💬 Discuss this project
1912Year Built
12Stories
O6Building Class
M1-9A/R12Zoning
87,301 sfGross Floor Area
11Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: Ista West 35th Street · 7,406 sf lot · 11.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsISTA West 35th Street, LLC1 filing
RoofBldg Management CO., INC.3p · 2 filings · 9 docs
Floor 10Foundation6p · 3 filings · 9 docs
Floor 9
Floor 8
Floor 7Bldg Management CO., INC.12p · 1 filing · 7 docs
Floor 6Mechanical equipment replacement, 6th floor and roof1 filing · 6 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Bldg Management CO., INC.1 filing · 17 docs
Site & exteriorJerrick Associates, INC.2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ista 3 West 35th Street7803/22/2026
Jerrick Associates503/22/2026
Winoker Realty303/21/2026
3 W 35 ST203/21/2026
3 W 35 St Comp203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York503/21/2026
United Safety Consultants303/21/2026
Angela Rivera303/21/2026
Codegreen103/21/2026
AE Design Solution203/21/2026
K & M Associates503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cauldwell Wingate CoGeneral Contractor807/08/2026
Spring ScaffoldingScaffold303/21/2026
Jerrick AssociatesScaffold203/21/2026
Air Stream Air Conditioningspecialty_contractor210/06/2026
Jerrick AssociatesGeneral Contractor203/21/2026
Accurate MechanicalFire Protection207/08/2026
William C. Gerakaris P&HPlumbing107/08/2026
Aggressive Fire ProtectionFire Protection107/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Quest Builders GroupGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544509/28/2026
Outsource Special Inspection2827110/04/2021
Jack Green Associates422303/23/2020
Building Lifecycle
All (155)Filed (14)Permit Issued (17)Signed Off (11)Facade (FISP) (18)Violation (60)Inspection (5)Special Inspection (30)
10/05/2026
Permit issued — Mechanical Systems
M01397081-I1-MS
09/28/2026
Filed — Alteration
REMOVAL OF EXISTING MECHANICAL EQUIPMENT AND LIMITED DUCTWORK AND REPLACEMENT WITH NEW MECHANICAL EQUIPMENT AND LIMITED DUCTWORK ON THE 6TH FLOOR AND ROOF LEVEL. SCOPE TO NCLUDE REFRIGERANT PIPING INSTALLATION TO ROOF LEVEL.
M01397081-I1
08/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
08/03/2026
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
08/03/2026
Special inspection requirement — Shutoff dampers
EUGENE BIFULCO
08/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
08/03/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
07/09/2026
Cycle 10 facade report submitted
07/09/2026
Cycle 10 facade report signed — SAFE
06/26/2026
Cycle 10 facade inspection completed
05/04/2026
Special inspection requirement — Final
EUGENE BIFULCO
05/04/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
11/14/2025
Signed off — Alteration
MS WORK IN RELATION TO THE COSMETIC REMODELING OF BUILDING LOBBY AND REPLACEMENT OF BUILDING ENTRANCE
M00975988-S2
11/05/2025
Signed off — Alteration
MS WORK IN RELATION TO THE COSMETIC REMODELING OF BUILDING LOBBY AND REPLACEMENT OF BUILDING ENTRANCE
M00975988-I1
06/06/2025
Signed off — Alteration
MS WORK IN RELATION TO THE COSMETIC REMODELING OF BUILDING LOBBY AND REPLACEMENT OF BUILDING ENTRANCE
M00975988-S1
05/29/2025
Signed off — Alteration
MS WORK IN RELATION TO THE COSMETIC REMODELING OF BUILDING LOBBY AND REPLACEMENT OF BUILDING ENTRANCE
M00975988-S3
05/20/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01079935-I1
02/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/31/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/13/2024
Permit issued — General Construction
M00975988-I1-GC
12/13/2024
Permit issued — Structural
M00975988-S3-ST
12/11/2024
Permit issued — Mechanical Systems
M00975988-S2-MS
08/12/2024
Violation issued (ECB, closed)
Boilers
08/08/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01079935-P2
08/06/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01079935-P1
08/01/2024
Permit issued — Plumbing
M00975988-S1-EW-SP
07/30/2024
Permit issued — Plumbing
M00975988-S1-PL
07/12/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01079935-I1
07/12/2024
Permit issued — Construction Fence
M01079935-I1-FN
07/01/2024
Permit issued — Structural
M00975988-S3-ST
06/03/2024
Permit issued — General Construction
M00975988-I1-GC
06/03/2024
Permit issued — Mechanical Systems
M00975988-S2-MS
04/01/2024
Filed — Alteration
MS WORK IN RELATION TO THE COSMETIC REMODELING OF BUILDING LOBBY AND REPLACEMENT OF BUILDING ENTRANCE
M00975988-S2
04/01/2024
Filed — Alteration
MS WORK IN RELATION TO THE COSMETIC REMODELING OF BUILDING LOBBY AND REPLACEMENT OF BUILDING ENTRANCE
M00975988-S1
03/26/2024
Filed — Alteration
MS WORK IN RELATION TO THE COSMETIC REMODELING OF BUILDING LOBBY AND REPLACEMENT OF BUILDING ENTRANCE
M00975988-I1
03/26/2024
Filed — Alteration
MS WORK IN RELATION TO THE COSMETIC REMODELING OF BUILDING LOBBY AND REPLACEMENT OF BUILDING ENTRANCE
M00975988-S3
02/02/2024
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
02/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
02/02/2024
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
02/02/2024
Special inspection requirement — Structural Cold-Formed Steel
EUGENE BIFULCO
02/02/2024
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
12/12/2023
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
12/12/2023
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
12/12/2023
Special inspection requirement — Final
EUGENE BIFULCO
12/12/2023
Special inspection requirement — Final
EUGENE BIFULCO
08/23/2022
Cycle 9 facade report submitted
08/03/2022
Cycle 9 facade report signed — SAFE
08/02/2022
Cycle 9 facade inspection completed
05/19/2022
Signed off — Alteration
FILING FOR FACADE REPAIRS AS SHOWN ON PLANS SUBMITTED HEREWITH. O CHANGE IN USE, EGRESS OR OCCUPANCY.
M00603007-I1
02/17/2022
Signed off — Alteration
M00553758-I1
10/06/2021
Permit issued — General Construction
M00603007-I1-GC-CX
10/04/2021
Filed — Alteration
FILING FOR FACADE REPAIRS AS SHOWN ON PLANS SUBMITTED HEREWITH. O CHANGE IN USE, EGRESS OR OCCUPANCY.
M00603007-I1
09/30/2021
Special inspection requirement — Air barrier - visual inspection
Michael Larkin
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
Michael Larkin
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAir Stream Air Conditioning10/05/2026
DOB NOWGeneral ConstructionSigned-offCauldwell Wingate Co12/13/2024
DOB NOWStructuralSigned-offCauldwell Wingate Co12/13/2024
DOB NOWMechanical SystemsSigned-offCauldwell Wingate Co12/11/2024
DOB NOWSprinklersSigned-offAggressive Fire Protection08/01/2024
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H07/30/2024
DOB NOWConstruction FenceSigned-offSpring Scaffolding07/12/2024
DOB NOWStructuralSigned-offCauldwell Wingate Co07/01/2024
DOB NOWGeneral ConstructionSigned-offCauldwell Wingate Co06/03/2024
DOB NOWMechanical SystemsSigned-offCauldwell Wingate Co06/03/2024
DOB NOWGeneral ConstructionSigned-offGE 2A Construction10/06/2021
DOB NOWSidewalk ShedSigned-offGE 2A Construction07/23/2021
DOB NOWMechanical SystemsSigned-offAir Stream Air Conditioni02/16/2021
DOB NOWSprinklersSigned-offAccurate Mechanical09/03/2019
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating08/09/2019
DOB NOWSprinklersSigned-offAccurate Mechanical08/09/2019
DOB NOWMechanical SystemsSigned-offQuest Builders Group08/01/2019
BISSPISSUEDEL-Roc Contg of Brooklyn12/02/2020
BISSPISSUEDEL-Roc Contg of Brooklyn02/06/2020
BISPLISSUEDEL-Roc Contracting of BK06/05/2019
BISOTISSUEDRJB Contracting Carting05/23/2019
BISOTISSUEDThe Sci Construction02/21/2019
BISMHISSUEDThe Sci Construction02/21/2019
BISPLISSUEDM&T Plumbing and Heating Co02/07/2019
BISSPISSUEDMJH Energy Consulting12/13/2018
BISMHISSUEDThe Sci Construction11/09/2018
BISOTISSUEDThe Sci Construction11/09/2018
BISPLISSUEDDomestic Plumbing07/13/2018
BISSPISSUEDMJH Energy Consulting06/01/2018
BISOTISSUEDDynamic Construction Service05/14/2018
BISMHISSUEDDynamic Construction Service05/14/2018
BISOTISSUEDThe Sci Construction05/01/2018
BISMHISSUEDThe Sci Construction05/01/2018
BISPLISSUEDEL-Roc Contracting of BK03/30/2018
BISOTISSUEDRJB Contracting Carting03/27/2018
BISPLISSUEDGW Mechanical03/26/2018
BISMHISSUEDDynamic Construction Service01/30/2018
BISOTISSUEDDynamic Construction Service01/30/2018
BISPLISSUEDEL-Roc Contracting of BK10/03/2017
BISOTISSUEDRJB Contracting Carting09/26/2017
+ 27 more permits on file
1 project · most recent 09/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/28/2026Permit IssuedAir Stream Air ConditioniHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXYA240AATJA 230,260 BTU · Vrf Outdoor ×1
Oxygen8 TV-B-084 231,760 BTU · Fan Coil Indoor ×1
Ventilation
Greenheck CSP-A700-VG 550 CFM · Exhaust Fan ×1
SQ-100-VG 900 CFM · Exhaust Fan ×1
7 projects · most recent 08/27/2024
General Wiring
FiledStatusContractorScope
08/27/2024CompleteRE-Con ElectricGeneral Wiring
07/12/2021CompleteBorowide Elect'l Contractors—
05/09/2021CompleteDelta Power ElectricalGeneral Wiring
08/18/2020Permit IssuedAlba ElectricGeneral Wiring
11/26/2018Permit IssuedJanon ElectricGeneral Wiring
06/02/2018CompleteTroon Electric of New YorGeneral Wiring
12/04/2017Permit IssuedNee ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/20/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/31/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
08/03/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
08/03/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/03/2026Post-installed AnchorsEUGENE BIFULCOspecial
08/03/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/03/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
08/03/2026Shutoff dampersEUGENE BIFULCOenergy_progress
08/03/2026Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
08/03/2026Maintenance informationEUGENE BIFULCOenergy_progress
05/04/2026FinalEUGENE BIFULCOprogress
05/04/2026Mechanical SystemsEUGENE BIFULCOspecial
02/02/2024Structural Steel - WeldingEUGENE BIFULCOspecial
02/02/2024Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
02/02/2024Structural Steel - DetailsEUGENE BIFULCOspecial
02/02/2024Structural Cold-Formed SteelEUGENE BIFULCOspecial
02/02/2024Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
12/12/2023Sprinkler SystemsEUGENE BIFULCOspecial
12/12/2023Mechanical SystemsEUGENE BIFULCOspecial
12/12/2023FinalEUGENE BIFULCOprogress
12/12/2023FinalEUGENE BIFULCOprogress
09/30/2021Air barrier - visual inspectionMichael Larkinenergy_progress
09/29/2021Energy Code Compliance InspectionsMichael Larkinprogress
09/29/2021Post-installed AnchorsJONAR MADRIAGAspecial
09/29/2021Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
09/29/2021Structural Steel - WeldingJONAR MADRIAGAspecial
09/29/2021FinalMichael Larkinprogress
Latest 25 of 46.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
FoundationOfficeFloor 10
Project M00189879 Alteration · LOC Issued · 07/23/2019
Project M00196701 Alteration · LOC Issued · 07/23/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 808 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
10/04/2026M01397081-I1Request digital key ↗
09/03/2026M00553758-I1Request digital key ↗
09/03/2026M00603007-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00189879-I1Request digital key ↗
09/05/2026M00320765-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00196573-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00196701-I1Request digital key ↗
▸Applications & Permits140
▸BISPLAN / WORK APPROVAL APPLICATION70
02/02/2024123777458Open ↗
12/17/2019123689794Open ↗
07/29/2019123492452Open ↗
Showing 3 of 70 on file for this type
▸BISWORK PERMIT APPLICATION63
12/03/2020123492470Open ↗
02/07/2020123602173Open ↗
07/29/2019123689794Open ↗
Showing 3 of 63 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications228
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION110
03/06/2020123602173Open ↗
03/06/2020123602173Open ↗
12/18/2019123602191Open ↗
Showing 3 of 110 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST28
07/19/2019123689794Open ↗
06/28/2019123777458Open ↗
05/28/2019123894090Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT26
07/19/2019123689794Open ↗
06/28/2019123777458Open ↗
06/28/2019123777458Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
10/05/2026M01397081-I1Open ↗
10/05/2026M01397081-I1Open ↗
09/01/2026M00189879-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
10/04/2026M01397081-I1Open ↗
09/05/2026M00196701-I1Open ↗
09/05/2026M00196573-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
10/05/2026M01397081-I1Open ↗
09/23/2026M00975988-S1Open ↗
09/01/2026M00189879-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL/OWNER SIGNATURES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment73
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
06/28/2019123777458Open ↗
05/28/2019123894090Open ↗
03/05/2019123197780Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
08/11/2021123373198Open ↗
04/02/2021123430741Open ↗
11/23/2020123391409Open ↗
Showing 3 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos43
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
07/19/2019123689794Open ↗
05/24/2019123894090Open ↗
10/31/2018123492470Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
10/04/2026M01397081-I1Open ↗
09/05/2026M00196701-I1Open ↗
09/05/2026M00196573-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00603007-I1Open ↗
▸Energy Compliance63
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
12/18/2019123602191Open ↗
12/18/2019123602191Open ↗
11/04/2019121228509Open ↗
Showing 3 of 37 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
06/24/2020123689794Open ↗
12/18/2019123602191Open ↗
12/17/2019123386503Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/24/2020123689794Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00603007-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/24/2020123689794Open ↗
06/24/2020123689794Open ↗
Showing 2 of 5 on file for this type
▸Approvals, Objections & Sign-offs73
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST42
08/18/2021123373198Open ↗
04/15/2021123430741Open ↗
12/16/2020123492470Open ↗
Showing 3 of 42 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
12/03/2020123492470Open ↗
02/22/2019123443069Open ↗
Showing 2 of 5 on file for this type
▸BISSUPERSEDING LETTER2
02/07/2020123602173Open ↗
02/21/2019123197780Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership84
▸BISCOST AFFIDAVIT84
08/18/2021123373198Open ↗
04/15/2021123430741Open ↗
12/16/2020123492470Open ↗
Showing 3 of 84 on file for this type
▸Filing & Intake Forms77
▸BISEFILING COVER SHEET45
07/19/2019123689794Open ↗
06/28/2019123777458Open ↗
06/28/2019123777458Open ↗
Showing 3 of 45 on file for this type
▸BISBOROUGH INTAKE FORM18
12/03/2020123492470Open ↗
03/06/2020123602173Open ↗
12/18/2019123602191Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION11
01/27/2020123689794Open ↗
Showing 1 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/15/2021123430741Open ↗
07/23/2019123894090Open ↗
Showing 2 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type