← Back
Elevator apt, semi-fireproof with stores
The Bronx Vibe
289 EAST 161 STREET · Concourse-Concourse Village · BIN 2130660
💬 Discuss this project
2022Year Built
13Stories
D7Building Class
R8AZoning
138,146 sfGross Floor Area
157Units
LL97 CoveredRent Stabilized4 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: BRONX 161 LLC · 17,035 sf lot · 8.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Roof1p · 2 filings
Bulkhead1p · 1 filing · 2 docs
Floor 11 filing · 2 docs
Site & exterior15 filings · 20 docs
Filed — no permit issued1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRONX 1619307/08/2026
DORIA607/08/2026
OWNERS REP503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/24/2019$2.1M—— → —— not available
11/17/2016$875K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC1403/21/2026
Rigid Structural Design, LLC103/21/2026
AE DESIGN SOLUTION1003/21/2026
PATUXENT ENGINEERING203/21/2026
GREEN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAY BUILDERS INCGeneral Contractor1507/08/2026
CAPITAL CONCRETE NY INCGeneral Contractor603/21/2026
XOLLE DEMO LLCGeneral Contractor607/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection607/08/2026
BEST MECHANICAL SVCS INCPlumbing307/08/2026
DORIA, INCGeneral Contractor307/08/2026
GWT ENTERPRISES INCGeneral Contractor303/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor307/08/2026
FQE ELECTRIC LLCElectrical203/22/2026
TRISTATE FIRE SPRINK INCFire Protection107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688811/21/2023
SKYLINE RIGGING7880104/05/2023
FNA ENGINEERING SERVICES7846308/16/2022
MCNAMARA/SALVIA OF NEW YO4970104/01/2020
Building Lifecycle
All (233)Filed (33)Permit Issued (32)Signed Off (23)Violation (21)Inspection (15)Objection (79)Special Inspection (30)
09/05/2026
Violation issued (HPD, open)
A
06/02/2026
Objection raised — Other
05/18/2026
Objection resolved — Resolved
05/08/2026
Violation issued (HPD, open)
A
04/28/2026
Objection resolved — Resolved
04/03/2026
Objection raised — Scope
04/02/2026
Objection raised — Other
03/26/2026
Filed — Alteration
RELOCATION AND ADDITION OF SPRINKLER HEAD IN THE DIVIDED RETAIL SPACES ON FIRST FLOOR.
X01363350-S1
03/26/2026
Filed — Alteration
RELOCATION AND ADDITION OF SPRINKLER HEAD IN THE DIVIDED RETAIL SPACES ON FIRST FLOOR.
X01363350-S2
03/25/2026
Special inspection requirement — Sprinkler Systems
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/10/2026
Filed — Alteration
RELOCATION AND ADDITION OF SPRINKLER HEAD IN THE DIVIDED RETAIL SPACES ON FIRST FLOOR.
X01363350-I1
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/04/2026
Special inspection requirement — Final
08/01/2025
Violation issued (HPD, closed)
A
08/01/2025
Violation issued (HPD, closed)
A
08/01/2025
Violation issued (HPD, closed)
A
08/01/2025
Violation issued (HPD, closed)
A
08/01/2025
Violation issued (HPD, closed)
A
08/01/2025
Violation issued (HPD, closed)
A
06/16/2025
Violation issued (HPD, closed)
A
04/15/2024
Signed off — Alteration
MECHANICAL IN CONJUNCTION WITH NEW BUILDING JOB NO.210181060
X00337715-I1
04/12/2024
Signed off — Alteration
X00337948-I1
04/12/2024
Signed off — Alteration
Plumbing in conjunction with the new building job number 210181060
X00337905-I1
03/06/2024
Signed off — Alteration
X07998308-I1
02/23/2024
Violation issued (ECB, closed)
Construction
02/20/2024
Signed off — Alteration
SPRINKLER/STANDPIPE IN CONJUNCTION WITYH NEW BUILDING JOB NUMBER 210181060
X00337995-I1
02/20/2024
Signed off — Alteration
CRURB CUT IN CONJUNCTION WITH NEW BUILDING JOB NO.210181060
X00346281-I1
02/20/2024
Signed off — Alteration
TEMP. STANDPIPE IN CONJUNCTION WITYH NEW BUILDING JOB NUMBER 210181060
X00517838-I1
02/19/2024
Signed off — Alteration
X00855365-I1
02/15/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/07/2024
Signed off — Alteration
X00303064-I1
02/07/2024
Signed off — Alteration
X00294032-I1
02/07/2024
Signed off — Alteration
X00294028-I1
02/07/2024
Signed off — Alteration
X00294007-I1
02/07/2024
Signed off — Alteration
X00303069-I1
02/07/2024
Signed off — Alteration
X00303079-I1
01/23/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00705783-I1
01/10/2024
Permit issued — Structural
X00337948-I1-ST
01/02/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00830260-I1
01/02/2024
Signed off — Alteration
X08015610-I1
12/22/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
12/22/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/21/2023
Permit issued — Mechanical Systems
X00337715-I1-MS
12/19/2023
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — Electrical energy consumption
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — HVAC insulation and sealing
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — HVAC and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — HVAC and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — Shutoff dampers
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — Electrical motors
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
12/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/07/2023
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
12/05/2023
Permit issued — Curb Cut
X00346281-I1-CC
Latest 60 of 233 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offRAY BUILDERS INC01/10/2024
DOB NOWMechanical SystemsSigned-offRAY BUILDERS INC12/21/2023
DOB NOWCurb CutSigned-offRAY BUILDERS INC12/05/2023
DOB NOWSprinklersSigned-offBEST MECHANICAL SVCS INC11/13/2023
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC11/11/2023
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC10/31/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES10/17/2023
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC05/24/2023
DOB NOWSupport of ExcavationSigned-offRAY BUILDERS INC05/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offDORIA, INC05/03/2023
DOB NOWConstruction FenceSigned-offRAY BUILDERS INC04/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offDORIA, INC04/05/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES02/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offCAPITAL CONCRETE NY INC12/13/2022
DOB NOWStructuralSigned-offRAY BUILDERS INC12/12/2022
DOB NOWMechanical SystemsSigned-offRAY BUILDERS INC12/09/2022
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC12/09/2022
DOB NOWSupport of ExcavationSigned-offRAY BUILDERS INC12/07/2022
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC11/10/2022
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC11/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offCAPITAL CONCRETE NY INC10/28/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES10/19/2022
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC05/20/2022
DOB NOWSupport of ExcavationSigned-offRAY BUILDERS INC05/04/2022
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC05/04/2022
DOB NOWConstruction FenceSigned-offRAY BUILDERS INC04/13/2022
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC02/18/2022
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC10/27/2021
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC10/01/2021
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC10/01/2021
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC10/01/2021
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC10/01/2021
BIS—ISSUEDRAY BUILDERS INC12/27/2023
BIS—ISSUEDRAY BUILDERS INC07/26/2023
BIS—ISSUEDRAY BUILDERS INC08/17/2022
BIS—ISSUEDRAY BUILDERS INC08/11/2022
BIS—RE-ISSUEDRAY BUILDERS INC04/25/2022
BIS—ISSUEDRAY BUILDERS INC04/25/2022
1 project · most recent 03/26/2026
FiledStatusContractorScope
03/26/2026——192 heads
1 project · most recent 03/26/2026
Water/Sanitary
FiledStatusContractorScope
03/26/2026——Water/Sanitary
11 projects · most recent 04/18/2024
General Wiring
FiledStatusContractorScope
04/18/2024CompleteFQE ELECTRIC LLCGeneral Wiring
04/09/2024CompleteFQE ELECTRIC LLC4 meters, 4 new_meters
04/09/2024CompleteFQE ELECTRIC LLCGeneral Wiring
05/12/2023CompleteSTAR ELEC'L CONTRACTORS C—
01/24/2023CompleteFQE ELECTRIC LLC1 meters, 1 new_meters
10/12/2022CompleteSOLAS ELECTRICAL CORP—
10/12/2022CompleteSOLAS ELECTRICAL CORP—
09/10/2020CompleteV. VASS ELECTRIC CORP—
09/10/2020CompleteV. VASS ELECTRIC CORP—
09/10/2020CompleteV. VASS ELECTRIC CORP—
08/26/2020CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/15/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
12/22/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/07/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
12/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/04/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
11/30/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/28/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/10/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
04/05/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/16/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/19/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/11/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
03/25/2026Sprinkler Systems—special
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026Fire-Resistant Penetrations and Joints—special
03/04/2026Fire-Resistant Penetrations and Joints—special
03/04/2026Fire-Resistance Rated Construction—progress
03/04/2026Final—progress
12/19/2023Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/19/2023Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
12/19/2023FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
12/19/2023Electrical energy consumptionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/19/2023HVAC insulation and sealing SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/19/2023HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/19/2023HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/19/2023Shutoff dampersSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/19/2023Electrical motorsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/19/2023Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/19/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
11/27/2023Standpipe SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
11/27/2023Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
11/21/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBASTIAN SETTEDUCATE JR., P.Especial
10/26/2023Electrical motorsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/26/2023Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
10/26/2023Standpipe SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
10/26/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
10/26/2023Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 46.
▾Documents — 225 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch12
08/25/2026X00517838-I1Request digital key ↗
08/24/2026X00705783-I1Request digital key ↗
08/24/2026X00705783-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence6
08/26/2026X00303064-I1Request digital key ↗
08/26/2026X00303069-I1Request digital key ↗
08/26/2026X00294028-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
08/26/2026X00388586-I1Request digital key ↗
08/26/2026X00388568-I1Request digital key ↗
08/26/2026X00388575-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/22/2026X00337995-P1Request digital key ↗
08/15/2026X00337995-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026X00337715-P1Request digital key ↗
08/14/2026X00337715-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/22/2026X00337995-P1Request digital key ↗
08/15/2026X00337995-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/14/2026X00337905-I1Request digital key ↗
08/14/2026X00337905-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026X00346281-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/26/2026X00337948-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION16
06/05/2025210181060Open ↗
03/22/2024210181060Open ↗
03/21/2024240274617Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION5
08/22/2022210181060Open ↗
08/22/2022210181060Open ↗
08/12/2022210181060Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/21/2023210181060Open ↗
▸BISHPD PERMIT NOTICE1
01/14/2022210181060Open ↗
▸BISPROVIDE HPD PERMIT NOTICE1
06/10/2025210181060Open ↗
▸BISOK TO ISSUE FINAL CERTIFICATE OF OCCUPANCY WITH OPEN APPLICATIONS NOT EFFECTING THE BASE BUILDING OR LIFE SAFETY CONDITIONS.1
06/16/2025210181060Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
01/14/2022210181060Open ↗
01/05/2022210181060Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/15/2020210181060Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/15/2020210181060Open ↗
▸BISVERIFY TAX LOT1
04/10/2024210181060Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/28/2023210181060Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/15/2020210181060Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/26/2026X00303079-I1Open ↗
08/26/2026X00303069-I1Open ↗
08/26/2026X00294032-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026X00337995-I1Open ↗
09/01/2026X00337715-P1Open ↗
08/30/2026X00564681-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026X00388586-I1Open ↗
09/01/2026X00337715-P1Open ↗
09/01/2026X00337715-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/15/2020240274617Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/24/2020240274617Open ↗
▸Trade Schedules & Equipment2
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/05/2024210181060Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/05/2024210181060Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
11/03/2021210181060Open ↗
01/11/2021240274617Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
01/05/2022210181060Open ↗
01/11/2021240274617Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/15/2020240274617Open ↗
▸BISSTREET TREE SIGNOFF1
04/05/2024210181060Open ↗
▸Environmental & Asbestos13
▸DOB NOWOER: Notice to Proceed8
08/13/2026X00337715-I1Open ↗
08/13/2026X00337948-I1Open ↗
08/13/2026X00337715-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026X00337715-I1Open ↗
08/13/2026X00337948-I1Open ↗
08/13/2026X00337905-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
04/11/2024210181060Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/03/2022210181060Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/01/2022210181060Open ↗
02/01/2022210181060Open ↗
07/15/2020210181060Open ↗
Showing 3 of 4 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
06/05/2025210181060Open ↗
06/05/2025210181060Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/05/2024210181060Open ↗
▸BISINTERIOR LIGHTING POWER1
04/05/2024210181060Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/05/2024210181060Open ↗
▸BISFENESTRATION AREAS1
04/05/2024210181060Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/05/2024210181060Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/05/2024210181060Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/05/2024210181060Open ↗
▸BISELECTRIC MOTORS1
04/05/2024210181060Open ↗
▸BISLIGHTING CONTROLS1
04/05/2024210181060Open ↗
▸BIS* HVAC INSULATION AND SEALING1
04/05/2024210181060Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/12/2024210181060Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00337715-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/01/2022210181060Open ↗
10/29/2021210181060Open ↗
10/29/2021210181060Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
10/27/2023210181060Open ↗
05/17/2023210181060Open ↗
05/17/2023210181060Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
04/05/2024210181060Open ↗
01/03/2022210181060Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/17/2023210181060Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/19/2023210181060Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/05/2024210181060Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/05/2024210181060Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
04/05/2024210181060Open ↗
▸BISSOIL REPORT1
11/03/2021210181060Open ↗
▸Approvals, Objections & Sign-offs17
▸BISSCHEDULE A - OCCUPANCY / USE8
03/22/2024210181060Open ↗
11/09/2023210181060Open ↗
10/25/2023210181060Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
01/28/2022240274617Open ↗
01/14/2022210181060Open ↗
01/14/2022210181060Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER1
08/22/2022210181060Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/13/2025210181060Open ↗
▸BISALL NSPECTION SIGN OFF REQUIRED PRIORTO ISSUING FINAL CERTIFICATE OF OCCUPANCY.1
06/16/2025210181060Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
06/16/2025210181060Open ↗
03/28/2024240274617Open ↗
03/28/2022210181060Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
08/22/2022210181060Open ↗
08/12/2022210181060Open ↗
04/26/2022210181060Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
05/27/2020210181060Open ↗
▸Other Documents9
▸BISPROOF OF COMPLIANCE FOR LL 92/94 OF 2019 IS TO BE SEALED, SIGNED AND DATED BY THE AOR.1
06/13/2025210181060Open ↗
▸BISSHUTOFF DAMPERS1
04/05/2024210181060Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/01/2020210181060Open ↗
▸BISPROVED PLAN MUST INDICATE THE SUSTAINALBE ROOF ZONE AREAS ON PLAN SHOWINGCOMPLIANCE WITH LOCAL LAW 92/94 OF 2019 REQUIREMENTS. PROVIDE PROOF OF COMPLIANCE1
06/13/2025210181060Open ↗
▸BISVESTIBULES1
04/05/2024210181060Open ↗
▸BISMAINTENANCE INFORMATION1
04/05/2024210181060Open ↗
▸BISPROVIDE HPD COMPLETION NOTICE1
06/09/2025210181060Open ↗
▸BISDOB NOW REVIEW COMPLETE1
06/10/2025210181060Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00564681-I1Open ↗