
03/01/2017123000199Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/01/2017123000199Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
06/19/2023103797214Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00058618-I1Open ↗
08/16/2026M01399509-S4Open ↗
08/16/2026M01399509-S6Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/17/2018123000199Open ↗
03/24/2017123000199Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS1
03/30/2020123000199Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/01/2017123000199Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/14/2021103032861Open ↗
09/14/2021103032861Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
10/05/2026M01418961-S1Open ↗
08/16/2026M01399509-S6Open ↗
08/16/2026M01399509-S4Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/12/2019123000199Open ↗
09/11/2019123000199Open ↗
03/01/2017123000199Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/20/2023103797214Open ↗
09/14/2021103032861Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/19/2023103797214Open ↗
03/01/2017123000199Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
03/01/2017123000199Open ↗
▸BISBOROUGH INTAKE FORM1
03/27/2020123000199Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/14/2021103032861Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01369121-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01420863-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01420863-I1Open ↗