Multiplex picture theatre
30-02 WHITESTONE EXPWY
QUEENS · BIN 4462897
💬 Discuss this project
1999Year Built
2Stories
J8Building Class
M1-1Zoning
163,000 sfGross Floor Area
3Units
LL97 Covered3 Open Violations ▸
Multiplex picture theatre · Owner of record: 30-02 WHITESTONE PROPERTY OWNER, LLC · 424,959 sf lot · 0.38 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction22p · 2 filings · 20 docs
Floor 71p · 1 filing · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Under Construction24p · 4 filings · 20 docs
Floor 1Under Construction19p · 2 filings · 20 docs
MezzanineUnder Construction19p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIANGLE EQUITIES8107/08/2026
30-02 WHITESTONE PROPERTY OWNER, LLC103/22/2026
DEVEGA CONSTRACTING LTD403/22/2026
TRIANGLE PLAZA II2203/22/2026
JOY PLAYLAND CORP103/22/2026
FALCO CONSTRUCTION103/22/2026
CITY OF NY, NATIONAL AMUS103/22/2026
VISION GENERAL CONTRACTORS OF GA203/22/2026
ECONOMIC DEVELOPMENT CORP103/21/2026
TRIANGLE PLAZA LL1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.903/21/2026
EXPEDITE DEM603/21/2026
PCA DESIGN CONSULTANTS103/21/2026
ALL IN PERMIT CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DE VEGA CONTRACTING LTDGeneral Contractor807/08/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor607/08/2026
ISLAND ROCK & DIRT CORPGeneral Contractor507/08/2026
JASA NYC GROUP INCGeneral Contractor403/21/2026
HERMAN, MElectrical403/21/2026
LOCAL 5 BOILER MAKERElectrical403/21/2026
SENID PLBG & HTG CORPElectrical303/21/2026
TORRONE, ARTHURElectrical303/21/2026
NATIONAL SIGN LIGHTINGScaffold207/08/2026
GMD SHIPYARD CORPElectrical203/21/2026
JOHN MICHAEL AND SONS ELEElectrical203/22/2026
STAT FIRE SPRINKLER NYC CFire Protection207/01/2026
JD MASTERS PLBG & HTGPlumbing207/08/2026
GENOVESE, JOSEPHElectrical203/21/2026
ROBERT CHAIKINElectrical103/21/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
NATIONAL MAINTENANCE INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLE TECHNOLOGIES/CONTROL12901008/19/2026
SPECIAL TESTING & CONSULT16881008/04/2025
Building Lifecycle
All (220)Filed (33)Permit Issued (25)Signed Off (15)Violation (60)Inspection (24)Objection (63)
08/24/2026
Signed off — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-S6
08/24/2026
Signed off — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-S7
08/19/2026
Filed — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-P9
08/11/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-S7
08/10/2026
Signed off — Alteration
Erect (4) illum wall signs, (1) non-illuminated wall sign & (1) illuminated ground sign on South Elevation. Structure/foundation permit filed separately for ground sign. Erect (1) illuminated wall sign & (1) non-illum wall sign on North Elevati
Q01242607-I1
06/02/2026
Permit issued — General Construction
Q01103126-I1-GC
02/11/2026
Signed off — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-S2
02/11/2026
Signed off — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-S1
01/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/29/2025
Permit issued — General Construction
Q01103126-I1-GC
12/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2025
Filed — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-P6
12/16/2025
Filed — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-P7
11/20/2025
Filed — Alteration
APPLICATION HEREWITH FILED FOR 6 FT HIGH CHAIN LINK FENCE. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK.
Q01313307-I1
11/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/13/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/05/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/26/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
09/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/22/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/17/2025
Objection resolved — Addressed
09/15/2025
Permit issued — General Construction
Q01242835-I1-GC
09/15/2025
Permit issued — Sign
Q01242607-I1-SG
09/15/2025
Permit issued — Sign
Q01242770-I1-SG
09/15/2025
Objection raised — Scope
09/15/2025
Objection resolved — Addressed
09/15/2025
Objection raised — Scope
09/09/2025
Signed off — Alteration
Q01071957-S1
09/02/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-S3
08/27/2025
Filed — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-P5
08/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-S4
08/18/2025
Filed — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-P2
08/18/2025
Filed — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-P3
08/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-S5
08/15/2025
Signed off — Alteration
Q01071957-I1
08/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-S6
08/13/2025
Objection resolved — Addressed
08/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-I1
08/04/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-P7
07/31/2025
Filed — Alteration
Erect (4) illum wall signs, (1) non-illuminated wall sign & (1) illuminated ground sign on South Elevation. Structure/foundation permit filed separately for ground sign. Erect (1) illuminated wall sign & (1) non-illum wall sign on North Elevati
Q01242607-I1
07/31/2025
Filed — Alteration
Q01242835-I1
07/31/2025
Filed — Alteration
ERECT 1 NON-ILLUMINATED WALL SIGN ON EAST ELEVATION (LINDEN PL). ERECT 1 NON-ILLUMINATED WALL SIGN & REPLACE 2 SIGN CABINETS ON EXISTING PYLON STRUCTURE ON WEST ELEVATION (ULMER ST). SIGNS ARE ACCESSORY TO TESLA
Q01242770-I1
07/30/2025
Permit issued — Standpipe
Q01103126-S7-EW-SD
07/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-S2
07/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-S1
07/18/2025
Objection raised — Admin
07/02/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/25/2025
Filed — Alteration CO
Modification to sprinkler system as per plans.
Q01103126-P1
06/25/2025
Permit issued — Construction Fence
Q01071898-S7-FN
06/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/04/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE RELATED TO SITE WORK.
Q01071898-P6
06/03/2025
Permit issued — Plumbing
Q01071898-S6-PL
05/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 220 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDE VEGA CONTRACTING LTD06/02/2026
DOB NOWGeneral ConstructionPermit IssuedDEVEGA CONTRACTING LTD12/29/2025
DOB NOWGeneral ConstructionPermit IssuedNATIONAL MAINTENANCE INC09/15/2025
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC09/15/2025
DOB NOWSignPermit IssuedNATIONAL MAINTENANCE, INC09/15/2025
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C07/30/2025
DOB NOWConstruction FenceSigned-offDEVEGA CONTRACTING LTD06/25/2025
DOB NOWPlumbingSigned-offJD MASTERS PLBG & HTG06/03/2025
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C05/15/2025
DOB NOWMechanical SystemsSigned-offDEVEGA CONTRACTING LTD03/05/2025
DOB NOWStructuralSigned-offDEVEGA CONTRACTING LTD02/24/2025
DOB NOWPlumbingPermit IssuedL.L.G. PLBG & HTG INC02/20/2025
DOB NOWGeneral ConstructionPermit IssuedDEVEGA CONTRACTING LTD01/08/2025
DOB NOWStructuralSigned-offISLAND ROCK DIRT11/27/2024
DOB NOWConstruction FenceSigned-offISLAND ROCK DIRT11/26/2024
DOB NOWEarth WorkSigned-offISLAND ROCK DIRT11/26/2024
DOB NOWStructuralSigned-offNORTHEAST SPECIALIST GROUP11/13/2024
DOB NOWGeneral ConstructionSigned-offJASA NYC GROUP INC11/12/2024
DOB NOWGeneral ConstructionSigned-offJASA NYC GROUP INC11/06/2024
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP09/16/2024
DOB NOWMechanical SystemsSigned-offNORTHEAST SPECIALIST GROUP09/12/2024
DOB NOWPlumbingSigned-offJD MASTERS PLBG & HTG08/16/2024
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO07/25/2024
DOB NOWMechanical SystemsSigned-offNORTHEAST SPECIALIST GROUP07/23/2024
DOB NOWGeneral ConstructionSigned-offNORTHEAST SPECIALIST GROUP07/23/2024
BISPLISSUEDJD MASTERS PLBG & HTG11/01/2021
BISPLISSUEDA & E MECHANICAL CORP02/04/2019
BISOTISSUEDLTCI LTD01/08/2019
BISOTISSUEDLTCI LTD01/08/2019
BISOTISSUEDLTCI LTD01/08/2019
BISOTISSUEDLTCI LTD01/08/2019
BISOTISSUEDLTCI LTD12/05/2018
BISOTISSUEDLTCI LTD01/19/2018
BISOTISSUEDLTCI LTD01/19/2018
BISOTISSUEDLTCI LTD12/11/2017
BISOTISSUEDLTCI LTD12/11/2017
BIS—ISSUEDA.M.A HOLDINGS INC05/25/2010
BIS—ISSUEDA.M.A HOLDINGS INC05/25/2010
BISOTISSUEDJT SERVICES & REPAIRS INC04/15/2010
BISSPISSUEDHEADS UP FIRE SPRINKLER03/23/2007
+ 35 more permits on file
2 projects · most recent 08/19/2026
Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedDEVEGA CONTRACTING LTDHeating and Air Conditioning Systems
Heat / Cool
York KV15N3CQ4S1A 8,000 CFM · Rooftop Unit ×3
KV20N3CQ4S1A 8,850 CFM · Rooftop Unit ×3
KV20N3CQ4F4APCL6F1 8,850 CFM · Rooftop Unit ×3
KV15N3CQ4F4APCL6F1 6,000 CFM · Rooftop Unit ×1
KV20N3CQ4F4A 8,850 CFM · Rooftop Unit ×3
KV15N3CQ4F4A 6,000 CFM · Rooftop Unit ×1
Mitsubishi Electric PKA-A12HA1 12,000 BTU · Vrf Indoor ×2
PKA-A24HA7 24,000 BTU · Split System ×1
PKA-Ai2HA1 12,000 BTU · Vrf Indoor ×1
PKA-A12LA1 12,000 BTU · Split System ×4
PKA-A12LA 12,000 BTU · Split System ×1
PKA-A24KA8 24,000 BTU · Fan Coil Indoor ×2
08/04/2025Signed-offDEVEGA CONTRACTING LTDOthers
Other
N/A NA 11 BTU ×1
2 projects · most recent 08/19/2026
Sprinkler System
FiledStatusContractorScope
08/19/2026Signed-offSTAT FIRE SPRINKLER NYC CSprinkler System
08/04/2025Signed-offCAPITOL FIRE SPRINKLER COSprinkler System
2 projects · most recent 08/19/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/19/2026Permit IssuedL.L.G. PLBG & HTG INCGas, Water/Sanitary
08/04/2025Signed-offJD MASTERS PLBG & HTGGas, Water/Sanitary
12 projects · most recent 01/07/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
01/07/2026CompleteJOHN MICHAEL AND SONS ELEGeneral Wiring, HVAC Wiring
10/08/2025Permit IssuedPROFF ELECTRICAL LLC—
10/08/2025Permit IssuedPROFF ELECTRICAL LLC—
10/08/2025Permit IssuedPROFF ELECTRICAL LLC—
10/08/2025Permit IssuedPROFF ELECTRICAL LLC—
10/08/2025Permit IssuedPROFF ELECTRICAL LLC—
10/08/2025Permit IssuedPROFF ELECTRICAL LLC—
10/08/2025Permit IssuedPROFF ELECTRICAL LLC—
12/24/2018Permit IssuedWELSBACH ELECTRIC CORP.1 meters, 1 new_meters
08/22/2018CompleteTUXEDO ELEC'L CONTR'G INCGeneral Wiring
07/23/2018CompleteTUXEDO ELEC'L CONTR'G INCGeneral Wiring
02/28/2018Permit IssuedSCOTT ELEC'L SERVICE, LLC—
2 projects · most recent 08/19/2026
Concrete Steel
FiledStatusContractorScope
08/19/2026Permit IssuedDEVEGA CONTRACTING LTDSteel, Concrete
08/04/2025Signed-offDEVEGA CONTRACTING LTDConcrete
2 projects · most recent 08/04/2025
Fence
FiledStatusContractorScope
08/04/2025Signed-offDEVEGA CONTRACTING LTDFence
05/23/2024——Fence
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
01/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/05/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/22/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/02/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
01/09/2026Post-installed AnchorsGEORGE ANDERSENspecial
01/09/2026Mechanical SystemsGEORGE ANDERSENspecial
01/09/2026Smoke Control Systems TestingGEORGE ANDERSENspecial
01/09/2026Ventilation and air distribution systemGEORGE ANDERSENenergy_progress
01/09/2026HVAC-R and service water piping design and insulationGEORGE ANDERSENenergy_progress
01/09/2026Shutoff dampersGEORGE ANDERSENenergy_progress
01/09/2026Duct leakage testing, insulation and designGEORGE ANDERSENenergy_progress
01/09/2026HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
01/09/2026HVAC-R and service water heating equipmentGEORGE ANDERSENenergy_progress
01/09/2026FinalGEORGE ANDERSENprogress
01/09/2026Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
01/09/2026Heating SystemsGEORGE ANDERSENspecial
01/09/2026Energy Code Compliance InspectionsGEORGE ANDERSENprogress
11/19/2025Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
11/19/2025Post-installed AnchorsGEORGE ANDERSENspecial
11/19/2025Energy Code Compliance InspectionsGEORGE ANDERSENprogress
11/18/2025Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
11/18/2025Post-installed AnchorsGEORGE ANDERSENspecial
11/18/2025Mechanical SystemsGEORGE ANDERSENspecial
11/18/2025Heating SystemsGEORGE ANDERSENspecial
11/18/2025HVAC-R and service water piping design and insulationGEORGE ANDERSENenergy_progress
11/18/2025Duct leakage testing, insulation and designGEORGE ANDERSENenergy_progress
11/18/2025Shutoff dampersGEORGE ANDERSENenergy_progress
11/18/2025HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
11/18/2025Ventilation and air distribution systemGEORGE ANDERSENenergy_progress
Latest 25 of 81.
▾Documents — 203 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
08/21/2026Q01103126-P9Request digital key ↗
08/21/2026Q01103126-P7Request digital key ↗
08/21/2026Q01103126-P6Request digital key ↗
Showing 3 of 33 on file for this type
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION16
04/12/2022402181919Open ↗
02/06/2019421699905Open ↗
01/08/2019421578983Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
01/25/2022421753926Open ↗
11/10/2020402181919Open ↗
02/25/2020421753926Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q01103126-P5Open ↗
08/13/2026Q01103126-I1Open ↗
08/13/2026Q01103126-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01103126-P5Open ↗
08/13/2026Q01103126-I1Open ↗
08/13/2026Q01103126-P1Open ↗
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/22/2026Q01043960-I1Open ↗
08/21/2026Q01103126-P6Open ↗
08/21/2026Q01103126-P7Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/29/2026Q01071898-S5Open ↗
09/01/2026Q01103126-P6Open ↗
09/01/2026Q01103126-P6Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/29/2026Q01071898-S5Open ↗
09/29/2026Q01071898-S5Open ↗
09/01/2026Q01103126-P6Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
02/25/2020421753926Open ↗
05/06/2019421699905Open ↗
12/17/2018421699905Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/07/2010420182313Open ↗
05/07/2010420182304Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/07/2010420182313Open ↗
05/07/2010420182304Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/28/2018421699905Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026Q01103126-P8Open ↗
08/13/2026Q01103126-P1Open ↗
08/13/2026Q01103126-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/07/2010420182313Open ↗
05/07/2010420182304Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/23/2010420165038Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/06/2019421699905Open ↗
12/17/2018421699905Open ↗
11/28/2018421699905Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
05/08/2019421699905Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS3
05/07/2010420182313Open ↗
05/07/2010420182304Open ↗
03/23/2010420165038Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/20/2019421699905Open ↗
06/02/2010420165038Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/06/2019421699905Open ↗
06/05/2010420165038Open ↗
▸BISSUPERSEDING LETTER1
04/12/2022402181919Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
02/25/2020421753926Open ↗
05/08/2019421699905Open ↗
11/28/2018421699905Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET8
02/25/2020421753926Open ↗
11/28/2018421699905Open ↗
11/28/2018421699905Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM2
04/12/2022402181919Open ↗
11/10/2020402181919Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/21/2026Q01103126-P5Open ↗
08/21/2026Q01103126-P1Open ↗
08/21/2026Q01103126-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01043960-I1Open ↗