← Back
BuildNYC
Parsonage, rectory
Church of the Guardian Angel
2978 OCEAN PARKWAY · Name © OpenStreetMap contributors · BIN 3196584
💬 Discuss this project
1931Year Built
2Stories
M3Building Class
R6Zoning
2,814 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Parsonage, rectory · Owner of record: The Roman Catholic Church of the Guardia N Angel · 3,000 sf lot · 0.94 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 17 docs
Floor 21p · 1 filing · 17 docs
Floor 1Guardian Angel RC Church2p · 2 filings · 17 docs
Site & exteriorRocklyn Asset CORPUnder Construction13p · 2 filings · 17 docs
Filed — no permit issuedRocklyn Asset CORP85p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset1407/08/2026
Guardian Angel Church303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/07/2026$17.0M—THE ROMAN CATHOLIC CHURCH OF THE GUARDIAN ANGEL, → 2980 OCEAN PARKWAY LLC$6,041/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRM Consultants203/12/2026
Exdem Engineering Services302/27/2026
Paul Perdek, Prof. Engineering110/28/2025
Menzak Architect108/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Norman C. Lok, Mba, P.E203/21/2026
Expedite Dem603/21/2026
B Warranty Home Construction203/21/2026
AE Design Solution203/21/2026
Norman C Lok Mba P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Titan Industrial ServiceScaffold207/08/2026
Cambridge HVACspecialty_contractor104/09/2026
Titan Industrial ServiceGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Norman C. Lok818203/12/2026
C.M. Testing Laboratory1352202/27/2026
Building Lifecycle
All (55)Filed (7)Permit Issued (4)Signed Off (2)Violation (15)Objection (3)Special Inspection (24)
06/18/2026
Signed off — Full Demolition
full demolition of Two-story structure using hand-held and mechanical to assist.
B01298558-I1
05/29/2026
Permit issued — Full Demolition
B01298558-I1-FD
05/28/2026
Permit issued — Protection and Mechanical Methods
B01298558-S1-PMM
03/16/2026
Signed off — Alteration
PROPOSED SPLIT SYSTEMS
B01315376-I1
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
JOHN SEMIOLI
03/16/2026
Special inspection requirement — Demolition
JOHN SEMIOLI
03/13/2026
Special inspection requirement — Final
GHANENDRA MISHRA
03/13/2026
Special inspection requirement — Mechanical Systems
NORMAN LOK
03/12/2026
Filed — Alteration
PROPOSED SPLIT SYSTEMS
B01315376-P1
03/12/2026
Special inspection requirement — Mechanical Systems
NORMAN LOK
03/12/2026
Special inspection requirement — Final
GHANENDRA MISHRA
02/27/2026
Filed — Full Demolition
full demolition of Two-story structure using hand-held and mechanical to assist.
B01298558-P1
02/27/2026
Special inspection requirement — Demolition
JOHN SEMIOLI
02/27/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
JOHN SEMIOLI
02/24/2026
Special inspection requirement — Metering
02/24/2026
Special inspection requirement — Air barrier continuity plan testing
02/24/2026
Special inspection requirement — Interior lighting power
02/24/2026
Special inspection requirement — Maintenance information
02/24/2026
Special inspection requirement — Electrical motors and elevators
02/24/2026
Special inspection requirement — Lighting controls
02/24/2026
Special inspection requirement — Lighting in dwelling units
02/24/2026
Special inspection requirement — Exterior lighting power
12/24/2025
Objection resolved — Addressed
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2025
Permit issued — Mechanical Systems
B01315376-I1-MS
11/06/2025
Filed — Alteration
PROPOSED SPLIT SYSTEMS
B01315376-I1
11/05/2025
Permit issued — Construction Fence
B01309256-I1-FN
10/29/2025
Objection raised — Other
10/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01309256-I1
10/14/2025
Filed — Full Demolition
full demolition of Two-story structure using hand-held and mechanical to assist.
B01298558-I1
10/14/2025
Filed — Full Demolition
full demolition of Two-story structure using hand-held and mechanical to assist.
B01298558-S1
09/22/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
09/22/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
08/26/2025
Objection raised — Other
08/14/2025
Filed — New Building
PROPOSED NEW MIX-USE BUILDING WITH COMMUNITY FACILITY/DAYCARE & RESIDENTIAL USE WITH (99) DWELLING UNITS.
B01268544-I1
08/12/2025
Special inspection requirement — Fenestration areas
08/12/2025
Special inspection requirement — Air barrier - visual inspection
08/12/2025
Special inspection requirement — Fenestration air leakage
08/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
08/12/2025
Special inspection requirement — Insulation placement and R values
08/07/2025
Special inspection requirement — Lowest Floor Elevation
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/27/2000
Violation issued (ECB, closed)
Boilers
09/27/2000
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offTitan Industrial Service05/29/2026
DOB NOWProtection and Mechanical MethodsSigned-offTitan Industrial Service05/28/2026
DOB NOWMechanical SystemsSigned-offCambridge HVAC11/07/2025
DOB NOWConstruction FencePermit IssuedTitan Industrial Service11/05/2025
BISOTISSUEDG E Mechanical01/20/2000
BISPLISSUEDAL Haag & Son Plumbing & Heating02/25/1993
BISBLISSUEDAL Haag & Son Plumbing & Heating02/25/1993
1 project · most recent 12/20/2025
General Wiring
FiledStatusContractorScope
12/20/2025Permit IssuedForest Brook Electrical ContractingGeneral Wiring
1 project · most recent 10/28/2025
Fence
FiledStatusContractorScope
10/28/2025Permit IssuedTitan Industrial ServiceFence
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
03/16/2026Structural Stability – Alterations of existing BuildingsJOHN SEMIOLIspecial
03/16/2026DemolitionJOHN SEMIOLIspecial
03/13/2026FinalGHANENDRA MISHRAprogress
03/13/2026Mechanical SystemsNORMAN LOKspecial
03/12/2026Mechanical SystemsNORMAN LOKspecial
03/12/2026FinalGHANENDRA MISHRAprogress
02/27/2026DemolitionJOHN SEMIOLIspecial
02/27/2026Structural Stability – Alterations of existing BuildingsJOHN SEMIOLIspecial
02/24/2026Metering—energy_progress
02/24/2026Air barrier continuity plan testing—energy_progress
02/24/2026Interior lighting power—energy_progress
02/24/2026Maintenance information—energy_progress
02/24/2026Electrical motors and elevators—energy_progress
02/24/2026Lighting controls—energy_progress
02/24/2026Lighting in dwelling units—energy_progress
02/24/2026Exterior lighting power—energy_progress
09/22/2025Exterior Insulation and Finish Systems (EIFS)—special
09/22/2025Wall Panels, Curtain Walls, and Veneers—special
08/12/2025Fenestration areas—energy_progress
08/12/2025Air barrier - visual inspection—energy_progress
08/12/2025Fenestration air leakage—energy_progress
08/12/2025Fenestration and door U-factor and product ratings—energy_progress
08/12/2025Insulation placement and R values—energy_progress
08/07/2025Lowest Floor Elevation—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Guardian Angel RC ChurchReligiousFloor 1
Project B01315376 Alteration · LOC Issued · 11/06/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01298558-P1Request digital key ↗
08/20/2026B01298558-S1Request digital key ↗
08/20/2026B01298558-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01268544-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01268544-I1Open ↗
08/20/2026B01298558-I1Open ↗
08/20/2026B01309256-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01315376-I1Open ↗
08/28/2026B01315376-P1Open ↗
08/27/2026B01298558-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B01315376-I1Open ↗
08/28/2026B01315376-P1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWWater Cut-Off2
08/20/2026B01298558-I1Open ↗
08/13/2026B01298558-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/20/2026B01298558-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01298558-I1Open ↗
▸DOB NOWGas Cut-Off1
08/20/2026B01298558-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/20/2026B01298558-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01298558-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/20/2026B01298558-I1Open ↗
08/13/2026B01315376-I1Open ↗
08/13/2026B01315376-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/20/2026B01298558-I1Open ↗
08/13/2026B01298558-P1Open ↗
▸DOB NOWStructure Photographs2
08/20/2026B01298558-I1Open ↗
08/13/2026B01298558-P1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01268544-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01298558-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01298558-I1Open ↗