← Back
BuildNYC
Pier, dock, bulkhead
Tin Building
299 SOUTH STREET · BIN 1079600
💬 Discuss this project
1963Year Built
2Stories
T2Building Class
M1-4Zoning
365,687 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only ▸
Pier, dock, bulkhead · Owner of record: NYC Department of Small Business Services · 568,952 sf lot · 0.64 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew York City Department of Sanitation1 filing · 6 docs
Floor 1Televisa Univision, NYPD Narcotics Unit +122p · 10 filings · 15 docs
Mezzanine4p · 1 filing · 1 doc
Site & exteriorNYC Economic Development CORP11p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Economic Development1704/21/2026
NYPD Building Maintenance Section507/08/2026
NYC Department of Design and Construction303/22/2026
Nycedc303/22/2026
NYPD303/21/2026
DSNY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Architect603/21/2026
Metropolis Group603/21/2026
Municipal Building Consultants303/21/2026
P.wolfe Consultants203/21/2026
William Vitacco Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CNB ContractingGeneral Contractor303/21/2026
New York City Police DepartmentPlumbing207/08/2026
Glass Armor of New York Ispecialty_contractor203/21/2026
J.A. Lee Electricspecialty_contractor203/21/2026
Winick ProductionsGeneral Contractor203/21/2026
Anco Electl ContctngElectrical103/21/2026
Unisys ElectricElectrical103/21/2026
Peter J. CatanzaroElectrical103/21/2026
Awesome Electl ContngElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
R Marsac Consulting329103/18/2024
Tectonic Engineering Cons106107/05/2023
Building Lifecycle
All (88)Filed (17)Permit Issued (6)Signed Off (5)Violation (2)Objection (38)Special Inspection (20)
05/06/2026
Objection raised — Admin
05/06/2026
Objection raised — Accessibility
05/06/2026
Objection raised — Accessibility
05/06/2026
Objection raised — Accessibility
04/15/2026
Filed — Alteration
SUBSEQUENT FILING FOR INSTALLATION OF STRUCTURAL STEEL FRAMING TO SUPPORT NEW WATER HEATERS ON THE ROOF. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01349268-I1
04/15/2026
Filed — Alteration
SUBSEQUENT FILING FOR INSTALLATION OF STRUCTURAL STEEL FRAMING TO SUPPORT NEW WATER HEATERS ON THE ROOF. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01349268-S1
01/21/2026
Special inspection requirement — Maintenance information
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
01/20/2026
Special inspection requirement — Final
01/20/2026
Special inspection requirement — Structural Steel - Details
11/21/2025
Special inspection requirement — Final
11/06/2025
Objection resolved — Addressed
10/28/2025
Objection raised — Admin
10/11/2025
Filed — Alteration
PROPOSE TRENCHING FOR NEW CONDUIT ROUTING. REMOVE AND REPLACE EXISTING ASPHALT PAVEMENT IN-KIND. REMOVE AND REPLACE EXISTING CONCRETE PAVEMENT IN-KIND DUE TO TRENCHING. ALL AS PER PLANS FILED HEREWITH.
M01154275-P1
10/09/2025
Special inspection requirement — Final
07/29/2025
Signed off — Alteration
EMPTY, PURGE & CLEAN (1) 4,000-GALLON & (3) 3,000 -GALLON BIODIESEL USTS. CLOSE IN-PLACE (2) USTS & UPGRADED (2) USTS. INVESTIGATE FIFTH UST. UPGRADE DISPENSING, PIPING, SUMPS & LEAK DETECTION SYSTEM, RE-USE DISCHARGE PIPING, TEST FIRE SUPPRESSION SYSTEM.
M00880268-I1
07/28/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Scope
05/29/2025
Objection raised — Cost
05/29/2025
Objection raised — Cost
05/29/2025
Objection raised — Admin
05/14/2025
Filed — Alteration
PROPOSE TRENCHING FOR NEW CONDUIT ROUTING. REMOVE AND REPLACE EXISTING ASPHALT PAVEMENT IN-KIND. REMOVE AND REPLACE EXISTING CONCRETE PAVEMENT IN-KIND DUE TO TRENCHING. ALL AS PER PLANS FILED HEREWITH.
M01154275-S1
05/13/2025
Filed — Alteration
PROPOSE TRENCHING FOR NEW CONDUIT ROUTING. REMOVE AND REPLACE EXISTING ASPHALT PAVEMENT IN-KIND. REMOVE AND REPLACE EXISTING CONCRETE PAVEMENT IN-KIND DUE TO TRENCHING. ALL AS PER PLANS FILED HEREWITH.
M01154275-I1
01/10/2025
Signed off — Alteration
M01008623-I1
01/10/2025
Signed off — Alteration
M01008630-I1
06/26/2024
Permit issued — General Construction
M01008623-I1-GC
06/21/2024
Permit issued — Structural
M00880268-I1-GC-CX
06/18/2024
Filed — No Work
M01067627-I1
05/09/2024
Objection raised — Other
05/09/2024
Objection resolved — Addressed
05/08/2024
Filed — No Work
M01046676-I1
04/26/2024
Filed — Alteration
M00963484-I1
04/15/2024
Signed off — Alteration
M00866627-I1
03/18/2024
Filed — Alteration
M01008623-I1
03/18/2024
Filed — Alteration
M01008630-I1
03/08/2024
Special inspection requirement — Structural Steel - Details
Robert Marsac
03/08/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Robert Marsac
03/08/2024
Special inspection requirement — Structural Steel - Welding
Robert Marsac
03/08/2024
Special inspection requirement — Post-installed Anchors
Robert Marsac
02/21/2024
Special inspection requirement — Final
Robert Marsac
10/05/2023
Permit issued — Structural
M00928547-I1-ST
09/18/2023
Filed — Alteration
HEREWITH FILING FOR MANHOLE INSTALLATION AND TRENCHING PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00928547-I1
09/01/2023
Special inspection requirement — Final
Robert Marsac
07/10/2023
Objection raised — Other
07/10/2023
Objection resolved — Addressed
07/10/2023
Objection raised — Other
07/10/2023
Objection resolved — Addressed
07/10/2023
Objection raised — Other
07/10/2023
Objection resolved — Addressed
07/10/2023
Objection raised — Other
07/10/2023
Objection resolved — Addressed
07/05/2023
Filed — Alteration
EMPTY, PURGE & CLEAN (1) 4,000-GALLON & (3) 3,000 -GALLON BIODIESEL USTS. CLOSE IN-PLACE (2) USTS & UPGRADED (2) USTS. INVESTIGATE FIFTH UST. UPGRADE DISPENSING, PIPING, SUMPS & LEAK DETECTION SYSTEM, RE-USE DISCHARGE PIPING, TEST FIRE SUPPRESSION SYSTEM.
M00880268-I1
05/24/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCNB Contracting06/26/2024
DOB NOWStructuralSigned-offGlass Armor of New York I06/21/2024
DOB NOWStructuralSigned-offMic General Contracting10/05/2023
DOB NOWGeneral ConstructionSigned-offWinick Productions05/12/2023
DOB NOWBoiler EquipmentPermit IssuedNew York City Police Department01/15/2020
DOB NOWBoiler EquipmentPermit IssuedNew York City Police Department10/15/2019
BISMHISSUEDDonnelly Mechanical06/10/2019
1 project · most recent 04/15/2026
Water/Sanitary
FiledStatusContractorScope
04/15/2026——Water/Sanitary
9 projects · most recent 09/14/2026
General Wiring Lighting
FiledStatusContractorScope
09/14/2026Permit IssuedJ.A. Lee Electric ServicesGeneral Wiring
07/29/2025Permit IssuedUnisys Electric1 meters
07/21/2025Permit IssuedAnco Electl Contctng1 meters, 1 new_meters
09/18/2024CompleteJavelin Electric1 meters, 1 new_meters
06/26/2024Permit IssuedAwesome Electl Contng1 meters, 1 new_meters
06/19/2024CompletePeter J. CatanzaroGeneral Wiring
10/25/2023CompleteAbsolute Electrical Contracting ofLighting
07/25/2023Permit IssuedPolaris Electrical ConstructionGeneral Wiring
12/09/2022Permit IssuedP & M Elect'l ContractingGeneral Wiring
2 projects · most recent 04/15/2026
Steel
FiledStatusContractorScope
04/15/2026——Steel
09/18/2023Signed-offJ.A. Lee Electric1 scope_items
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/21/2026Maintenance information—energy_progress
01/21/2026HVAC-R and service water heating system controls—energy_progress
01/21/2026HVAC-R and service water piping design and insulation—energy_progress
01/21/2026HVAC-R and service water heating equipment—energy_progress
01/21/2026Fire-Resistant Penetrations and Joints—special
01/21/2026Energy Code Compliance Inspections—progress
01/20/2026Final—progress
01/20/2026Structural Steel - Details—special
11/21/2025Final—progress
10/09/2025Final—progress
03/08/2024Structural Steel - DetailsRobert Marsacspecial
03/08/2024Structural Steel - High Strength BoltingRobert Marsacspecial
03/08/2024Structural Steel - WeldingRobert Marsacspecial
03/08/2024Post-installed AnchorsRobert Marsacspecial
02/21/2024FinalRobert Marsacprogress
09/01/2023FinalRobert Marsacprogress
05/24/2023FinalGEORGE GHEBRYALprogress
05/24/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
05/24/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
12/20/2019Maintenance informationKARTIK CHANDAenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York City Department of SanitationGovernment / CivicFloor 1, Roof
Project M01349268 Alteration · Approved · 04/15/2026
Televisa UnivisionOfficeFloor 1
Project M00866627 Alteration · LOC Issued · 05/05/2023
NYPD Narcotics UnitGovernment / CivicFloor 1
Project M00238657 Alteration · Permit Entire · 10/02/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch11
09/06/2026M01349268-I1Request digital key ↗
09/06/2026M01349268-S1Request digital key ↗
08/31/2026M00866627-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly5
09/06/2026M00940352-I1Request digital key ↗
09/02/2026M00730541-I1Request digital key ↗
08/27/2026M01067627-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/05/2026M00238657-S1Request digital key ↗
08/15/2026M00238657-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/10/2019123721151Open ↗
▸BISWORK PERMIT APPLICATION1
06/10/2019123721151Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/06/2026M01349268-I1Open ↗
09/06/2026M01349268-S1Open ↗
09/02/2026M00730541-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026M01008630-I1Open ↗
08/29/2026M01008630-I1Open ↗
08/29/2026M01008630-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026M00238657-S1Open ↗
08/29/2026M00928547-I1Open ↗
08/29/2026M01008630-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/10/2019123721151Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/10/2019123721151Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/10/2019123721151Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE PERMITS1
12/13/2021123721151Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/13/2021123721151Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/06/2026M01349268-S1Open ↗
09/06/2026M01349268-I1Open ↗
08/27/2026M00963484-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/10/2019123721151Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS1
12/13/2021123721151Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/13/2021123721151Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/10/2019123721151Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00238657-S1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/13/2021123721151Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/02/2026M00730541-I1Open ↗
08/31/2026M00866627-I1Open ↗
08/27/2026M01008623-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026M00880268-I1Open ↗
08/13/2026M01008630-I1Open ↗
08/13/2026M01008623-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026M01008623-I1Open ↗
08/13/2026M01008630-I1Open ↗
08/13/2026M00880268-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/13/2021123721151Open ↗
06/10/2019123721151Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/10/2019123721151Open ↗