DOB03/07/2026FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT TIME OF INSPECTION,OBSERVED BROKEN GLASS AT EXPOSURE 1 SOUTH ELEVATION,CRACKIN G/OPENING MORTAR JOINTS AT EXPOSURE 4 EAST ELEVATION MULTI-LOCATIONS.R EMEDY:OWNER TO REPAIR OR REPLACE
ECB02/11/2026TEMPORARY CONSTRUCTION EQUIPMENT ON SITE; EXPIRED PERMIT. NOTE AT THE TIME OF INSPECTION OBSERVED FENCE PERMIT EXPIRED AND NO PERMIT POSTED ON DATABASE. REMEDY: RENEW PERMIT.$6K due
DOB01/05/2026FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 SOUTH ELEVATION CRACK/BROKEN GLASS PANE, CRACK AND OPEN JOINT AT SOUTH EAST CORNER. EXPOSURE 4 CRACK JOINT/OPEN JOINT AT SOUTH EAST SET BACK LINE. REMEDY: REPAIR AND/OR REPLACE
DOB12/18/2025FTM BLDG IN A CODE COMPLIANT MANNER AS NOTED: @ THE TIME OF INSPECTION I OBSERVED ON EXP 1 S.ELEV: DISLODGED STONE; DAMAGED, MISSING MORTAR JOINTS @ MULTI LOC. EXP 4 EAST, DAMAGE MORTAR JOINTS, SHIFT OUT OF PLACE STONE. REMEDY: REPAIR AND REPLACE DAAMGED FACADE
DOB12/18/2025EWO DUE TO UNSAFE CONDITIONS ON THE FACADE & NOTICATION BY SIDEWALK SHED CONTRACTOR TO DOB THAT THE SIDEWALK SHED WILL BE REMOVED WITHOUT THE OWNER PERFORMING FACADE REPAIRS TO CORRECT THE UNSAFE FACADE REMEDY:OWNER TO ARRANGE FOR REINSTALLATION OF SIDEWALK SHED U/DIRECTIO OF AN RDP AT ALL PUBLIC RIGHT OF WAYS
DOB02/22/2023FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
DOB12/09/2021V-DOB VIOLATION - ACTIVE
DOB12/09/2021V-DOB VIOLATION - ACTIVE
DOB12/09/2021V-DOB VIOLATION - ACTIVE
DOB12/09/2021V-DOB VIOLATION - ACTIVE
DOB12/09/2021V-DOB VIOLATION - ACTIVE
DOB12/09/2021V-DOB VIOLATION - ACTIVE
DOB12/04/2021V-DOB VIOLATION - ACTIVE
DOB09/03/2019FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
DOB04/03/2019V-DOB VIOLATION - ACTIVE
DOB11/04/2015V-DOB VIOLATION - ACTIVE
DOB03/29/2000V-DOB VIOLATION - ACTIVE
DOB10/15/1993V-DOB VIOLATION - ACTIVE
DOB03/05/1981V-DOB VIOLATION - ACTIVE
ECB04/20/2026FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #804385. REMEDY: FILE ACCEPTABLE REPORT.Hearing held — result not yet published$1K proposed
ECB03/07/2026TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON SITE-EXPIRED PERMIT. NOTE: AT TIME OF INSPECTION, I OBSERVED CONSTRUCTION FENCE PERMIT EXPIRED ON RECORD AND OBSERVED NO VALID PERMIT. REMEDY: OWNER TO RENEWHearing held — result not yet published
ECB12/18/2025PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. AS NOTED: AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE INADEQUATE SIDEWALK SHED CONDITIONS SUCH AS DAMAGED, MISSING PIECES OF MUDSILLS; ROTTED LOOSE PANothing owed — awaiting certificate of correction
ECB08/27/2025FAILURE TO MAINTAIN A VALID FENCE PERMIT AS PER NYC ADMIN CODE BC 105.8.2. REMEDY: RENEW OR OBTAIN A VALID PERMIT.Nothing owed — awaiting certificate of correction
ECB06/17/2024A.C.27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN EXINothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #904385. REMEDY: SUBMIT ACCEPTABLE REQUNothing owed — awaiting certificate of correction
ECB11/14/2023AT TIME OF INSPECTION OBSERVE SIDEWALK SHED ERECTED AT EXPOSURE # 1 OBSERVE COLUMN IS BENT AND LEANING ,AND PARAPET WALL AT EXPOSURE #1 IS BURNED BY FIRENothing owed — awaiting certificate of correction
ECB11/14/2023AT TIME OF INSPECTION OBSERVE SIDEWALK SHED ERECTED AT EXPOSURE #1THE COLUMN FOR THE SIDEWALK SHED IS BENT AND THE COLUMN BEAM IS NOT SECURE TO COLUMN CLAMP , AND THE MUDSILL IS ROTTED . CREATING AN UNSAFE CONothing owed — awaiting certificate of correction
ECB05/02/2023NOTED: DURING INSPECTION CONCRETE SPALLING AND REBAR EXPOSED AT SUB CELLAR AND CELLAR CEILINGS AND EXPOSE 3 FACADE, SIX FLOOR BLOCK EXIT WALLS HAVE VERTICAL CRACK ON BOTH SIDES FROM FLOOR TO CEILING., REPAIR ANNothing owed — awaiting certificate of correction
ECB02/28/2023AC 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100FT OR MORE IN HNothing owed — awaiting certificate of correction
ECB02/28/2023AC 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FT OR MORE INNothing owed — awaiting certificate of correction
ECB11/01/2021SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE INNothing owed — awaiting certificate of correction
ECB03/30/202127-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE ON10/22Nothing owed — awaiting certificate of correction
ECB03/30/202127-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE ON10/22Nothing owed — awaiting certificate of correction
ECB03/30/202027-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLER AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEETNothing owed — awaiting certificate of correction
ECB11/15/201927-929.1FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY REGISTEREDDESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG 100'OR MORE IN HEIGHTNothing owed — awaiting certificate of correction
ECB11/15/201927-929.1FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY REGISTEREDDESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG 100'OR MORE IN HEIGHTNothing owed — awaiting certificate of correction
ECB06/26/2019FAILURE TO PROVIDE ADEQUATE SAFETY MEASURE, SUCH AS SHED, NETTING ETC WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04, FILED BY QEWI ON 04/03/19. AT THENothing owed — awaiting certificate of correction
ECB08/04/2016FAILURE TO MAINTAIN BLDG WALLS & APPURTANCES.AT THE TIME OF INSPECTION,BROKEN GLASS PANES WERE FOUND AT VARIOUS FLOORS SUCH AS(I)3/F(EAST & WEST SECTION)OF EXPOSURES 1.(II)AT MAIN ROOF'S BULKHEAD-AT BOTH EAST &Nothing owed — awaiting certificate of correction
ECB02/20/2013FAILURE TO MAINTAIN BUILDING WALLS & APPURTENANCES DETERIORIATED BULKHEAD FACADES WERE OBSERVED AS FOLLOWS:A-I/SPALLINGS & REBARS WERE FOUNDAT WEST ELVN OF BH,(ELEVATOR MOTOR ROOM) & BHS II-THE SAME WERE FOUNDNothing owed — awaiting certificate of correction
ECB01/13/2012FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. LEVEL BELOW GRADE LEVEL C REAR. WHITE & BLACK BAGS FULL OF PARKING RECEIPTS POSS. PAPER BAGS FULL OF POSSIBLE RECEIPTS. LOCKERS,CHAIRS,FILES,CLOTHING. REMNothing owed — awaiting certificate of correction
ECB01/13/2012FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING TO EXIT,EXIT DISCHARGE & PUBLIC CORRIDORS ALL FLOORS & STAIRWELLS. REM:ELECTRICAL ENGINEER REPORT REQUIRED OBTAIN PERMITS AS REQNothing owed — awaiting certificate of correction
ECB01/13/2012WORK WITHOUT A PERMIT. WORK NOTED 4TH FL EXTERIOR METAL FRAMED TO SUPPORT EXTERIOR MECHANICAL EQUIPMENT. 4 METAL TUBE SURFACE MT COLUMNS APPROX 15'-0" WIDE 8'-0" HIGH STEEL & SLAB PENETRATIONS AT LOWER FL FIRENothing owed — awaiting certificate of correction
ECB12/10/2009FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER;NO FIRE STOPPING PERBC712.3!DEFECTS NOTED:@ GARAGE'S FIRESTAIR VARIOUS LOCATIONS WALLS BEING W/CINDER BLOCKS FOUND TO BE DISLODGED FROM COLUMNS LEAVING PRIMARYNothing owed — awaiting certificate of correction
ECB04/01/1991FLOOR NUMBERING SIGNS MISSING OR DEFECTIVE: SIGNS DEFECTIVE ON (4,7,11,15,19 & 20TH FLOORS STAIRS B &C ). REMEDY: INSTALL OR REPAIR ALL SIGNS.Nothing owed — awaiting certificate of correction