BuildNYC
Elevator apt, semi-fireproof with stores
Polo Grounds Towers (NYCHA)
2991 FREDERICK DOUGLASS BOULEVARD · BIN 1084521
💬 Discuss this project
2004Year Built
30Stories
D7Building Class
R7-2Zoning
2,531,670 sfGross Floor Area
1,615Units
LL97 Covered3 Active Violations 0 unresolved · 3 paperwork only ▸FISP: UNSAFE
Elevator apt, semi-fireproof with stores · Owner of record: NYC Housing Authority · 746,956 sf lot · 3.39 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOutriggers system installation for facade repairsUnder Construction2p · 4 filings · 20 docs
BulkheadPneumatic Solid Waste System at Polo Ground TowersUnder Construction2p · 2 filings · 12 docs
Floor 1W York City Housing AuthoritUnder Construction26p · 5 filings · 20 docs
CellarW York City Housing AuthoritUnder Construction33p · 3 filings · 20 docs
Site & exteriorNew York City Housing AuthorUnder Construction12p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority7809/25/2026
Housing203/21/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Queens707/01/2026
Pace Engineering107/17/2025
Dewberry Engineers409/25/2024
D.P. Consulting804/25/2024
Marvel Architects312/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants703/21/2026
Smep Design & Consultation203/21/2026
D.P. Consulting403/21/2026
Eurocelt Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empire Control Abatementspecialty_contractor1107/08/2026
Jansons AssoicatesGeneral Contractor507/08/2026
Navillus TileGeneral Contractor407/08/2026
Roma ScaffoldingScaffold409/25/2026
V. C. Vitanza SonsFire Protection309/17/2026
247 ElectricalElectrical203/21/2026
Hylan Datacom & ElectricalElectrical103/21/2026
Roma Scaffoldingspecialty_contractor104/09/2026
Kanta ElectricElectrical103/21/2026
C.G.S. Electrical ContractingElectrical103/21/2026
A.T.J. Electrical CoElectrical103/21/2026
Hylan Datacom & ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Queens Engineering8898307/01/2026
Joel Phagoo, PE2416105/26/2026
Bureau Veritas Na6902107/17/2025
Tectonic Engineering Cons1061509/25/2024
Building Lifecycle
All (160)Filed (25)Permit Issued (32)Signed Off (3)Facade (FISP) (13)Violation (38)Inspection (5)Objection (14)Special Inspection (30)
09/24/2026
Permit issued — Sidewalk Shed
M01286766-I1-SH
09/24/2026
Permit issued — Construction Fence
M01286771-I1-FN
09/16/2026
Permit issued — Sprinklers
M08032280-I1-EW-SP
07/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
07/02/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
07/01/2026
Filed — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR FACADE REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01410583-P1
06/26/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
06/26/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
06/12/2026
Filed — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR FACADE REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01410583-I1
06/12/2026
Permit issued — Suspended Scaffold
M01410583-I1-SC
06/09/2026
Permit issued — Suspended Scaffold
M01404803-I1-SC
05/26/2026
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01404803-I1
05/13/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01129628-I1
05/12/2026
Permit issued — Suspended Scaffold
M01129628-I1-SC
05/06/2026
Permit issued — Mechanical Systems
M08032143-I1-MS
04/10/2026
Permit issued — General Construction
M08027636-I1-GC
04/07/2026
Permit issued — Suspended Scaffold
M01332094-I1-SC
03/24/2026
Permit issued — General Construction
M01256103-I1-GC
02/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2991 FREDERICK DOUGLASS BOULEVARD, NEW YORK, NY, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01286771-P2
01/27/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01286766-P2
01/15/2026
Permit issued — Suspended Scaffold
M01332094-I1-SC
01/15/2026
Cycle 10 facade report submitted
01/13/2026
Cycle 10 facade inspection completed
01/09/2026
Filed — Alteration
OUTRIGGERS SYSTEM INSTALLATION AND MATERIAL HOIST FOR ROOF AND FACADE REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01332094-I1
01/09/2026
Permit issued — Suspended Scaffold
M01332094-I1-SC
12/11/2025
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
12/11/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
09/19/2025
Permit issued — Construction Fence
M01286771-I1-FN
09/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2991 FREDERICK DOUGLASS BOULEVARD, NEW YORK, NY, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01286771-I1
09/18/2025
Permit issued — Sprinklers
M08032280-I1-EW-SP
09/16/2025
Permit issued — Sidewalk Shed
M01286766-I1-SH
09/15/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01286766-I1
07/24/2025
Objection resolved — Addressed
07/23/2025
Objection raised — Cost
07/17/2025
Filed — Alteration
BUILDING 4: FACADE REPAIRS TO COMPLY WITH LL/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01256103-I1
07/15/2025
Special inspection requirement — Final
IBRAHIM MOURAD
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
07/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
07/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
07/15/2025
Special inspection requirement — Air barrier - visual inspection
IBRAHIM MOURAD
07/15/2025
Special inspection requirement — Masonry
IBRAHIM MOURAD
07/11/2025
Violation issued (ECB, closed)
Construction
06/24/2025
Permit issued — Mechanical Systems
M08032143-I1-MS
06/13/2025
Cycle 10 facade report signed — UNSAFE
02/27/2025
Permit issued — Mechanical Systems
M08032143-I1-MS
02/26/2025
Permit issued — General Construction
M08027636-I1-GC
01/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/06/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
12/06/2024
Permit issued — Suspended Scaffold
M01129628-I1-SC
11/22/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01129628-I1
10/31/2024
Permit issued — Sprinklers
M08032280-I1-EW-SP
10/21/2024
Permit issued — Structural
M08034181-I1-ST
10/07/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
10/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
10/07/2024
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
10/07/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
10/07/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
Latest 60 of 160 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRoma Scaffolding09/24/2026
DOB NOWConstruction FencePermit IssuedRoma Scaffolding09/24/2026
DOB NOWSprinklersPermit IssuedV. C. Vitanza Sons09/16/2026
DOB NOWSuspended ScaffoldPermit IssuedEast Coast Builders Group06/12/2026
DOB NOWSuspended ScaffoldPermit IssuedZoria Housing06/09/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System05/12/2026
DOB NOWMechanical SystemsPermit IssuedJansons Assoicates05/06/2026
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile04/10/2026
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng04/07/2026
DOB NOWGeneral ConstructionPermit IssuedRoma Scaffolding03/24/2026
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng01/15/2026
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng01/09/2026
DOB NOWConstruction FencePermit IssuedRoma Scaffolding09/19/2025
DOB NOWSprinklersPermit IssuedV. C. Vitanza Sons09/18/2025
DOB NOWSidewalk ShedPermit IssuedRoma Scaffolding09/16/2025
DOB NOWMechanical SystemsPermit IssuedJansons Assoicates06/24/2025
DOB NOWMechanical SystemsPermit IssuedJansons Assoicates02/27/2025
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile02/26/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/06/2024
DOB NOWSprinklersPermit IssuedV. C. Vitanza Sons10/31/2024
DOB NOWStructuralPermit IssuedNavillus Tile10/21/2024
DOB NOWMechanical SystemsPermit IssuedJansons Assoicates08/30/2024
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile02/22/2024
DOB NOWMechanical SystemsSigned-offEmpire Control Abatement04/03/2023
DOB NOWStructuralSigned-offEmpire Control Abatement04/03/2023
DOB NOWMechanical SystemsSigned-offEmpire Control Abatement04/12/2022
DOB NOWStructuralSigned-offEmpire Control Abatement04/12/2022
DOB NOWMechanical SystemsSigned-offEmpire Control Abatement04/08/2022
DOB NOWStructuralSigned-offEmpire Control Abatement04/01/2022
DOB NOWMechanical SystemsSigned-offEmpire Control Abatement04/01/2022
DOB NOWStructuralSigned-offEmpire Control Abatement07/02/2021
DOB NOWMechanical SystemsSigned-offEmpire Control Abatement07/01/2021
BISPLISSUEDNYC Housing Authority07/26/2012
BISPLISSUEDNYC Housing Authority10/11/2011
BISPLISSUEDDynamic Contracting06/21/2010
BISOTISSUEDMillenium Century Construction03/04/2010
BISEQISSUEDMBR Contracting10/16/2009
BISEQISSUEDPioneer General Construction03/01/2007
BISEQISSUEDPowers Bridging & Scaffolding04/24/2006
BISEQISSUEDPowers Bridging & Scaffolding01/31/2006
+ 10 more permits on file
6 projects · most recent 09/26/2026
General Wiring Lighting
FiledStatusContractorScope
09/26/2026Permit IssuedHylan Datacom & Electrical—
01/05/2026CompleteCsi Sec & Electric—
09/15/2025Permit IssuedHylan Datacom & Electrical—
02/25/2025Permit IssuedKanta ElectricGeneral Wiring
05/05/2023Permit IssuedTru-Val ElectricGeneral Wiring, Lighting
12/08/2020Permit IssuedHylan Datacom & Electrical2 meters, 1 new_meters
1 project · most recent 09/25/2024
Steel Concrete
FiledStatusContractorScope
09/25/2024Permit IssuedNavillus TileSteel, Concrete
2 projects · most recent 02/11/2026
Fence Sidewalk Shed
FiledStatusContractorScope
02/11/2026Permit IssuedRoma ScaffoldingFence
01/27/2026Permit IssuedRoma ScaffoldingSidewalk Shed
3 projects · most recent 07/01/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/01/2026Permit IssuedEast Coast Builders GroupSuspended Scaffold (SC)
05/26/2026Permit IssuedZoria HousingSuspended Scaffold (SC)
01/09/2026Permit IssuedRoma ScaffoldingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/06/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/02/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
07/02/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
06/26/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
06/26/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
12/11/2025Post-installed AnchorsANDREAS CHRISTOFOROUspecial
12/11/2025Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
07/15/2025MasonryIBRAHIM MOURADspecial
07/15/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
07/15/2025FinalIBRAHIM MOURADprogress
07/15/2025Energy Code Compliance InspectionsIBRAHIM MOURADprogress
07/15/2025Air barrier - visual inspectionIBRAHIM MOURADenergy_progress
07/15/2025Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
10/07/2024FinalGEORGE GHEBRYALprogress
10/07/2024Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
10/07/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
10/07/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
10/07/2024Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
04/26/2024Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
04/26/2024Subgrade InspectionsGEORGE GHEBRYALspecial
04/26/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/26/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
04/26/2024FinalGEORGE GHEBRYALprogress
04/26/2024Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
04/26/2024Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
04/24/2024Subgrade InspectionsGEORGE GHEBRYALspecial
Latest 25 of 74.
▾Documents — 258 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch17
09/01/2026M08032143-I1Request digital key ↗
09/01/2026M08032280-I1Request digital key ↗
08/28/2026M08027636-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Structural5
09/04/2026M00390039-P4Request digital key ↗
09/04/2026M00390039-P3Request digital key ↗
09/04/2026M00390039-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00341960-P1Request digital key ↗
09/04/2026M00341960-P2Request digital key ↗
09/04/2026M00341960-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION8
07/26/2012121161946Open ↗
10/12/2011120858982Open ↗
02/16/2010120265596Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION8
07/30/2012121161946Open ↗
10/12/2011120858982Open ↗
06/22/2010120265596Open ↗
Showing 3 of 8 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
12/07/2011120176567Open ↗
10/21/2010120176567Open ↗
▸Seals & Professional Certifications105
▸DOB NOWSpecial Inspector Seal & Signature46
09/23/2026M00390039-P4Open ↗
09/23/2026M00390039-P4Open ↗
09/23/2026M00390039-P4Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/04/2026M00341960-P2Open ↗
09/04/2026M00341960-P1Open ↗
09/04/2026M00341960-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026M00390039-P4Open ↗
09/20/2026M00390039-P2Open ↗
09/01/2026M08027636-P2Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
03/21/2013121161946Open ↗
07/26/2012121161946Open ↗
05/07/2012120858982Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
07/26/2012121161946Open ↗
10/12/2011120858982Open ↗
02/16/2010120265596Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
10/12/2011120858982Open ↗
02/16/2010120265596Open ↗
02/16/2010120264640Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING5
07/26/2012121161946Open ↗
10/12/2011120858982Open ↗
10/12/2011120858982Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
11/30/2011120858982Open ↗
06/15/2011120264640Open ↗
06/15/2011120265596Open ↗
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan8
09/04/2026M00341960-P1Open ↗
09/04/2026M00341960-I1Open ↗
09/04/2026M00341960-P2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/04/2026M00341960-I1Open ↗
09/04/2026M00390039-I1Open ↗
09/01/2026M08032280-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/12/2011120858982Open ↗
02/16/2010120265596Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/15/2009120176610Open ↗
10/14/2009120176567Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/26/2012121161946Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/08/2013121161946Open ↗
07/30/2012121161946Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/12/2011120858982Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/21/2013121161946Open ↗
▸Approvals, Objections & Sign-offs51
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
09/04/2026M00341960-P2Open ↗
09/04/2026M00341960-I1Open ↗
09/04/2026M00341960-P1Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
03/27/2024101024366Open ↗
04/08/2013121161946Open ↗
03/21/2013121161946Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
07/26/2012121161946Open ↗
10/12/2011120858982Open ↗
02/16/2010120265596Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/26/2026M08034181-I1Open ↗
08/13/2026M08027636-I1Open ↗
08/13/2026M08032280-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/09/2011120265596Open ↗
04/14/2011120176567Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
09/04/2026M00341960-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/22/2026M01256103-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
03/21/2013121161946Open ↗
07/26/2012121161946Open ↗
07/26/2012121161946Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
07/26/2012121161946Open ↗
10/12/2011120858982Open ↗
02/16/2010120265596Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
01/03/2012120176567Open ↗
01/26/2010120176567Open ↗
▸Other Documents9
▸DOB NOWManufacturer's Specifications4
08/17/2026M01404803-I1Open ↗
08/16/2026M01410583-I1Open ↗
08/16/2026M01410583-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/17/2026M01404803-I1Open ↗
08/16/2026M01410583-I1Open ↗
08/16/2026M01410583-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01129628-I1Open ↗