Condo, industrial/loft conversion [derived]
Bell Atlantic
3 BRYANT PARK · BIN 1087119
💬 Discuss this project
1972Year Built
41Stories
RIBuilding Class
C6-6Zoning
1,041,794 sfGross Floor Area
11Units
LL97 Covered0 Active ViolationsFISP: SAFEFDNY Report ↗
Condo, industrial/loft conversion [derived] · Owner of record: 1095 Ave of the Americas Condo · 56,781 sf lot · 18.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHines Interests Limited Partnership2p · 2 filings · 8 docs
Floor 413 Bp Property Owner8p · 18 filings · 20 docs
Floor 40ApolloUnder Construction16p · 8 filings · 20 docs
Floor 39Apollo26p · 6 filings · 20 docs
Floor 38IMC New York, Standard Chartered Bank +1Under Construction58p · 13 filings · 20 docs
Floor 37Standard Chartered Bank54p · 8 filings · 20 docs
Floor 36Standard Chartered Bank106p · 11 filings · 20 docs
Floor 35Standard Chartered Bank, Bloomberg79p · 9 filings · 20 docs
Floor 34Lloyds Banking Group25p · 3 filings · 15 docs
Floor 33Standard Chartered Bank, Caisse de dépôt et placement du Qué106p · 16 filings · 20 docs
Floor 32China Construction Bank56p · 10 filings · 20 docs
Floor 31Dechert24p · 4 filings · 19 docs
Floor 30Dechert22p · 3 filings · 16 docs
Floor 29Dechert22p · 3 filings · 16 docs
Floor 28DechertUnder Construction6p · 2 filings · 9 docs
Floor 27Dechert21p · 3 filings · 16 docs
Floor 26Dechert22p · 4 filings · 19 docs
Floor 25Standard Chartered Bank, Salesforce +1Under Construction90p · 15 filings · 20 docs
Floor 24SalesforceUnder Construction22p · 5 filings · 20 docs
Floor 23Salesforce9p · 4 filings · 15 docs
Floor 22
Floor 21
Floor 20SalesforceUnder Construction100p · 13 filings · 20 docs
Floor 19SalesforceUnder Construction42p · 6 filings · 20 docs
Floor 18SalesforceUnder Construction72p · 9 filings · 20 docs
Floor 17SalesforceUnder Construction81p · 12 filings · 20 docs
Floor 16SalesforceUnder Construction11p · 2 filings · 12 docs
Floor 15US Bank71p · 1 filing · 20 docs
Floor 14View the Space45p · 6 filings · 20 docs
Floor 13
Floor 12Verizon25p · 6 filings · 20 docs
Floor 11Verizon68p · 9 filings · 20 docs
Floor 10Verizon42p · 7 filings · 20 docs
Floor 9Verizon45p · 6 filings · 20 docs
Floor 8Verizon28p · 3 filings · 13 docs
Floor 7Verizon35p · 5 filings · 20 docs
Floor 6
Floor 5Renaissance Reinsurance73p · 9 filings · 20 docs
Floor 4Stifel Financial119p · 22 filings · 20 docs
Floor 3Stifel Financial86p · 20 filings · 20 docs
Floor 2Whole Foods Market38p · 9 filings · 20 docs
Floor 1Evoke 2.0, Whole Foods MarketUnder Construction100p · 19 filings · 20 docs
Mezzanine3 BP Property Owner LLC4p · 1 filing · 10 docs
CellarEvoke 2.0, Whole Foods Market76p · 7 filings · 20 docs
Sub-Cellar3 BP Property Owner LLC C/o Hines Interests Limited Partners62p · 5 filings · 20 docs
Site & exteriorPandora, Salesforce21p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hines Interests Limited Partnership43710/16/2026
3 BP Property Owner42607/08/2026
Equity Office Properties31803/21/2026
Verizon New York19507/08/2026
NY-1095 Ave of the Americas17503/21/2026
Eop-Retail LLC C/O Equity12203/21/2026
Eop1095 Retail LLC+ Eop Vim7003/21/2026
New York Telephone Co2503/21/2026
Bell Atlantic1803/21/2026
Nynex703/21/2026
NY-1095 6th Ave503/21/2026
Hines503/21/2026
Met Life Corporate Real Estate403/21/2026
Nynex Room403/21/2026
Metlife303/21/2026
Asics203/21/2026
CM & Associates103/21/2026
Gigunda Group103/21/2026
Benson Industries103/21/2026
Whole Foods Market103/21/2026
Callahan Capital Properties103/21/2026
3 BP Property Manager103/21/2026
NYC Department of Housing Preservation and Development103/21/2026
NY Tel. Co103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LB&B Associates1009/30/2026
Stantec Consulting1809/23/2026
Natasha L Suzansky Architect1209/23/2026
CFS Engineering1509/21/2026
Perkins and Will209/14/2026
Robert Derector Associates3709/10/2026
MG Engineering307/15/2026
Building Studio Architects107/14/2026
Ove Arup & Partners3407/10/2026
AMA Consulting Engineers2106/08/2026
M Moser Associates1103/05/2026
Salvator A. Caradonna JR112/03/2025
5th Floor Design911/21/2025
Interior Management1811/20/2025
CPG Architects & Planners211/13/2025
TPG Architecture310/15/2025
Urban Integrations410/13/2025
Lga Partners210/09/2025
CS Engineering PC (CBP Engineering)210/01/2025
SBLM Architects109/16/2025
E2 Engineers109/16/2025
Gregory M. Steinmetz, PE607/30/2025
RSP Architecture & Engineering207/29/2025
WFC Architects303/25/2025
WB Engineers & Consultants703/20/2025
Gilsanz Murray Steficek1011/20/2024
CPG Architects411/12/2024
Gensler408/29/2024
HLW International204/12/2024
John F. Giuseffi, Architect603/19/2024
Office of James Ruderman203/14/2024
Randall P. Collins Architect512/15/2023
Robert Silman Associates Structural Engineering110/12/2023
AKF Engineers1208/04/2023
Cosentini Associates407/11/2023
Lilker Associates Consulting Engineering301/13/2023
Eab Architectural Designs306/08/2022
Jacobson Shinoda Architects102/23/2022
Newtec Engineering106/10/2021
Building106/03/2021
Stantec905/27/2021
Aml Consulting Engineers105/12/2020
Cthree Architecture + Design512/06/2019
S.M. Berger Architecture111/18/2019
Murdoch Engineering111/04/2019
Joel Phagoo P.E204/10/2019
Richard Wainer Architect105/09/2018
R Scott Lewis PE103/22/2018
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JT Magen & CompanyGeneral Contractor4007/08/2026
Structure ToneGeneral Contractor3007/08/2026
Theodore Williams ConstructionGeneral Contractor1510/04/2026
Sirina Fire ProtectionFire Protection1207/08/2026
James E FitzgeraldGeneral Contractor1209/24/2026
Clune Construction CoGeneral Contractor1007/08/2026
Tishman InteriorsGeneral Contractor1007/08/2026
Benchmark BuildersGeneral Contractor1007/08/2026
Gannon ContractingGeneral Contractor907/08/2026
Preferred Sprinkler and MechanicalFire Protection907/08/2026
Lab Plumbing & Heating CoPlumbing810/03/2026
JRM Construction ManagementGeneral Contractor707/08/2026
Vanguard Construction andGeneral Contractor607/08/2026
Par Plumbing CoPlumbing610/01/2026
Par Fire ProtectionFire Protection610/16/2026
Aggressive Fire ProtectionFire Protection610/02/2026
New York Construction AssociatesGeneral Contractor607/08/2026
M&T Plumbing and Heating CoPlumbing507/08/2026
Skyline Scaffolding GroupScaffold507/08/2026
Abco-Peerless SprinklerFire Protection507/08/2026
Dfe ContractorGeneral Contractor407/08/2026
Mac FelderPlumbing407/08/2026
Cross ManagementGeneral Contractor407/08/2026
Ashland PlumbingPlumbing407/08/2026
Preferred MechanicalPlumbing307/08/2026
Patriot ElectricElectrical303/21/2026
Pugliese FrankElectrical303/21/2026
Tristate Air Conditioningspecialty_contractor303/21/2026
Spring ScaffoldingScaffold304/09/2026
Balaton ConsultingSign hanger307/08/2026
Denko MechanicalFire Protection207/08/2026
NJS Electrical ServicesElectrical203/21/2026
Ashlar MechanicalFire Protection207/08/2026
Soh Par SprinklerFire Protection207/08/2026
Henegan Construction CoGeneral Contractor203/21/2026
Winick ProductionsGeneral Contractor203/21/2026
Commerical Plumbing SvcesPlumbing107/08/2026
Geoffrey A. Lagas & AssociatesPlumbing107/08/2026
Just Plumbing & HeatingPlumbing107/08/2026
RXR Construction ServiceGeneral Contractor107/22/2026
P.E. StoneElectrical103/22/2026
MJH Energy ConsultingFire Protection107/25/2026
NJS Electrical ServicesElectrical103/22/2026
JRD ElectricElectrical103/22/2026
Off Shore ElectricElectrical103/21/2026
Preferred PipingPlumbing107/08/2026
Ampere Electrical ServicesElectrical103/21/2026
Timbil Mechanicalspecialty_contractor107/08/2026
Lawrence J. LevineFire Protection103/21/2026
Tower Fire ProtectionFire Protection107/08/2026
Tristate Plumbing ServicesPlumbing107/08/2026
National MaintenanceSign hanger107/08/2026
Donnelly Mechanicalspecialty_contractor107/08/2026
Black Bull BuldersGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Codegreen5104409/30/2026
MEP Inspections11024309/23/2026
Consulting and Testing SE6152207/15/2026
Alan Margolin & Associates4235007/10/2026
Project Tactical Solution58592703/05/2026
Skyline Engineering267510/09/2025
Whitestone Associates Engineering8144410/01/2025
Socotec Engineering49831006/20/2025
Crosscheck Inspection Services5441303/25/2025
Katz Engineering238804/24/2024
Milrose Consultants2003210/12/2023
AKF Engineers27511008/04/2023
Atlas ATC Engineering8011606/22/2023
Gilsanz Murray Steficek240505/24/2023
Architectural Engineering6111306/08/2022
Jacobson Shinoda Architects7884102/23/2022
Obaid Mian849106/10/2021
Building Consulting Engineering1034106/03/2021
Walter T. Gorman, P.E., P268303/31/2021
Special Inspection Services1200201/21/2021
Building Lifecycle
All (300)Filed (59)Permit Issued (67)Signed Off (34)Violation (13)Inspection (60)Objection (37)Special Inspection (30)
10/20/2026
Signed off — Alteration
Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.
M01150284-I1
10/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/15/2026
Permit issued — Sprinklers
M01452983-I1-EW-SP
10/02/2026
Permit issued — Plumbing
M01452956-I1-PL
10/01/2026
Permit issued — Sprinklers
M01440434-I1-EW-SP
10/01/2026
Special inspection requirement — Final
David Silverman
10/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
10/01/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
09/30/2026
Filed — Alteration
Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 11th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy.
M01422836-P1
09/30/2026
Filed — Alteration
Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 9th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy.
M01422830-P1
09/30/2026
Filed — Alteration
Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy.
M01422828-P1
09/30/2026
Filed — Alteration
Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy.
M01422841-P1
09/30/2026
Filed — Alteration
Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 10th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy.
M01422832-P1
09/30/2026
Permit issued — Plumbing
M01440432-I1-PL
09/29/2026
Permit issued — Mechanical Systems
M01440430-I1-MS
09/29/2026
Permit issued — General Construction
M01439563-I1-GC
09/24/2026
Signed off — Alteration
Hereby filing concrete equipment pad modifications and minor wall alterations in support of new mechanical equipment and rigging paths on floor 7, and 9 thru 11
M01186392-I1
09/24/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
09/24/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
09/24/2026
Special inspection requirement — Final
David Silverman
09/24/2026
Special inspection requirement — Final
David Silverman
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
09/24/2026
Special inspection requirement — Final
David Silverman
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
09/24/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
09/24/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
09/24/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
09/24/2026
Special inspection requirement — Final
David Silverman
09/24/2026
Special inspection requirement — Final
David Silverman
09/23/2026
Filed — Alteration
Modifications to the existing HVAC System. Removal of ductwork, piping, controls and equipment back to core on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egress or occupancy.
M01440430-I1
09/23/2026
Filed — Alteration
Modifications to the existing Sprinkler System: Remove (48) existing sprinkler heads, Install (41) new sprinkler heads and associated sprinkler piping on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egress or occupancy.
M01440434-I1
09/23/2026
Filed — Alteration
Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (Hines - Demo.) No change to use, egress or occupancy.
M01439563-I1
09/23/2026
Signed off — Alteration
M01186398-I1
09/23/2026
Filed — Alteration
Removal of two (2) sinks, one (1) WC and associated CW/sanitary piping on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egress or occupancy. No change to use, egress or occupancy.
M01440432-I1
09/23/2026
Permit issued — General Construction
M01452902-I1-GC
09/22/2026
Permit issued — Mechanical Systems
M01452954-I1-MS
09/21/2026
Filed — Alteration
Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 12th Floor as per plans (Verizon Demo Phase.) No change to use, egress or occupancy.
M01422906-I1
09/21/2026
Filed — Alteration
Removal of plumbing fixtures and associated CW/sanitary piping on the 12th Floor as per plans (Verizon Demo Phase.) No change to use, egress or occupancy.
M01422923-I1
09/18/2026
Filed — Alteration
Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy.
M01422841-I1
09/17/2026
Permit issued — General Construction
M01439555-I1-GC
09/16/2026
Permit issued — Sprinklers
M01440267-I1-EW-SP
09/15/2026
Permit issued — Plumbing
M01440259-I1-PL
09/14/2026
Signed off — Alteration
Remove (32) sprinkler heads, Install (33) new sprinkler heads, Relocate (1) sprinkler head and (1) FHC and associated SP/SD piping on the 3rd Floor; Relocate (2) sprinkler heads on the 4th Floor as per plans (Stifel - New Offices & Conference Rooms.)
M01289977-I1
09/14/2026
Filed — Alteration
Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 38th Floors as per plans (IMC - Buildout Phase.) No change to use, egress or occupancy.
M01452902-I1
09/14/2026
Signed off — Alteration
Modifications to the existing Sprinkler System: Remove (7) heads and Install (7) new heads and piping on 3rd Floor, Remove (6) heads and Install (6) new heads and associated piping on the 4th Floor as per plans (Stifel Restroom Project.)
M01089357-I1
09/14/2026
Permit issued — Mechanical Systems
M01440227-I1-MS
09/10/2026
Filed — Alteration
Removal of plumbing fixtures and associated CW/sanitary piping on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy. No change to use, egress or occupancy.
M01440259-I1
09/10/2026
Filed — Alteration
Modifications to the existing Sprinkler System: Remove (277) existing sprinkler heads, Install (43) new sprinkler heads and associated sprinkler piping on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy.
M01440267-I1
09/10/2026
Filed — Alteration
Modifications to the existing Sprinkler System: Remove (3) heads, relocate (21) heads and Install (7) new sprinkler heads and associated piping on the 38th Floor as per plans (IMC Buildout.) No change to use, egress or occupancy.
M01452983-I1
09/10/2026
Filed — Alteration
Modifications to the existing HVAC System: Installation and relocation of ductwork and returns on the 38th Floor as per plans (IMC Buildout Phase.) No change to use, egress or occupancy.
M01452954-I1
09/10/2026
Filed — Alteration
Install new plumbing fixtures and associated CW/sanitary piping on the 38th Floors as per plans (IMC Buildout Phase.) No change to use, egress or occupancy.
M01452956-I1
09/10/2026
Filed — Alteration
Modifications to the existing HVAC System. Install new ductwork, piping, controls and equipment on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy.
M01440227-I1
09/10/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
09/10/2026
Special inspection requirement — Energy Code Compliance Inspections
James Sullivan Jr
09/10/2026
Special inspection requirement — Interior lighting power
James Sullivan Jr
09/10/2026
Special inspection requirement — Maintenance information
James Sullivan Jr
09/10/2026
Special inspection requirement — Lighting controls
James Sullivan Jr
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPar Fire Protection10/15/2026
DOB NOWPlumbingPermit IssuedLab Plumbing & Heating Co10/02/2026
DOB NOWSprinklersPermit IssuedAggressive Fire Protection10/01/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co09/30/2026
DOB NOWMechanical SystemsPermit IssuedTheodore Williams Construction09/29/2026
DOB NOWGeneral ConstructionPermit IssuedTheodore Williams Construction09/29/2026
DOB NOWGeneral ConstructionPermit IssuedJames E Fitzgerald09/23/2026
DOB NOWMechanical SystemsPermit IssuedJames E Fitzgerald09/22/2026
DOB NOWGeneral ConstructionPermit IssuedTheodore Williams Construction09/17/2026
DOB NOWSprinklersPermit IssuedAggressive Fire Protection09/16/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co09/15/2026
DOB NOWMechanical SystemsPermit IssuedTheodore Williams Construction09/14/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co08/28/2026
DOB NOWGeneral ConstructionPermit IssuedJames E Fitzgerald08/26/2026
DOB NOWMechanical SystemsPermit IssuedJames E Fitzgerald08/24/2026
DOB NOWSprinklersSigned-offMJH Energy Consulting07/24/2026
DOB NOWGeneral ConstructionSigned-offRXR Construction Service07/21/2026
DOB NOWMechanical SystemsPermit IssuedClune Construction Co06/23/2026
DOB NOWPlumbingPermit IssuedLab Plumbing & Heating Co02/17/2026
DOB NOWSprinklersPermit IssuedLawrence J. Levine02/12/2026
DOB NOWGeneral ConstructionPermit IssuedJT Magen & Company01/23/2026
DOB NOWSignPermit IssuedNational Maintenance12/22/2025
DOB NOWMechanical SystemsPermit IssuedStructure Tone12/04/2025
DOB NOWMechanical SystemsSigned-offClune Construction Co12/01/2025
DOB NOWGeneral ConstructionPermit IssuedStructure Tone11/26/2025
DOB NOWMechanical SystemsSigned-offStructure Tone11/10/2025
DOB NOWMechanical SystemsSigned-offStructure Tone11/10/2025
DOB NOWPlumbingPermit IssuedPreferred Mechanical11/07/2025
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler11/07/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone11/03/2025
DOB NOWSprinklersSigned-offPreferred Sprinkler and Mechanical10/29/2025
DOB NOWStandpipeSigned-offPreferred Sprinkler and Mechanical10/29/2025
DOB NOWSprinklersSigned-offAshlar Mechanical10/27/2025
DOB NOWGeneral ConstructionSigned-offTishman Interiors10/24/2025
DOB NOWMechanical SystemsSigned-offTishman Interiors10/24/2025
DOB NOWGeneral ConstructionSigned-offGannon Contracting10/17/2025
DOB NOWPlumbingSigned-offPreferred Piping10/16/2025
DOB NOWMechanical SystemsSigned-offGannon Contracting10/16/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding10/14/2025
DOB NOWSupported ScaffoldPermit IssuedSpring Scaffolding10/14/2025
+ 60 more permits on file
2 projects · most recent 06/08/2026
Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2026Permit IssuedClune Construction CoAir Conditioning Systems
Cooling
Florida Heat Pump CL048 46,300 BTU · Wshp ×1
10/01/2025——Refrigeration Systems
Refrigeration
Copeland ZBD57KCE-TF5 81,800 BTU · Condensing Unit ×2
ZBD38KCE-TF5 46,000 BTU · Condensing Unit ×1
9 projects · most recent 09/23/2026
FiledStatusContractorScope
09/23/2026Permit IssuedAggressive Fire Protection89 heads
09/10/2026Permit IssuedAggressive Fire Protection320 heads
09/10/2026Permit IssuedPar Fire Protection31 heads
07/15/2026Signed-offMJH Energy Consulting17 heads
07/10/2026Signed-offAbco-Peerless Sprinkler462 heads
12/01/2025Permit IssuedPar Fire Protection52 heads
10/08/2025Signed-offPreferred Sprinkler and Mechanical68 heads, 1 outlets
04/15/2024Permit IssuedPar Fire Protection175 heads
05/12/2020——1 heads
18 projects · most recent 09/23/2026
Water/Sanitary
FiledStatusContractorScope
09/23/2026Permit IssuedPar Plumbing CoWater/Sanitary
09/21/2026——Water/Sanitary
09/10/2026Permit IssuedPar Plumbing CoWater/Sanitary
09/10/2026Permit IssuedLab Plumbing & Heating CoWater/Sanitary
08/19/2026Permit IssuedPar Plumbing CoWater/Sanitary
08/11/2026——Water/Sanitary
08/11/2026——Water/Sanitary
08/10/2026——Water/Sanitary
08/10/2026——Water/Sanitary
07/10/2026Permit IssuedLab Plumbing & Heating CoWater/Sanitary
07/10/2026———
11/03/2025Permit IssuedPreferred MechanicalWater/Sanitary
10/08/2025———
10/08/2025Signed-offPreferred PipingWater/Sanitary
09/18/2025——Water/Sanitary
25 projects · most recent 10/14/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
10/14/2026Permit IssuedPremier Electric—
10/07/2026Permit IssuedPremier ElectricGeneral Wiring
07/23/2026Permit IssuedKleinknecht Electric CoGeneral Wiring
03/16/2026Permit IssuedStriano Electric CoGeneral Wiring
03/03/2026CompleteHatzel and BuehlerGeneral Wiring
12/25/2025Permit IssuedProff Electrical—
12/11/2025Permit IssuedKleinknecht Electric CoGeneral Wiring
12/02/2025CompleteH. & L. ElectricGeneral Wiring
11/11/2025CompleteJam Electrical—
10/20/2025CompleteForest ElectricGeneral Wiring
09/22/2025Permit IssuedTop Shelf Electric—
08/12/2025CompleteKleinknecht Electric CoGeneral Wiring
08/02/2025CompleteJam Electrical—
07/29/2025CompleteJRD Electric—
07/29/2025CompleteJRD ElectricGeneral Wiring
2 projects · most recent 08/20/2026
Concrete
FiledStatusContractorScope
08/20/2026Permit IssuedJames E Fitzgerald1 scope_items
09/16/2025——Concrete
3 projects · most recent 10/13/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/13/2025Permit IssuedSpring ScaffoldingScaffold, Sidewalk Shed
06/03/2021——Scaffold
04/10/2019Permit IssuedSkyline Scaffolding GroupSidewalk Shed
▾Field Inspections (DOB CAP) — 147
DateTypeResultReport
10/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/10/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 147.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/01/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
10/01/2026FinalDavid Silvermanprogress
10/01/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
09/24/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
09/24/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
09/24/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
09/24/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
09/24/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
09/24/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
09/24/2026FinalDavid Silvermanprogress
09/24/2026FinalDavid Silvermanprogress
09/24/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
09/24/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
09/24/2026FinalDavid Silvermanprogress
09/24/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
09/24/2026FinalDavid Silvermanprogress
09/24/2026FinalDavid Silvermanprogress
09/24/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
09/10/2026Maintenance informationJames Sullivan Jrenergy_progress
09/10/2026Lighting controlsJames Sullivan Jrenergy_progress
09/10/2026Interior lighting powerJames Sullivan Jrenergy_progress
09/10/2026Post-installed AnchorsJames Sullivan Jrspecial
09/10/2026Energy Code Compliance InspectionsJames Sullivan Jrprogress
08/28/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
08/28/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
IMC New YorkOfficeFloor 38
Project M01452902 Alteration · Permit Entire · 09/14/2026
Project M01452954 Alteration · Permit Entire · 09/10/2026
Project M01452956 Alteration · Permit Entire · 09/10/2026
Project M01452983 Alteration · Permit Entire · 09/10/2026
Project M01444946 Alteration · Permit Entire · 08/20/2026
Project M01444964 Alteration · Permit Entire · 08/20/2026
Project M01445358 Alteration · Permit Entire · 08/19/2026
DechertOfficeFloors 25–31
Project M01393158 Alteration · Permit Entire · 06/08/2026
Project M01316773 Alteration · LOC Issued · 11/19/2025
Project M01022596 Alteration · LOC Issued · 04/15/2024
Project M01023136 Alteration · LOC Issued · 04/15/2024
Project M01023169 Alteration · Permit Entire · 04/15/2024
Project M01022315 Alteration · LOC Issued · 04/12/2024
Project M00934624 Alteration · LOC Issued · 10/12/2023
Project M00934636 Alteration · LOC Issued · 10/12/2023
Standard Chartered BankOfficeFloors 25, 33, 35–38
Project M01332572 No Work · PA Certificate of Operation Issued · 01/21/2026
Project M01225244 Alteration CO · Permit Entire · 07/30/2025
Project M01049629 Alteration · LOC Issued · 06/24/2025
Project M01049684 Alteration · LOC Issued · 04/30/2025
Project M01049665 Alteration · LOC Issued · 04/29/2025
Project M01049698 Alteration · LOC Issued · 04/29/2025
Project M01159098 Alteration · LOC Issued · 01/21/2025
Project M01159139 Alteration · LOC Issued · 01/17/2025
Project M01159150 Alteration · LOC Issued · 01/17/2025
Project M01159156 Alteration · LOC Issued · 01/17/2025
Project M01143865 Alteration · LOC Issued · 11/27/2024
Project M01143980 Alteration · LOC Issued · 11/26/2024
PandoraRetailFloor 1
Project M01265317 Alteration · Permit Entire · 12/03/2025
SalesforceOfficeFloors 16–20, 23–25
Project M01311724 Alteration · Permit Entire · 12/01/2025
Project M01311726 Alteration · Permit Entire · 12/01/2025
Project M01311717 Alteration · Permit Entire · 11/26/2025
Project M01311708 Alteration · Permit Entire · 11/20/2025
Project M01305496 Alteration · Permit Entire · 11/03/2025
Project M01305520 Alteration · Permit Entire · 11/03/2025
Project M01305340 Alteration · Permit Entire · 10/31/2025
Project M01305383 Alteration · LOC Issued · 10/31/2025
Project M01305482 Alteration · Permit Entire · 10/31/2025
Project M01134876 Alteration · LOC Issued · 11/20/2024
Project M01135825 Alteration · LOC Issued · 11/20/2024
Project M01004162 Alteration · LOC Issued · 03/13/2024
Stifel FinancialOfficeFloors 3, 4
Project M01289852 Alteration · LOC Issued · 10/10/2025
Project M01289860 Alteration · LOC Issued · 10/08/2025
Project M01289904 Alteration · LOC Issued · 10/08/2025
Project M01289977 Alteration · LOC Issued · 10/08/2025
Project M01089328 Alteration · LOC Issued · 08/19/2024
Project M01089354 Alteration · LOC Issued · 08/16/2024
Project M01089357 Alteration · LOC Issued · 08/16/2024
Project M01089150 Alteration · LOC Issued · 08/15/2024
Project M01031363 Alteration · LOC Issued · 04/24/2024
Project M01031337 Alteration · LOC Issued · 04/18/2024
Project M01031376 Alteration · LOC Issued · 04/16/2024
Project M01030737 Alteration · LOC Issued · 04/15/2024
Whole Foods MarketSupermarketCellar, Floors 1, 2
Project M01251201 Alteration · Approved · 10/01/2025
Project M01251223 Alteration · Approved · 09/18/2025
Project M01251154 Alteration · Approved · 09/16/2025
Project M01251171 Alteration · Approved · 09/16/2025
Evoke 2.0RetailCellar, Floor 1
Project M01224650 Alteration · Permit Entire · 06/03/2025
Project M01224682 Alteration · Permit Entire · 06/03/2025
Project M01224688 Alteration · Permit Entire · 06/03/2025
Project M01234753 Alteration · Permit Entire · 06/03/2025
US BankOfficeFloor 15
Project M01179121 Alteration · LOC Issued · 03/24/2025
VerizonTelecom siteFloors 7–12
Project M01150273 Alteration · LOC Issued · 01/20/2025
Project M00855617 Alteration · LOC Issued · 05/23/2023
Project M01422906 Alteration · Approved · 09/21/2026
Project M01422923 Alteration · Approved · 09/21/2026
Project M01422841 Alteration · Approved · 09/18/2026
Project M01422895 Alteration · Approved · 08/11/2026
Project M01422919 Alteration · Approved · 08/11/2026
Project M01422922 Alteration · Approved · 08/11/2026
Project M01422828 Alteration · Approved · 08/10/2026
Project M01422830 Alteration · Approved · 08/10/2026
Project M01422832 Alteration · Approved · 08/10/2026
Project M01422836 Alteration · Approved · 08/10/2026
Caisse de dépôt et placement du Québec (CDPQ)OfficeFloor 33
Project M01081142 Alteration · LOC Issued · 09/30/2024
Project M01081166 Alteration · LOC Issued · 09/30/2024
Project M01081172 Alteration · LOC Issued · 09/30/2024
Project M01080330 Alteration · LOC Issued · 09/26/2024
Project M01081075 Alteration · LOC Issued · 09/26/2024
View the SpaceOfficeFloor 14
Project M00897642 Alteration · LOC Issued · 08/03/2023
Project M00898024 Alteration · LOC Issued · 08/03/2023
Project M00898051 Alteration · LOC Issued · 08/03/2023
Project M00898089 Alteration · LOC Issued · 08/03/2023
China Construction BankOfficeFloor 32
Project M00898374 Alteration · LOC Issued · 07/11/2023
Project M08040300 Alteration · LOC Issued · 12/23/2022
Project M08040371 Alteration · LOC Issued · 12/21/2022
Project M08040397 Alteration · LOC Issued · 12/21/2022
Project M08039888 Alteration · LOC Issued · 12/12/2022
Project M08039839 Alteration · LOC Issued · 12/09/2022
Renaissance ReinsuranceOfficeFloor 5
Project M00800216 Alteration · LOC Issued · 01/13/2023
Project M00800232 Alteration · LOC Issued · 01/13/2023
Project M00800245 Alteration · LOC Issued · 01/13/2023
Project M00800144 Alteration · LOC Issued · 01/12/2023
BloombergOfficeFloor 35
Project M07995172 Alteration · LOC Issued · 01/10/2023
Project M07995180 Alteration · Permit Entire · 01/10/2023
Lloyds Banking GroupOfficeFloor 34
Project M00677484 Alteration · LOC Issued · 03/02/2022
Project M00677717 Alteration · LOC Issued · 03/02/2022
Project M00677438 Alteration · LOC Issued · 02/23/2022
ApolloOfficeFloors 38–40
Project M00595148 Alteration · LOC Issued · 10/12/2021
Project M00595236 Alteration · LOC Issued · 10/12/2021
Project M00595364 Alteration · LOC Issued · 10/12/2021
Project M00595417 Alteration · LOC Issued · 10/12/2021
Project M00464767 Alteration · Permit Entire · 03/31/2021
Project M00480668 Alteration · LOC Issued · 03/31/2021
Project M00480714 Alteration · LOC Issued · 03/30/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 8,816 on file (BIS + DOB NOW)
▸Plans & Drawings298
▸DOB NOWPlans/Sketch233
10/13/2026M01439555-I1Request digital key ↗
10/13/2026M01440259-I1Request digital key ↗
10/13/2026M01440267-I1Request digital key ↗
Showing 3 of 233 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly27
09/05/2026M00147124-I1Request digital key ↗
09/05/2026M00153342-I1Request digital key ↗
09/05/2026M00161814-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler11
09/04/2026M00341205-I1Request digital key ↗
09/04/2026M00408350-I1Request digital key ↗
09/04/2026M00474978-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems8
09/05/2026M00320795-I1Request digital key ↗
09/05/2026M00334488-I1Request digital key ↗
09/04/2026M00408320-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/04/2026M00474436-I1Request digital key ↗
09/03/2026M00464767-I1Request digital key ↗
09/03/2026M00456501-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00320826-I1Request digital key ↗
09/04/2026M00408337-I1Request digital key ↗
09/04/2026M00474907-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/06/2026M00088091-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00244401-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/05/2026M00224488-I1Request digital key ↗
▸Applications & Permits1,615
▸BISPLAN / WORK APPROVAL APPLICATION919
02/27/2026110426717Open ↗
02/24/2026110426717Open ↗
02/18/2026110426717Open ↗
Showing 3 of 919 on file for this type
▸BISWORK PERMIT APPLICATION666
02/01/2021123875299Open ↗
11/28/2020140982934Open ↗
Showing 2 of 666 on file for this type
▸BISPLACE OF ASSEMBLY25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT I: CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Seals & Professional Certifications2,564
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1,226
04/27/2020123875299Open ↗
Showing 1 of 1,226 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature294
10/13/2026M01452983-I1Open ↗
10/05/2026M01422832-P1Open ↗
10/05/2026M01422836-P1Open ↗
Showing 3 of 294 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST238
04/27/2020123875299Open ↗
Showing 1 of 238 on file for this type
▸DOB NOWProgress Inspector Seal & Signature219
10/08/2026M00969241-P1Open ↗
10/08/2026M00969241-P1Open ↗
10/05/2026M01440430-I1Open ↗
Showing 3 of 219 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature218
10/14/2026M01452983-I1Open ↗
10/14/2026M01452983-I1Open ↗
10/14/2026M01452983-I1Open ↗
Showing 3 of 218 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT201
11/23/2020140982934Open ↗
04/27/2020123875299Open ↗
Showing 2 of 201 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM118
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 118 on file for this type
▸BISPC FULL REPORT25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY10
11/23/2020140982934Open ↗
Showing 1 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
11/23/2020140982934Open ↗
Showing 1 of 10 on file for this type
▸BISProfessional and Owner Certification (POC3)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment787
▸BISSELF-CERT PLUMBING NOTICE225
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 225 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE153
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 153 on file for this type
▸BISSCHEDULE B - PLUMBING146
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 146 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA112
01/31/2022123806159Open ↗
12/24/2020123806514Open ↗
11/20/2020123236836Open ↗
Showing 3 of 112 on file for this type
▸BISEQUIPMENT USE PERMITS66
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 66 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8549
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 49 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Safety & Tenant Protection23
▸BISSTREET TREE CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWStreet Tree Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos684
▸DOB NOWDEP ACP-5: Asbestos Assessment Report235
10/13/2026M01452983-I1Open ↗
10/04/2026M01422841-I1Open ↗
10/04/2026M01422841-P1Open ↗
Showing 3 of 235 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)218
08/05/2021121188525Open ↗
11/23/2020140982934Open ↗
04/27/2020123875299Open ↗
Showing 3 of 218 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'188
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 188 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM10
11/20/2020123236845Open ↗
11/20/2020123236836Open ↗
Showing 2 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)9
06/24/2022123806514Open ↗
10/22/2020123236809Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Energy Compliance304
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS205
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 205 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS55
05/21/2021140982934Open ↗
03/08/2021123875299Open ↗
07/02/2020140717758Open ↗
Showing 3 of 55 on file for this type
▸BISTECHNICAL REPORT: ENERGY14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
10/25/2021123492434Open ↗
05/21/2021140982934Open ↗
03/08/2021123875299Open ↗
Showing 3 of 11 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.9
09/04/2026M00431183-I1Open ↗
09/04/2026M00474839-I1Open ↗
Showing 2 of 9 on file for this type
▸Inspections & Test Reports52
▸BISTECHNICAL REPORT: RESPONSIBILITY26
03/14/2025120317479Open ↗
05/21/2021140982934Open ↗
05/21/2021140982934Open ↗
Showing 3 of 26 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs664
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST331
12/02/2025121954867Open ↗
08/10/2023123763392Open ↗
08/10/2023123806159Open ↗
Showing 3 of 331 on file for this type
▸BISADMINISTRATIVE OBJECTIONS215
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 215 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION53
08/05/2021121188525Open ↗
Showing 1 of 53 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE34
02/24/2026110426717Open ↗
02/18/2026110426717Open ↗
02/06/2026110426717Open ↗
Showing 3 of 34 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISFINAL5
08/09/2023123704688Open ↗
08/09/2023123763392Open ↗
06/29/2023123421305Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership848
▸BISCOST AFFIDAVIT839
12/02/2025121954867Open ↗
08/05/2021121188525Open ↗
05/21/2021140982934Open ↗
Showing 3 of 839 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
08/09/2023123704688Open ↗
08/09/2023123763392Open ↗
08/09/2023123806159Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms827
▸BISEFILING COVER SHEET499
04/27/2020123875299Open ↗
Showing 1 of 499 on file for this type
▸BISADDITIONAL INFORMATION169
02/27/2026110426717Open ↗
09/26/2025110426717Open ↗
04/22/2025120519812Open ↗
Showing 3 of 169 on file for this type
▸BISBOROUGH INTAKE FORM136
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 136 on file for this type
▸BISeFiling Job Application Cover Sheet23
11/23/2020140982934Open ↗
Showing 1 of 23 on file for this type
▸Other Documents62
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION52
08/05/2021121188525Open ↗
08/05/2021121188525Open ↗
Showing 2 of 52 on file for this type
▸DOB NOWProperty Ownership Certification6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSupporting Document: Fee Exempt4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type